R315-265. Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities  


R315-265-1. Incorporation, General -- Purpose, Scope, and Applicability
Latest version.

  40 CFR 265.270 through 265.282, 265.300 through 265.316, 265.340 through 265.352, 265.370 through 265.383, 265.400 through 265.406, 265.430, 265.440 through 265.445, 265.1030 through 265.1035, 265.1050 through 265.1064, 265.1080 through 265.1091, 265.1100 through 265.1102, 265.1200 through 265.1202, 265.1300 through 265.1316 and Appendices I and III through VI of 40 CFR 265, 2015 edition, as amended by 81 FR 85827, are adopted and incorporated by reference except that "Director" is substituted for all references to "Regional Administrator", and for all references to "EPA" or "Environmental Protection Agency" except for references to "EPA identification number" and where EPA is used in reference to actions under Subsection R315-268-42(b) and in Subsection R315-265-71(a)(3).

  (a) The purpose of Rule R315-265 is to establish minimum standards that define the acceptable management of hazardous waste during the period of interim status and until certification of final closure or, if the facility is subject to post-closure requirements, until post-closure responsibilities are fulfilled.

  (b) Except as provided in 40 CFR 265.1080(b), which is adopted and incorporated by reference, the standards of Rule R315-265, and of Sections R315-264-552, R315-264-553, and R315-264-554, apply to owners and operators of facilities that treat, store or dispose of hazardous waste who have fully complied with the requirements for interim status under section 3005(e) of RCRA and Section R315-270-10 until either a permit is issued under Rule R315-270 or until applicable Rule R315-265 closure and post-closure responsibilities are fulfilled, and to those owners and operators of facilities in existence on November 19, 1980 who have failed to provide timely notification as required by section 3010(a) of RCRA, failed to file Part A of the permit application as required by Subsections R315-270-10 (e) and (g), or both. These standards apply to all treatment, storage and disposal of hazardous waste at these facilities after the effective date of these regulations, except as specifically provided otherwise in Rule R315-265 or Rule R315-261.

  Comment: As stated in section 3005(a) of RCRA, after the effective date of regulations under that section, i.e., Rules R315-270 and R315-124, the treatment, storage and disposal of hazardous waste is prohibited except in accordance with a permit. Section 3005(e) of RCRA provides for the continued operation of an existing facility that meets certain conditions, until final administrative disposition of the owner's and operator's permit application is made.

  (c) The requirements of Rule R315-265 do not apply to:

  (1) A person disposing of hazardous waste by means of ocean disposal subject to a permit issued under the Marine Protection, Research, and Sanctuaries Act;

  Comment: These Rule R315-265 regulations do apply to the treatment or storage of hazardous waste before it is loaded onto an ocean vessel for incineration or disposal at sea, as provided in Subsection R315-265-1(b).

  (2) Reserved

  (3) The owner or operator of a POTW which treats, stores, or disposes of hazardous waste;

  Comment: The owner or operator of a facility under Subsections R315-265-1(c)(1) through (3) is subject to the requirements of Rule R315-264 to the extent they are included in a permit by rule granted to such a person under 40 CFR 122, or are required by 40 CFR 144.14.

  (4) Reserved

  (5) The owner or operator of a facility permitted under Rules R315-301 through R315-320 to manage municipal or industrial solid waste, if the only hazardous waste the facility treats, stores, or disposes of is excluded from regulation under Rule R315-265 by Section R315-262-14;

  (6) The owner or operator of a facility managing recyclable materials described in Subsections R315-261-6(a)(2), (3), and (4), except to the extent they are referred to in Rule R315-279 or Sections R315-266-20 through 266-23, R315-266-70, R315-266-80, or R315-266-100 through 266-112.

  (7) A generator accumulating waste on site in compliance with applicable conditions for exemption in Sections R315-262-14 through 262-17 and Sections R315-262-200 through 262-216 and R315-262-230 through 262-233, except to the extent the requirements of Rule R315-265 are included in those sections;

  (8) A farmer disposing of waste pesticides from his own use in compliance with Section R315-262-70; or

  (9) The owner or operator of a totally enclosed treatment facility, as defined in Section R315-260-10.

  (10) The owner or operator of an elementary neutralization unit or a wastewater treatment unit as defined in Section R315-260-10, provided that if the owner or operator is diluting hazardous ignitable (D001) wastes (other than the D001 High TOC Subcategory defined in Section R315-268-40, Table Treatment Standards for Hazardous Wastes), or reactive (D003) waste, to remove the characteristic before land disposal, the owner/operator shall comply with the requirements set out in Subsection R315-265-17(b).

  (11)(i) Except as provided in Subsection R315-265-1(c)(11)(ii), a person engaged in treatment or containment activities during immediate response to any of the following situations:

  (A) A discharge of a hazardous waste;

  (B) An imminent and substantial threat of a discharge of a hazardous waste;

  (C) A discharge of a material which, when discharged, becomes a hazardous waste.

  (ii) An owner or operator of a facility otherwise regulated by this Rule R315-265 shall comply with all applicable requirements of Sections R315-265-30 through 265-37 and Sections R315-265-50 through 265-56.

  (iii) Any person who is covered by Subsection R315-265-1(c)(11)(i) and who continues or initiates hazardous waste treatment or containment activities after the immediate response is over is subject to all applicable requirements of this Rule R315-265 and Rule R315-124 for those activities.

  (12) A transporter storing manifested shipments of hazardous waste in containers meeting the requirements of Section R315-262-30 at a transfer facility for a period of ten days or less.

  (13) The addition of absorbent material to waste in a container, as defined in Section R315-260-10, or the addition of waste to the absorbent material in a container provided that these actions occur at the time waste is first placed in the containers; and Subsection R315-265-17(b), Sections R315-265-171, and 265-172 are complied with.

  (14) Universal waste handlers and universal waste transporters, as defined in Section R315-260-10, handling the wastes listed below. These handlers are subject to regulation under Rule R315-273, when handling the below listed universal wastes.

  (i) Batteries as described in Section R315-273-2;

  (ii) Pesticides as described in Section R315-273-3;

  (iii) Mercury-containing equipment as described in Section R315-273-4; and

  (iv) Lamps as described in Section R315-273-5;

  (v) Antifreeze as described in Subsection R315-273-6(a); and

  (vi) Aerosol cans as described in Subsection R315-273-6(b).

  (d) The following hazardous wastes shall not be managed at facilities subject to regulation under Rule R315-265.

  (1) EPA Hazardous Waste Nos. FO20, FO21, FO22, FO23, FO26, or FO27 unless:

  (i) The wastewater treatment sludge is generated in a surface impoundment as part of the plant's wastewater treatment system;

  (ii) The waste is stored in tanks or containers;

  (iii) The waste is stored or treated in waste piles that meet the requirements of Subsection R315-264-250(c) as well as all other applicable requirements of Sections R315-265-250 through 265-260;

  (iv) The waste is burned in incinerators that are certified pursuant to the standards and procedures in 40 CFR 265.352, which is adopted by reference; or

  (v) The waste is burned in facilities that thermally treat the waste in a device other than an incinerator and that are certified pursuant to the standards and procedures in 40 CFR 265.383, which is adopted by reference.

  (e) The requirements of Rule R315-265 apply to owners or operators of all facilities which treat, store or dispose of hazardous waste referred to in Rule R315-268, and the Rule R315-268 standards are considered material conditions or requirements of the Rule R315-265 interim status standards.


R315-265-4. General -- Imminent Hazard Action
Latest version.

  Notwithstanding any other provisions of these regulations, enforcement actions may be brought pursuant to Section 19-5-115.


R315-265-10. General Facility Standards -- Applicability
Latest version.

  The regulations in Section R315-262-10 through 262-19 apply to owners and operators of all hazardous waste facilities, except as Section R315-265-1 provides otherwise.


R315-265-11. General Facility Standards -- Identification Number
Latest version.

  Every facility owner or operator shall apply to the Director for an EPA identification number using EPA form 8700-12. Information on obtaining this number can be acquired by contacting the Utah Division of Waste Management and Radiation Control.


R315-265-12. General Facility Standards -- Required Notices
Latest version.

  (a) The owner or operator of a facility that is arranging or has arranged to receive hazardous waste subject to Sections R315-262-80 through 262-84 from a foreign source shall submit the following required notices:

  (1) As per Subsection R315-262-84(b), for imports where the competent authority of the country of export does not require the foreign exporter to submit to it a notification proposing export and obtain consent from EPA and the competent authorities for the countries of transit, such owner or operator of the facility, if acting as the importer, shall provide notification of the proposed transboundary movement in English to EPA using the allowable methods listed in Subsection R315-262-84(b)(1) at least 60 days before the first shipment is expected to depart the country of export. The notification may cover up to one year of shipments of wastes having similar physical and chemical characteristics, the same United Nations classification, the same RCRA waste codes and OECD waste codes, and being sent from the same foreign exporter.

  (2) As per Subsection R315-262-84(d)(2)(xv), a copy of the movement document bearing all required signatures within three (3) working days of receipt of the shipment to the foreign exporter; to the competent authorities of the countries of export and transit that control the shipment as an export and transit shipment of hazardous waste respectively; and on or after the electronic import-export reporting compliance date, to EPA electronically using EPA's Waste Import Export Tracking System (WIETS), or its successor system. The original of the signed movement document shall be maintained at the facility for at least three (3) years. The owner or operator of a facility may satisfy this recordkeeping requirement by retaining electronically submitted documents in the facility's account on EPA's Waste Import Export Tracking System (WIETS), or its successor system, provided that copies are readily available for viewing and production if requested by any EPA or Utah inspector. No owner or operator of a facility may be held liable for the inability to produce the documents for inspection under this section if the owner or operator of a facility can demonstrate that the inability to produce the document is due exclusively to technical difficulty with EPA's Waste Import Export Tracking System (WIETS), or its successor system, for which the owner or operator of a facility bears no responsibility.

  (3) As per Subsection R315-262-84(f)(4), if the facility has physical control of the waste and it must be sent to an alternate facility or returned to the country of export, such owner or operator of the facility shall inform EPA, using the allowable methods listed in Subsection R315-262-84(b)(1) of the need to return or arrange alternate management of the shipment.

  (4) As per Subsection R315-262-84(g), such owner or operator shall:

  (i) Send copies of the signed and dated confirmation of recovery or disposal, as soon as possible, but no later than thirty days after completing recovery or disposal on the waste in the shipment and no later than one calendar year following receipt of the waste, to the foreign exporter, to the competent authority of the country of export that controls the shipment as an export of hazardous waste, and on or after the electronic import-export reporting compliance date, to EPA electronically using EPA's Waste Import Export Tracking System (WIETS), or its successor system.

  (ii) If the facility performed any of recovery operations R12, R13, or RC16, or disposal operations D13 through D15, or DC17, promptly send copies of the confirmation of recovery or disposal that it receives from the final recovery or disposal facility within one year of shipment delivery to the final recovery or disposal facility that performed one of recovery operations R1 through R11, or RC16, or one of disposal operations D1 through D12, or DC15 to DC16, to the competent authority of the country of export that controls the shipment as an export of hazardous waste, and on or after the electronic import-export reporting compliance date, to EPA electronically using EPA's Waste Import Export Tracking System (WIETS), or its successor system. The recovery and disposal operations in Subsection R315-265-12(a)(4)(ii) are defined in Section R315-262-81.

  (b) Before transferring ownership or operation of a facility during its operating life, or of a disposal facility during the post-closure care period, the owner or operator shall notify the new owner or operator in writing of the requirements of Rule R315-265 and Rule R315-270. Also see Section R315-270-72.

  Comment: An owner's or operator's failure to notify the new owner or operator of the requirements of Rule R315-265 in no way relieves the new owner or operator of his obligation to comply with all applicable requirements.


R315-265-13. General Facility Standards -- General Waste Analysis
Latest version.

  (a)(1) Before an owner or operator treats, stores, or disposes of any hazardous wastes, or nonhazardous wastes if applicable under Subsection R315-265-113(d), he shall obtain a detailed chemical and physical analysis of a representative sample of the wastes. At a minimum, the analysis shall contain all the information which must be known to treat, store, or dispose of the waste in accordance with Rule R315-265 and Rule R315-268.

  (2) The analysis may include data developed under Rule R315-261, and existing published or documented data on the hazardous waste or on waste generated from similar processes.

  Comment: For example, the facility's records of analyses performed on the waste before the effective date of these regulations, or studies conducted on hazardous waste generated from processes similar to that which generated the waste to be managed at the facility, may be included in the data base required to comply with Subsection R315-265-13(a)(1). The owner or operator of an off-site facility may arrange for the generator of the hazardous waste to supply part of the information required by Subsection R315-265-13(a)(1), except as otherwise specified in Subsections R315-268-7(b) and (c). If the generator does not supply the information, and the owner or operator chooses to accept a hazardous waste, the owner or operator is responsible for obtaining the information required to comply with Section R315-265-13.

  (3) The analysis shall be repeated as necessary to ensure that it is accurate and up to date. At a minimum, the analysis shall be repeated:

  (i) When the owner or operator is notified, or has reason to believe, that the process or operation generating the hazardous wastes or non-hazardous wastes, if applicable, under Subsection R315-265-113(d) has changed; and

  (ii) For off-site facilities, when the results of the inspection required in Subsection R315-265-13(a)(4) indicate that the hazardous waste received at the facility does not match the waste designated on the accompanying manifest or shipping paper.

  (4) The owner or operator of an off-site facility shall inspect and, if necessary, analyze each hazardous waste movement received at the facility to determine whether it matches the identity of the waste specified on the accompanying manifest or shipping paper.

  (b) The owner or operator shall develop and follow a written waste analysis plan which describes the procedures which he will carry out to comply with Subsection R315-265-13(a). He shall keep this plan at the facility. At a minimum, the plan shall specify:

  (1) The parameters for which each hazardous waste, or non-hazardous waste if applicable under Subsection R315-265-113(d), will be analyzed and the rationale for the selection of these parameters, i.e., how analysis for these parameters will provide sufficient information on the waste's properties to comply with Subsection R315-265-13(a);

  (2) The test methods which will be used to test for these parameters;

  (3) The sampling method which will be used to obtain a representative sample of the waste to be analyzed. A representative sample may be obtained using either:

  (i) One of the sampling methods described in Section R315-261-1090; or

  (ii) An equivalent sampling method.

  Comment: See Subsection R315-260-20(c) for related discussion.

  (4) The frequency with which the initial analysis of the waste will be reviewed or repeated to ensure that the analysis is accurate and up to date;

  (5) For off-site facilities, the waste analyses that hazardous waste generators have agreed to supply; and

  (6) Where applicable, the methods that will be used to meet the additional waste analysis requirements for specific waste management methods as specified in Sections R315-265-200, R315-265-225, and R315-265-252, and 40 CFR 265.273, 265.314, 265.341, 265.375, 265.402, 265.1034(d), 265.1063(d), 265.1084, which are adopted and incorporated by reference and Section R315-268-7.

  (7) For surface impoundments exempted from land disposal restrictions under Subsection R315-268-4(a), the procedures and schedule for:

  (i) The sampling of impoundment contents;

  (ii) The analysis of test data; and,

  (iii) The annual removal of residues which are not delisted under Section R315-260-22 or which exhibit a characteristic of hazardous waste and either:

  (A) Do not meet applicable treatment standards of Sections R315-268-40 through R315-268-49; or

  (B) Where no treatment standards have been established;

  (I) Such residues are prohibited from land disposal under Section R315-268-32 or RCRA section 3004(d); or

  (II) Such residues are prohibited from land disposal under Subsection R315-268-33(f).

  (8) For owners and operators seeking an exemption to the air emission standards of 40 CFR 265 Subpart CC, in accordance with 40 CFR 265.1083, which are adopted and incorporated by reference.

  (i) If direct measurement is used for the waste determination, the procedures and schedules for waste sampling and analysis, and the results of the analysis of test data to verify the exemption.

  (ii) If knowledge of the waste is used for the waste determination, any information prepared by the facility owner or operator or by the generator of the hazardous waste, if the waste is received from off-site, that is used as the basis for knowledge of the waste.

  (c) For off-site facilities, the waste analysis plan required in Subsection R315-265-13(b) shall also specify the procedures which will be used to inspect and, if necessary, analyze each movement of hazardous waste received at the facility to ensure that it matches the identity of the waste designated on the accompanying manifest or shipping paper. At a minimum, the plan shall describe:

  (1) The procedures which will be used to determine the identity of each movement of waste managed at the facility; and

  (2) The sampling method which will be used to obtain a representative sample of the waste to be identified, if the identification method includes sampling.

  (3) The procedures that the owner or operator of an off-site landfill receiving containerized hazardous waste will use to determine whether a hazardous waste generator or treater has added a biodegradable sorbent to the waste in the container.


R315-265-14. General Facility Standards -- Security
Latest version.

  (a) The owner or operator shall prevent the unknowing entry, and minimize the possibility for the unauthorized entry, of persons or livestock onto the active portion of his facility, unless:

  (1) Physical contact with the waste, structures, or equipment with the active portion of the facility will not injure unknowing or unauthorized persons or livestock which may enter the active portion of a facility, and

  (2) Disturbance of the waste or equipment, by the unknowing or unauthorized entry of persons or livestock onto the active portion of a facility, will not cause a violation of the requirements of Rule R315-265.

  (b) Unless exempt under Subsections R315-265-14(a)(1) and (2), a facility shall ha ve:

  (1) A 24-hour surveillance system, for example, television monitoring or surveillance by guards or facility personnel, which continuously monitors and controls entry onto the active portion of the facility; or

  (2)(i) An artificial or natural barrier, for example, a fence in good repair or a fence combined with a cliff, which completely surrounds the active portion of the facility; and

  (ii) A means to control entry, at all times, through the gates or other entrances to the active portion of the facility, for example, an attendant, television monitors, locked entrance, or controlled roadway access to the facility.

  Comment: The requirements of Subsection R315-265-14(b) are satisfied if the facility or plant within which the active portion is located itself has a surveillance system, or a barrier and a means to control entry, which complies with the requirements of Subsections R315-265-14(b)(1) or (2).

  (c) Unless exempt under Subsections R315-265-14(a)(1) and (a)(2), a sign with the legend, "Danger---Unauthorized Personnel Keep Out," shall be posted at each entrance to the active portion of a facility, and at other locations, in sufficient numbers to be seen from any approach to this active portion. The legend shall be written in English and in any other language predominant in the area surrounding the facility, for example, facilities in counties bordering the Canadian province of Quebec shall post signs in French; facilities in counties bordering Mexico shall post signs in Spanish, and shall be legible from a distance of at least 25 feet. Existing signs with a legend other than "Danger---Unauthorized Personnel Keep Out" may be used if the legend on the sign indicates that only authorized personnel are allowed to enter the active portion, and that entry onto the active portion can be dangerous.

  Comment: See Subsection R315-265-117(b) for discussion of security requirements at disposal facilities during the post-closure care period.


R315-265-15. General Facility Standards -- General Inspection Requirements
Latest version.

  (a) The owner or operator shall inspect his facility for malfunctions and deterioration, operator errors, and discharges which may be causing, or may lead to: (1) Release of hazardous waste constituents to the environment or (2) a threat to human health. The owner or operator shall conduct these inspections often enough to identify problems in time to correct them before they harm human health or the environment.

  (b)(1) The owner or operator shall develop and follow a written schedule for inspecting all monitoring equipment, safety and emergency equipment, security devices, and operating and structural equipment, such as dikes and sump pumps, that are important to preventing, detecting, or responding to environmental or human health hazards.

  (2) He shall keep this schedule at the facility.

  (3) The schedule shall identify the types of problems, for example, malfunctions or deterioration, which are to be looked for during the inspection, for example, inoperative sump pump, leaking fitting, eroding dike, etc.

  (4) The frequency of inspection may vary for the items on the schedule. However, the frequency should be based on the rate of deterioration of the equipment and the probability of an environmental or human health incident if the deterioration, malfunction, or operator error goes undetected between inspections. Areas subject to spills, such as loading and unloading areas, shall be inspected daily when in use. At a minimum, the inspection schedule shall include the items and frequencies called for in Sections R315-265-174, R315-265-193, R315-265-195, R315-265-226, and R315-265-260, 40 CFR 265.278, 265.304, 265.347, 265.377, 265.403, 265.1033, 265.1052, 265.1053, 265.1058, and 265.1084 through 265.1090, which are adopted and incorporated by reference, where applicable.

  (c) The owner or operator shall remedy any deterioration or malfunction of equipment or structures which the inspection reveals on a schedule which ensures that the problem does not lead to an environmental or human health hazard. Where a hazard is imminent or has already occurred, remedial action shall be taken immediately.

  (d) The owner or operator shall record inspections in an inspection log or summary. He shall keep these records for at least three years from the date of inspection. At a minimum, these records shall include the date and time of the inspection, the name of the inspector, a notation of the observations made, and the date and nature of any repairs or other remedial actions.


R315-265-16. General Facility Standards -- Personnel Training
Latest version.

  (a)(1) Facility personnel shall successfully complete a program of classroom instruction or on-the-job training that teaches them to perform their duties in a way that ensures the facility's compliance with the requirements of Rule R315-265. The owner or operator shall ensure that this program includes all the elements described in the document required under Subsection R315-265-16(d)(3).

  (2) This program shall be directed by a person trained in hazardous waste management procedures, and shall include instruction which teaches facility personnel hazardous waste management procedures, including contingency plan implementation, relevant to the positions in which they are employed.

  (3) At a minimum, the training program shall be designed to ensure that facility personnel are able to respond effectively to emergencies by familiarizing them with emergency procedures, emergency equipment, and emergency systems, including where applicable:

  (i) Procedures for using, inspecting, repairing, and replacing facility emergency and monitoring equipment;

  (ii) Key parameters for automatic waste feed cut-off systems;

  (iii) Communications or alarm systems;

  (iv) Response to fires or explosions;

  (v) Response to ground-water contamination incidents; and

  (vi) Shutdown of operations.

  (4) For facility employees that receive emergency response training pursuant to Occupational Safety and Health Administration (OSHA) regulations 29 CFR 1910.120(p)(8) and 1910.120(q), the facility is not required to provide separate emergency response training pursuant to Section R315-265-16, provided that the overall facility training meets all the requirements of Section R315-265-16.

  (b) Facility personnel shall successfully complete the program required in Subsection R315-265-16(a) within six months after the effective date of these regulations or six months after the date of their employment or assignment to a facility, or to a new position at a facility, whichever is later. Employees hired after the effective date of these regulations shall not work in unsupervised positions until they have completed the training requirements of Subsection R315-265-16(a).

  (c) Facility personnel shall take part in an annual review of the initial training required in Subsection R315-265-16(a).

  (d) The owner or operator shall maintain the following documents and records at the facility:

  (1) The job title for each position at the facility related to hazardous waste management, and the name of the employee filling each job;

  (2) A written job description for each position listed under Subsection R315-265-16(d)(1). This description may be consistent in its degree of specificity with descriptions for other similar positions in the same company location or bargaining unit, but shall include the requisite skill, education, or other qualifications, and duties of facility personnel assigned to each position;

  (3) A written description of the type and amount of both introductory and continuing training that will be given to each person filling a position listed under Subsection R315-265-16(d)(1);

  (4) Records that document that the training or job experience required under Subsections R315-265-16(a), (b), and (c) has been given to, and completed by, facility personnel.

  (e) Training records on current personnel shall be kept until closure of the facility. Training records on former employees shall be kept for at least three years from the date the employee last worked at the facility. Personnel training records may accompany personnel transferred within the same company.


R315-265-17. General Facility Standards -- General Requirements for Ignitable, Reactive, or Incompatible Wastes
Latest version.

  (a) The owner or operator shall take precautions to prevent accidental ignition or reaction of ignitable or reactive waste. This waste shall be separated and protected from sources of ignition or reaction including but not limited to: Open flames, smoking, cutting and welding, hot surfaces, frictional heat, sparks; static, electrical, or mechanical, spontaneous ignition, for example, from heat-producing chemical reactions, and radiant heat. While ignitable or reactive waste is being handled, the owner or operator shall confine smoking and open flame to specially designated locations. "No Smoking" signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive waste.

  (b) Where specifically required by other sections of Rule R315-265, the treatment, storage, or disposal of ignitable or reactive waste, and the mixture or commingling of incompatible wastes, or incompatible wastes and materials, shall be conducted so that it does not:

  (1) Generate extreme heat or pressure, fire or explosion, or violent reaction;

  (2) Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health;

  (3) Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosions;

  (4) Damage the structural integrity of the device or facility containing the waste; or

  (5) Through other like means threaten human health or the environment.


R315-265-18. General Facility Standards -- Location Standards
Latest version.

  The placement of any hazardous waste in a salt dome, salt bed formation, underground mine or cave is prohibited, except for the Department of Energy Waste Isolation Pilot Project in New Mexico.


R315-265-19. General Facility Standards -- Construction Quality Assurance Program
Latest version.

  (a) CQA program.

  (1) A construction quality assurance (CQA) program is required for all surface impoundment, waste pile, and landfill units that are required to comply with Subsection R315-265-221(a), Section R315-265-254, and 40 CFR 265.301(a), which is adopted and incorporated by reference. The program shall ensure that the constructed unit meets or exceeds all design criteria and specifications in the permit. The program shall be developed and implemented under the direction of a CQA officer who is a registered professional engineer.

  (2) The CQA program shall address the following physical components, where applicable:

  (i) Foundations;

  (ii) Dikes;

  (iii) Low-permeability soil liners;

  (iv) Geomembranes (flexible membrane liners);

  (v) Leachate collection and removal systems and leak detection systems; and

  (vi) Final cover systems.

  (b) Written CQA plan. Before construction begins on a unit subject to the CQA program under Subsection R315-265-19(a), the owner or operator shall develop a written CQA plan. The plan shall identify steps that will be used to monitor and document the quality of materials and the condition and manner of their installation. The CQA plan shall include:

  (1) Identification of applicable units, and a description of how they will be constructed.

  (2) Identification of key personnel in the development and implementation of the CQA plan, and CQA officer qualifications.

  (3) A description of inspection and sampling activities for all unit components identified in Subsection R315-265-19(a)(2), including observations and tests that will be used before, during, and after construction to ensure that the construction materials and the installed unit components meet the design specifications. The description shall cover: Sampling size and locations; frequency of testing; data evaluation procedures; acceptance and rejection criteria for construction materials; plans for implementing corrective measures; and data or other information to be recorded and retained in the operating record under Section R315-265-73.

  (c) Contents of program.

  (1) The CQA program shall include observations, inspections, tests, and measurements sufficient to ensure:

  (i) Structural stability and integrity of all components of the unit identified in Subsection R315-265-19(a)(2);

  (ii) Proper construction of all components of the liners, leachate collection and removal system, leak detection system, and final cover system, according to permit specifications and good engineering practices, and proper installation of all components, for example, pipes, according to design specifications;

  (iii) Conformity of all materials used with design and other material specifications under Sections R315-264-221, R315-264-251, and R315-264-301.

  (2) The CQA program shall include test fills for compacted soil liners, using the same compaction methods as in the full-scale unit, to ensure that the liners are constructed to meet the hydraulic conductivity requirements of Subsections R315-264-221(c)(1), R315-264-251(c)(1), and R315-264-301(c)(1) in the field. Compliance with the hydraulic conductivity requirements shall be verified by using in-situ testing on the constructed test fill. The test fill requirement is waived where data are sufficient to show that a constructed soil liner meets the hydraulic conductivity requirements of Subsections R315-264-221(c)(1), R315-264-251(c)(1), and R315-264-301(c)(1) in the field.

  (d) Certification. The owner or operator of units subject to Section R315-265-19 shall submit to the Director by certified mail or hand delivery, at least 30 days prior to receiving waste, a certification signed by the CQA officer that the CQA plan has been successfully carried out and that the unit meets the requirements of Subsections R315-265-221(a), Section R315-265-254, or 40 CFR 265.301(a), which is adopted and incorporated by reference. The owner or operator may receive waste in the unit after 30 days from the Director's receipt of the CQA certification unless the Director determines in writing that the construction is not acceptable, or extends the review period for a maximum of 30 more days, or seeks additional information from the owner or operator during this period. Documentation supporting the CQA officer's certification shall be furnished to the Director upon request.


R315-265-30. Preparedness and Prevention -- Applicability
Latest version.

  The regulations in Section R315-265-30 through 37 apply to owners and operators of all hazardous waste facilities, except as Section R315-265-1 provides otherwise.


R315-265-31. Preparedness and Prevention -- Maintenance and Operation of Facility
Latest version.

  Facilities shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which could threaten human health or the environment.


R315-265-32. Preparedness and Prevention -- Required Equipment
Latest version.

  All facilities shall be equipped with the following, unless none of the hazards posed by waste handled at the facility could require a particular kind of equipment specified below:

  (a) An internal communications or alarm system capable of providing immediate emergency instruction, voice or signal, to facility personnel;

  (b) A device, such as a telephone, immediately available at the scene of operations, or a hand-held two-way radio, capable of summoning emergency assistance from local police departments, fire departments, or State or local emergency response teams;

  (c) Portable fire extinguishers, fire control equipment, including special extinguishing equipment, such as that using foam, inert gas, or dry chemicals, spill control equipment, and decontamination equipment; and

  (d) Water at adequate volume and pressure to supply water hose streams, or foam producing equipment, or automatic sprinklers, or water spray systems.


R315-265-33. Preparedness and Prevention -- Testing and Maintenance of Equipment
Latest version.

  All facility communications or alarm systems, fire protection equipment, spill control equipment, and decontamination equipment, where required, shall be tested and maintained as necessary to assure its proper operation in time of emergency.


R315-265-34. Preparedness and Prevention -- Access to Communications or Alarm System
Latest version.

  (a) Whenever hazardous waste is being poured, mixed, spread, or otherwise handled, all personnel involved in the operation shall have immediate access to an internal alarm or emergency communication device, either directly or through visual or voice contact with another employee, unless such a device is not required under Section R315-265-32.

  (b) If there is ever just one employee on the premises while the facility is operating, he shall have immediate access to a device, such as a telephone, immediately available at the scene of operation, or a hand-held two-way radio, capable of summoning external emergency assistance, unless such a device is not required under Section R315-265-32.


R315-265-35. Preparedness and Prevention -- Required Aisle Space
Latest version.

  The owner or operator shall maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control equipment, and decontamination equipment to any area of facility operation in an emergency, unless aisle space is not needed for any of these purposes.

R315-265-37. Preparedness and Prevention -- Arrangements with Local Authorities
Latest version.

  (a) The owner or operator shall attempt to make the following arrangements, as appropriate for the type of waste handled at his facility and the potential need for the services of these organizations:

  (1) Arrangements to familiarize police, fire departments, and emergency response teams with the layout of the facility, properties of hazardous waste handled at the facility and associated hazards, places where facility personnel would normally be working, entrances to roads inside the facility, and possible evacuation routes;

  (2) Where more than one police and fire department might respond to an emergency, agreements designating primary emergency authority to a specific police and a specific fire department, and agreements with any others to provide support to the primary emergency authority;

  (3) Agreements with State emergency response teams, emergency response contractors, and equipment suppliers; and

  (4) Arrangements to familiarize local hospitals with the properties of hazardous waste handled at the facility and the types of injuries or illnesses which could result from fires, explosions, or releases at the facility.

  (b) Where State or local authorities decline to enter into such arrangements, the owner or operator shall document the refusal in the operating record.


R315-265-50. Contingency Plan and Emergency Procedures -- Applicability
Latest version.

  The regulations in Sections R315-265-50 through 56 apply to owners and operators of all hazardous waste facilities, except as Section R315-265-1 provides otherwise.


R315-265-51. Contingency Plan and Emergency Procedures -- Purpose and Implementation of Contingency Plan
Latest version.

  (a) Each owner or operator shall have a contingency plan for his facility. The contingency plan shall be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water.

  (b) The provisions of the plan shall be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which could threaten human health or the environment.


R315-265-52. Contingency Plan and Emergency Procedures -- Content of Contingency Plan
Latest version.

  (a) The contingency plan shall describe the actions facility personnel shall take to comply with Sections R315-265-51 and R315-265-56 in response to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility.

  (b) If the owner or operator has already prepared a Spill Prevention, Control, and Countermeasures (SPCC) Plan in accordance with 40 CFR 112, or some other emergency or contingency plan, he need only amend that plan to incorporate hazardous waste management provisions that are sufficient to comply with the requirements of Rule R315-265. The owner or operator may develop one contingency plan which meets all regulatory requirements. EPA recommends that the plan be based on the National Response Team's Integrated Contingency Plan Guidance ("One Plan"). When modifications are made to non-RCRA provisions in an integrated contingency plan, the changes do not trigger the need for a RCRA permit modification.

  (c) The plan shall describe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and State and local emergency response teams to coordinate emergency services, pursuant to Section R315-265-37.

  (d) The plan shall list names, addresses, and phone numbers, office and home, of all persons qualified to act as emergency coordinator, see Section R315-265-55, and this list shall be kept up to date. Where more than one person is listed, one shall be named as primary emergency coordinator and others shall be listed in the order in which they will assume responsibility as alternates.

  (e) The plan shall include a list of all emergency equipment at the facility, such as fire extinguishing systems, spill control equipment, communications and alarm systems, internal and external, and decontamination equipment, where this equipment is required. This list shall be kept up to date. In addition, the plan shall include the location and a physical description of each item on the list, and a brief outline of its capabilities.

  (f) The plan shall include an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan shall describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes, in cases where the primary routes could be blocked by releases of hazardous waste or fires.


R315-265-53. Contingency Plan and Emergency Procedures -- Copies of Contingency Plan
Latest version.

  A copy of the contingency plan and all revisions to the plan shall be:

  (a) Maintained at the facility; and

  (b) Submitted to all local police departments, fire departments, hospitals, and State and local emergency response teams that may be called upon to provide emergency services.


R315-265-54. Contingency Plan and Emergency Procedures --Amendment of Contingency Plan
Latest version.

  The contingency plan shall be reviewed, and immediately amended, if necessary, whenever:

  (a) Applicable regulations are revised;

  (b) The plan fails in an emergency;

  (c) The facility changes-in its design, construction, operation, maintenance, or other circumstances-in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;

  (d) The list of emergency coordinators changes; or

  (e) The list of emergency equipment changes.


R315-265-55. Contingency Plan and Emergency Procedures --Emergency Coordinator
Latest version.

  At all times, there shall be at least one employee either on the facility premises or on call, i.e., available to respond to an emergency by reaching the facility within a short period of time, with the responsibility for coordinating all emergency response measures. This emergency coordinator shall be thoroughly familiar with all aspects of the facility's contingency plan, all operations and activities at the facility, the location and characteristics of waste handled, the location of all records within the facility, and the facility layout. In addition, this person shall have the authority to commit the resources needed to carry out the contingency plan. Comment: The emergency coordinator's responsibilities are more fully spelled out in Section R315-265-56. Applicable responsibilities for the emergency coordinator vary, depending on factors such as type and variety of waste(s) handled by the facility, and type and complexity of the facility.


R315-265-56. Contingency Plan and Emergency Procedures --Emergency Procedures
Latest version.

  (a) Whenever there is an imminent or actual emergency situation, the emergency coordinator, or his designee when the emergency coordinator is on call, shall immediately:

  (1) Activate internal facility alarms or communication systems, where applicable, to notify all facility personnel; and

  (2) Notify appropriate State or local agencies with designated response roles if their help is needed.

  (b) Whenever there is a release, fire, or explosion, the emergency coordinator shall immediately identify the character, exact source, amount, and areal extent of any released materials. He may do this by observation or review of facility records or manifests and, if necessary, by chemical analysis.

  (c) Concurrently, the emergency coordinator shall assess possible hazards to human health or the environment that may result from the release, fire, or explosion. This assessment shall consider both direct and indirect effects of the release, fire, or explosion, for example, the effects of any toxic, irritating, or asphyxiating gases that are generated, or the effects of any hazardous surface water run-offs from water or chemical agents used to control fire and heat-induced explosions.

  (d) If the emergency coordinator determines that the facility has had a release, fire, or explosion which could threaten human health, or the environment, outside the facility, he shall report his findings as follows:

  (1) If his assessment indicates that evacuation of local areas may be advisable, he shall immediately notify appropriate local authorities. He shall be available to help appropriate officials decide whether local areas should be evacuated; and

  (2) He shall immediately notify the Utah Department of Environmental Quality as specified in Section R315-263-30 and either the government official designated as the on-scene coordinator for that geographical area, or the National Response Center, using their 24-hour toll free number 800/424-8802. The report shall include:

  (i) Name and telephone number of reporter;

  (ii) Name and address of facility;

  (iii) Time and type of incident, for example, release, fire;

  (iv) Name and quantity of material(s) involved, to the extent known;

  (v) The extent of injuries, if any; and

  (vi) The possible hazards to human health, or the environment, outside the facility.

  (e) During an emergency, the emergency coordinator shall take all reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other hazardous waste at the facility. These measures shall include, where applicable, stopping processes and operations, collecting and containing released waste, and removing or isolating containers.

  (f) If the facility stops operations in response to a fire, explosion or release, the emergency coordinator shall monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate.

  (g) Immediately after an emergency, the emergency coordinator shall provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material that results from a release, fire, or explosion at the facility.

  Comment: Unless the owner or operator can demonstrate, in accordance with Subsections R315-261-3(c) or (d), that the recovered material is not a hazardous waste, the owner or operator becomes a generator of hazardous waste and shall manage it in accordance with all applicable requirements of Rules R315-262, R315-263, and R315-265.

  (h) The emergency coordinator shall ensure that, in the affected area(s) of the facility:

  (1) No waste that may be incompatible with the released material is treated, stored, or disposed of until cleanup procedures are completed; and

  (2) All emergency equipment listed in the contingency plan is cleaned and fit for its intended use before operations are resumed.

  (i) The owner or operator shall note in the operating record the time, date, and details of any incident that requires implementing the contingency plan. Within 15 days after the incident, he shall submit a written report on the incident to the Director. The report shall include:

  (1) Name, address, and telephone number of the owner or operator;

  (2) Name, address, and telephone number of the facility;

  (3) Date, time, and type of incident, for example, fire, explosion;

  (4) Name and quantity of material(s) involved;

  (5) The extent of injuries, if any;

  (6) An assessment of actual or potential hazards to human health or the environment, where this is applicable; and

  (7) Estimated quantity and disposition of recovered material that resulted from the incident.


R315-265-70. Manifest System, Recordkeeping, and Reporting --Applicability
Latest version.

  (a) The regulations in R315-265-70 through R315-265-77 apply to owners and operators of both on-site and off-site facilities, except as Section R315-265-1 provides otherwise. Sections R315-265-71, R315-265-72, and R315-265-76 do not apply to owners and operators of on-site facilities that do not receive any hazardous waste from off-site sources.


R315-265-71. Manifest System, Recordkeeping, and Reporting --Use of Manifest System
Latest version.

  (a)(1) If a facility receives hazardous waste accompanied by a manifest, the owner, operator or his/her agent shall sign and date the manifest as indicated in Subsection R315-265-71(a)(2) to certify that the hazardous waste covered by the manifest was received, that the hazardous waste was received except as noted in the discrepancy space of the manifest, or that the hazardous waste was rejected as noted in the manifest discrepancy space.

  (2) If the facility receives a hazardous waste shipment accompanied by a manifest, the owner, operator, or his agent shall:

  (i) Sign and date, by hand, each copy of the manifest;

  (ii) Note any discrepancies, as defined in Subsection R315-265-72(a), on each copy of the manifest;

  (iii) Immediately give the transporter at least one copy of the manifest;

  (iv) Within 30 days of delivery, send a copy, Page 2, of the manifest to the generator;

  (v) Paper manifest submission requirements are:

  (A) Options for compliance on June 30, 2018. Beginning on June 30, 2018, send the top copy, Page 1, of any paper manifest and any paper continuation sheet to the e-Manifest system for purposes of data entry and processing, or in lieu of submitting the paper copy to EPA, the owner or operator may transmit to the EPA system an image file of Page 1 of the manifest and any continuation sheet, or both a data file and image file corresponding to Page 1 of the manifest and any continuation sheet, within 30 days of the date of delivery. Submissions of copies to the e-Manifest system shall be made at the mailing address or electronic mail/submission address specified at the e-Manifest program website's directory of services. Beginning on June 30, 2021, EPA will not accept mailed paper manifests from facilities for processing in e-Manifest.

  (B) Options for compliance on June 30, 2021. Beginning on June 30, 2021, the requirement to submit the top copy, Page1, of the paper manifest and any paper continuation sheet to the e-Manifest system for purposes of data entry and processing may be met by the owner or operator only by transmitting to the EPA system an image file of Page 1 of the manifest and any continuation sheet, or by transmitting to the EPA system both a data file and the image file corresponding to Page 1 of the manifest and any continuation sheet, within 30 days of the date of delivery. Submissions of copies to the e-Manifest system shall be made to the electronic mail/submission address specified at the e-Manifest program website's directory of services; and

  (vi) Retain at the facility a copy of each manifest for at least three years from the date of delivery.

  (3) The owner or operator of a facility that receives hazardous waste subject to Sections R315-262-80 through 265-84 from a foreign source shall:

  (i) Additionally list the relevant consent number from consent documentation supplied by EPA to the facility for each waste listed on the manifest, matched to the relevant list number for the waste from block 9b. If additional space is needed, the owner or operator should use a Continuation Sheet(s), EPA Form 8700-22A; and

  (ii) Send a copy of the manifest to EPA using the addresses listed in Subsection R315-262-82(e) within 30 days of delivery until the facility can submit such a copy to the e-Manifest system per Subsection R315-265-71(a)(2)(v).

  (b) If a facility receives, from a rail or water (bulk shipment) transporter, hazardous waste which is accompanied by a shipping paper containing all the information required on the manifest, excluding the EPA identification numbers, generator's certification, and signatures, the owner or operator, or his agent, shall:

  (1) Sign and date each copy of the manifest or shipping paper, if the manifest has not been received, to certify that the hazardous waste covered by the manifest or shipping paper was received;

  (2) Note any significant discrepancies, as defined in Subsection R315-265-72(a), in the manifest or shipping paper, if the manifest has not been received, on each copy of the manifest or shipping paper;

  Comment: The Director does not intend that the owner or operator of a facility whose procedures under Subsection R315-265-13(c) include waste analysis shall perform that analysis before signing the shipping paper and giving it to the transporter. Subsection R315-265-72(b), however, requires reporting an unreconciled discrepancy discovered during later analysis.

  (3) Immediately give the rail or water (bulk shipment) transporter at least one copy of the manifest or shipping paper, if the manifest has not been received;

  (4) Within 30 days after the delivery, send a copy of the signed and dated manifest or a signed and dated copy of the shipping paper, if the manifest has not been received within 30 days after delivery, to the generator; and

  Comment: Subsection R315-262-23(c) requires the generator to send three copies of the manifest to the facility when hazardous waste is sent by rail or water (bulk shipment).

  (5) Retain at the facility a copy of the manifest and shipping paper, if signed in lieu of the manifest at the time of delivery, for at least three years from the date of delivery.

  (c) Whenever a shipment of hazardous waste is initiated from a facility, the owner or operator of that facility shall comply with the requirements of Rule R315-262. The provisions of Sections R315-262-15, R315-262-16, and R315-262-17 are applicable to the on-site accumulation of hazardous wastes by generators. Therefore, the provisions of Sections R315-262-15, R315-262-16, and R315-262-17 only apply to owners or operators who are shipping hazardous waste which they generated at that facility or operating as a large quantity generator consolidating hazardous waste from very small quantity generators under Subsection R315-262-17(f).

  Comment: The provisions of Section R315-262-34 are applicable to the on-site accumulation of hazardous wastes by generators. Therefore, the provisions of Section R315-262-34 only apply to owners or operators who are shipping hazardous waste which they generated at that facility.

  (d) As per Subsection R315-262-84(d)(2)(xv), within three working days of the receipt of a shipment subject to Sections R315-262-80 through 262-84, the owner or operator of a facility shall provide a copy of the movement document bearing all required signatures to the foreign exporter; to the competent authorities of the countries of export and transit that control the shipment as an export and transit shipment of hazardous waste respectively; and on or after the electronic import-export reporting compliance date, to EPA electronically using EPA's Waste Import Export Tracking System (WIETS), or its successor system. The original copy of the movement document shall be maintained at the facility for at least three years from the date of signature. The owner or operator of a facility may satisfy this recordkeeping requirement by retaining electronically submitted documents in the facility's account on EPA's Waste Import Export Tracking System (WIETS), or its successor system, provided that copies are readily available for viewing and production if requested by any EPA or Utah inspector. No owner or operator of a facility may be held liable for the inability to produce the documents for inspection under this section if the owner or operator of a facility can demonstrate that the inability to produce the document is due exclusively to technical difficulty with EPA's Waste Import Export Tracking System (WIETS), or its successor system, for which the owner or operator of a facility bears no responsibility.

  (e) A facility shall determine whether the consignment state for a shipment regulates any additional wastes, beyond those regulated Federally, as hazardous wastes under its state hazardous waste program. Facilities shall also determine whether the consignment state or generator state requires the facility to submit any copies of the manifest to these states.

  (f) Legal equivalence to paper manifests. Electronic manifests that are obtained, completed, and transmitted in accordance with Subsection R315-262-20(a)(3), and used in accordance with this Section R315-265-71 in lieu of the paper manifest form are the legal equivalent of paper manifest forms bearing handwritten signatures, and satisfy for all purposes any requirement in these regulations to obtain, complete, sign, provide, use, or retain a manifest.

  (1) Any requirement in these regulations for the owner or operator of a facility to sign a manifest or manifest certification by hand, or to obtain a handwritten signature, is satisfied by signing with or obtaining a valid and enforceable electronic signature within the meaning of Section R315-262-25.

  (2) Any requirement in these regulations to give, provide, send, forward, or to return to another person a copy of the manifest is satisfied when a copy of an electronic manifest is transmitted to the other person.

  (3) Any requirement in these regulations for a manifest to accompany a hazardous waste shipment is satisfied when a copy of an electronic manifest is accessible during transportation and forwarded to the person or persons who are scheduled to receive delivery of the hazardous waste shipment.

  (4) Any requirement in these regulations for an owner or operator to keep or retain a copy of each manifest is satisfied by the retention of the facility's electronic manifest copies in its account on the e-Manifest system, provided that such copies are readily available for viewing and production if requested by any EPA or Utah inspector.

  (5) No owner or operator may be held liable for the inability to produce an electronic manifest for inspection under this Section R315-265-71 if the owner or operator can demonstrate that the inability to produce the electronic manifest is due exclusively to a technical difficulty with the EPA system for which the owner or operator bears no responsibility.

  (g) An owner or operator may participate in the electronic manifest system either by accessing the electronic manifest system from the owner's or operator's electronic equipment, or by accessing the electronic manifest system from portable equipment brought to the owner's or operator's site by the transporter who delivers the waste shipment to the facility

  (h) Special procedures applicable to replacement manifests. If a facility receives hazardous waste that is accompanied by a paper replacement manifest for a manifest that was originated electronically, the following procedures apply to the delivery of the hazardous waste by the final transporter:

  (1) Upon delivery of the hazardous waste to the designated facility, the owner or operator shall sign and date each copy of the paper replacement manifest by hand in Item 20, Designated Facility Certification of Receipt, and note any discrepancies in Item 18, Discrepancy Indication Space, of the replacement manifest,

  (2) The owner or operator of the facility shall give back to the final transporter one copy of the paper replacement manifest,

  (3) Within 30 days of delivery of the hazardous waste to the designated facility, the owner or operator of the facility shall send one signed and dated copy of the paper replacement manifest to the generator, and send an additional signed and dated copy of the paper replacement manifest to the EPA e-Manifest system, and

  (4) The owner or operator of the facility shall retain at the facility one copy of the paper replacement manifest for at least three years from the date of delivery.

  (i) Special procedures applicable to electronic signature methods undergoing tests. If an owner or operator using an electronic manifest signs this manifest electronically using an electronic signature method which is undergoing pilot or demonstration tests aimed at demonstrating the practicality or legal dependability of the signature method, then the owner or operator shall also sign with an ink signature the facility's certification of receipt or discrepancies on the printed copy of the manifest provided by the transporter. Upon executing its ink signature on this printed copy, the owner or operator shall retain this original copy among its records for at least three years from the date of delivery of the waste.

  (j) Imposition of user fee for electronic manifest use.

  (1) As prescribed in 40 CFR 265.1311, and determined in 40 CFR 265.1312, which are adopted and incorporated by reference, an owner or operator who is a user of the electronic manifest system shall be assessed a user fee by EPA for the submission and processing of each electronic and paper manifest. EPA shall update the schedule of user fees and publish them to the user community, as provided in 40 CFR 265.1313, which is adopted and incorporated by reference.

  (2) An owner or operator subject to user fees under Section R315-265-71 shall make user fee payments in accordance with the requirements of 40 CFR 265.1314, subject to the informal fee dispute resolution process of 40 CFR 265.1316, and subject to the sanctions for delinquent payments under 40 CFR 265.1315, which are adopted and incorporated by reference.

  (k) Electronic manifest signatures.

  (1) Electronic manifest signatures shall meet the criteria described in Section R315-262-25.

  (l) Post-receipt manifest data corrections. After facilities have certified to the receipt of hazardous wastes by signing Item 20 of the manifest, any post-receipt data corrections may be submitted at any time by any interested person, for example, waste handler, shown on the manifest.

  (1) Interested persons shall make all corrections to manifest data by electronic submission, either by directly entering corrected data to the web based service provided in e-Manifest for such corrections, or by an upload of a data file containing data corrections relating to one or more previously submitted manifests.

  (2) Each correction submission shall include the following information:

  (i) The Manifest Tracking Number and date of receipt by the facility of the original manifest(s) for which data are being corrected;

  (ii) The Item Number(s) of the original manifest that is the subject of the submitted correction(s); and

  (iii) For each Item Number with corrected data, the data previously entered and the corresponding data as corrected by the correction submission.

  (3) Each correction submission shall include a statement that the person submitting the corrections certifies that to the best of his or her knowledge or belief, the corrections that are included in the submission will cause the information reported about the previously received hazardous wastes to be true, accurate, and complete.

  (i) The certification statement shall be executed with a valid electronic signature; and

  (ii) A batch upload of data corrections may be submitted under one certification statement.

  (4) Upon receipt by the system of any correction submission, other interested persons shown on the manifest will be provided electronic notice of the submitter's corrections.

  (5) Other interested persons shown on the manifest may respond to the submitter's corrections with comments to the submitter, or by submitting another correction to the system, certified by the respondent as specified in Subsection R315-265-71(l)(3), and with notice of the corrections to other interested persons shown on the manifest.


R315-265-72. Manifest System, Recordkeeping, and Reporting -- Manifest Discrepancies
Latest version.

  (a) Manifest discrepancies are:

  (1) Significant differences, as defined by Subsection R315-265-72(b), between the quantity or type of hazardous waste designated on the manifest or shipping paper, and the quantity and type of hazardous waste a facility actually receives;

  (2) Rejected wastes, which may be a full or partial shipment of hazardous waste that the TSDF cannot accept; or

  (3) Container residues, which are residues that exceed the quantity limits for "empty" containers set forth in Subsection R315-261-7(b).

  (b) Significant differences in quantity are: For bulk waste, variations greater than 10 percent in weight; for batch waste, any variation in piece count, such as a discrepancy of one drum in a truckload. Significant differences in type are obvious differences which can be discovered by inspection or waste analysis, such as waste solvent substituted for waste acid, or toxic constituents not reported on the manifest or shipping paper.

  (c) Upon discovering a significant difference in quantity or type, the owner or operator shall attempt to reconcile the discrepancy with the waste generator or transporter, for example, with telephone conversations. If the discrepancy is not resolved within 15 days after receiving the waste, the owner or operator shall immediately submit to the Director a letter describing the discrepancy and attempts to reconcile it, and a copy of the manifest or shipping paper at issue.

  (d)(1) Upon rejecting waste or identifying a container residue that exceeds the quantity limits for "empty" containers set forth in Subsection R315-261-7(b), the facility shall consult with the generator prior to forwarding the waste to another facility that can manage the waste. If it is impossible to locate an alternative facility that can receive the waste, the facility may return the rejected waste or residue to the generator. The facility shall send the waste to the alternative facility or to the generator within 60 days of the rejection or the container residue identification.

  (2) While the facility is making arrangements for forwarding rejected wastes or residues to another facility under this Section R315-265-72, it shall ensure that either the delivering transporter retains custody of the waste, or the facility shall provide for secure, temporary custody of the waste, pending delivery of the waste to the first transporter designated on the manifest prepared under Subsections R315-265-72(e) or (f).

  (e) Except as provided in Subsection R315-265-72(e)(7), for full or partial load rejections and residues that are to be sent off-site to an alternate facility, the facility is required to prepare a new manifest in accordance with Subsection R315-262-20(a) and the following instructions:

  (1) Write the generator's U.S. EPA ID number in Item 1 of the new manifest. Write the generator's name and mailing address in Item 5 of the new manifest. If the mailing address is different from the generator's site address, then write the generator's site address in the designated space in Item 5.

  (2) Write the name of the alternate designated facility and the facility's U.S. EPA ID number in the designated facility block, Item 8, of the new manifest.

  (3) Copy the manifest tracking number found in Item 4 of the old manifest to the Special Handling and Additional Information Block of the new manifest, and indicate that the shipment is a residue or rejected waste from the previous shipment.

  (4) Copy the manifest tracking number found in Item 4 of the new manifest to the manifest reference number line in the Discrepancy Block of the old manifest, Item 18a.

  (5) Write the DOT description for the rejected load or the residue in Item 9, U.S. DOT Description, of the new manifest and write the container types, quantity, and volume(s) of waste.

  (6) Sign the Generator's/Offeror's Certification to certify, as offeror of the shipment, that the waste has been properly packaged, marked and labeled and is in proper condition for transportation.

  (7) For full load rejections that are made while the transporter remains at the facility, the facility may return the shipment to the generator with the original manifest by completing Item 18a and 18b of the manifest and supplying the generator's information in the Alternate Facility space. The facility shall retain a copy for its records and then give the remaining copies of the manifest to the transporter to accompany the shipment. If the original manifest is not used, then the facility shall use a new manifest and comply with Subsections R315-265-72(f)(1), (2), (3), (4), (5), (6), and (8).

  (8) For full or partial load rejections and container residues contained in non-empty containers that are returned to the generator, the facility shall also comply with the exception reporting requirements in Subsection R315-262-42(a).

  (g) If a facility rejects a waste or identifies a container residue that exceeds the quantity limits for "empty" containers set forth in Subsection R315-261-7(b) after it has signed, dated, and returned a copy of the manifest to the delivering transporter or to the generator, the facility shall amend its copy of the manifest to indicate the rejected wastes or residues in the discrepancy space of the amended manifest. The facility shall also copy the manifest tracking number from Item 4 of the new manifest to the discrepancy space of the amended manifest, and shall re-sign and date the manifest to certify to the information as amended. The facility shall retain the amended manifest for at least three years from the date of amendment, and shall within 30 days, send a copy of the amended manifest to the transporter and generator that received copies prior to their being amended.


R315-265-73. Manifest System, Recordkeeping, and Reporting -- Operating Record
Latest version.

  (a) The owner or operator shall keep a written operating record at his facility.

  (b) The following information shall be recorded, as it becomes available, and maintained in the operating record for three years unless noted below:

  (1) A description and the quantity of each hazardous waste received, and the method(s) and date(s) of its treatment, storage, or disposal at the facility as required by Appendix I to 40 CFR part 265, which is adopted and incorporated by reference. This information shall be maintained in the operating record until closure of the facility;

  (2) The location of each hazardous waste within the facility and the quantity at each location. For disposal facilities, the location and quantity of each hazardous waste shall be recorded on a map or diagram of each cell or disposal area. For all facilities, this information shall include cross-references to manifest document numbers if the waste was accompanied by a manifest. This information shall be maintained in the operating record until closure of the facility;

  Comment: See Section R315-265-119, 40 CFR 265.279, and 40 CFR 265.309, which are adopted and incorporated by reference, for related requirements.

  (3) Records and results of waste analysis, waste determinations, and trial tests performed as specified in Sections R315-265-13, R315-265-200, R315-265-225, R315-265-252, 40 CFR 265.273, 265.314, 265.341, 265.375, 265.402, 265.1034, 265.1063, 265.1084, which are adopted and incorporated by reference, Subsection R315-268-4(a), and Section R315-268-7.

  (4) Summary reports and details of all incidents that require implementing the contingency plan as specified in Subsection R315-265-56(j);

  (5) Records and results of inspections as required by Subsection R315-265-15(d), except these data need be kept only three years;

  (6) Monitoring, testing or analytical data, and corrective action where required by Sections R315-265-90 through 265-94 and by Sections R315-265-19, R315-265-94, R315-265-191, R315-265-193, R315-265-195, R315-265-224, R315-265-226, R315-265-255, R315-265-260, 40 CFR 265.276, 265.278, 265.280(d)(1), 265.302, 265.304, 265.347, 265.377, 265.1034(c) through 265.1034(f), 265.1035, 265.1063(d) through 265. 265.1063(i), 265.1064, and 265.1083 through 265.1090, which are adopted and incorporated by reference. Maintain in the operating record for three years, except for records and results pertaining to ground-water monitoring and cleanup, and response action plans for surface impoundments, waste piles, and landfills, which shall be maintained in the operating record until closure of the facility.

  Comment: As required by Section R315-265-94, monitoring data at disposal facilities shall be kept throughout the post-closure period.

  (7) All closure cost estimates under Section R315-265-142 and, for disposal facilities, all post-closure cost estimates under Section R315-265-144 shall be maintained in the operating record until closure of the facility.

  (8) Records of the quantities, and date of placement, for each shipment of hazardous waste placed in land disposal units under an extension to the effective date of any land disposal restriction granted pursuant to Section R315-268-5, monitoring data required pursuant to a petition under Section R315-268-6, or a certification under Section R315-268-8, and the applicable notice required by a generator under Subsection R315-268-7(a). All of this information shall be maintained in the operating record until closure of the facility.

  (9) For an off-site treatment facility, a copy of the notice, and the certification and demonstration if applicable, required by the generator or the owner or operator under Sections R315-268-7 or R315-268-8;

  (10) For an on-site treatment facility, the information contained in the notice, except the manifest number, and the certification and demonstration if applicable, required by the generator or the owner or operator under Sections R315-268-7 or R315-268-8;

  (11) For an off-site land disposal facility, a copy of the notice, and the certification and demonstration if applicable, required by the generator or the owner or operator of a treatment facility under Sections R315-268-7 or R315-268-8;

  (12) For an on-site land disposal facility, the information contained in the notice, except the manifest number, and the certification and demonstration if applicable, required by the generator or the owner or operator of a treatment facility under Sections R315-268-7 or R315-268-8.

  (13) For an off-site storage facility, a copy of the notice, and the certification and demonstration if applicable, required by the generator or the owner or operator under Sections R315-268-7 or R315-268-8; and

  (14) For an on-site storage facility, the information contained in the notice, except the manifest number, and the certification and demonstration if applicable, required by the generator or the owner or operator of a treatment facility under Sections R315-268-7 or R315-268-8.

  (15) Monitoring, testing or analytical data, and corrective action where required by Section R315-265-90, Subsections R315-265-93(d)(2), and R315-265-93(d)(5), and the certification as required by Subsection R315-265-196(f) shall be maintained in the operating record until closure of the facility.


R315-265-74. Manifest System, Recordkeeping, and Reporting -- Availability, Retention, and Dispostion of Records
Latest version.

  (a) All records, including plans, required under Rule R315-265 shall be furnished upon request, and made available at all reasonable times for inspection, by any officer, employee, or representative of the Director.

  (b) The retention period for all records required under Rule R315-265 is extended automatically during the course of any unresolved enforcement action regarding the facility or as requested by the Director.

  (c) A copy of records of waste disposal locations and quantities under Subsection R315-265-73(b)(2) shall be submitted to the Director and local land authority upon closure of the facility, see Section R315-265-119.


R315-265-75. Manifest System, Recordkeeping, and Reporting -- Biennial Report
Latest version.

  The owner or operator shall complete and submit EPA Form 8700-13 A/B to the Director by March 1 of the following even numbered year and shall cover activities during the previous year.


R315-265-76. Manifest System, Recordkeeping, and Reporting -- Unmanifested Waste Report
Latest version.

  (a) If a facility accepts for treatment, storage, or disposal any hazardous waste from an off-site source without an accompanying manifest, or without an accompanying shipping paper as described by Subsection R315-263-20(e), and if the waste is not excluded from the manifest requirement by Rules R315-260 through R315-266, R315-268, R315-270 or R315-273, then the owner or operator shall prepare and submit a letter to the Director within fifteen days after receiving the waste. The unmanifested waste report shall contain the following information:

  (1) The EPA identification number, name and address of the facility;

  (2) The date the facility received the waste;

  (3) The EPA identification number, name and address of the generator and the transporter, if available;

  (4) A description and the quantity of each unmanifested hazardous waste the facility received;

  (5) The method of treatment, storage, or disposal for each hazardous waste;

  (6) The certification signed by the owner or operator of the facility or his authorized representative; and

  (7) A brief explanation of why the waste was unmanifested, if known.


R315-265-77. Manifest System, Recordkeeping, and Reporting -- Additional Reports
Latest version.

  In addition to submitting the biennial report and unmanifested waste reports described in Sections R315-265-75 and 265-76, the owner or operator shall also report to the Director:

  (a) Releases, fires, and explosions as specified in Subsection R315-265-56(j);

  (b) Ground-water contamination and monitoring data as specified in Sections R315-265-93 and R315-265-94; and

  (c) Facility closure as specified in Section R315-265-115.

  (d) As otherwise required by 40 CFR 265 Subparts AA, BB, and CC, which are adopted and incorporated by reference.


R315-265-90. Ground-Water Monitoring - Applicability
Latest version.

  (a) Within one year after the effective date of these regulations, the owner or operator of a surface impoundment, landfill, or land treatment facility which is used to manage hazardous waste shall implement a ground-water monitoring program capable of determining the facility's impact on the quality of ground water in the uppermost aquifer underlying the facility, except as Section R315-265-1 and Subsection R315-265-90(c) provide otherwise.

  (b) Except as Subsections R315-265-90(c) and (d) provide otherwise, the owner or operator shall install, operate, and maintain a ground-water monitoring system which meets the requirements of Section R315-265-91, and shall comply with Sections R315-265-92 through 265-94. This ground-water monitoring program shall be carried out during the active life of the facility, and for disposal facilities, during the post-closure care period as well.

  (c) All or part of the ground-water monitoring requirements of Sections R315-265-90 through 265-94 may be waived if the owner or operator can demonstrate that there is a low potential for migration of hazardous waste or hazardous waste constituents from the facility via the uppermost aquifer to water supply wells, domestic, industrial, or agricultural, or to surface water. This demonstration shall be in writing, and shall be kept at the facility. This demonstration shall be certified by a qualified geologist or geotechnical engineer and shall establish the following:

  (1) The potential for migration of hazardous waste or hazardous waste constituents from the facility to the uppermost aquifer, by an evaluation of:

  (i) A water balance of precipitation, evapotranspiration, runoff, and infiltration; and

  (ii) Unsaturated zone characteristics, i.e., geologic materials, physical properties, and depth to ground water; and

  (2) The potential for hazardous waste or hazardous waste constituents which enter the uppermost aquifer to migrate to a water supply well or surface water, by an evaluation of:

  (i) Saturated zone characteristics, i.e., geologic materials, physical properties, and rate of ground-water flow; and

  (ii) The proximity of the facility to water supply wells or surface water.

  (d) If an owner or operator assumes, or knows, that ground-water monitoring of indicator parameters in accordance with Sections R315-265-91 and 265-92 would show statistically significant increases, or decreases in the case of pH, when evaluated under Subsection R315-265-93(b), he may install, operate, and maintain an alternate ground-water monitoring system, other than the one described in Sections R315-265-91 and 265-92. If the owner or operator decides to use an alternate ground-water monitoring system he shall:

  (1) Within one year after the effective date of these regulations, develop a specific plan, certified by a qualified geologist or geotechnical engineer, which satisfies the requirements of Subsection R315-265-93(d)(3), for an alternate ground-water monitoring system. This plan is to be placed in the facility's operating record and maintained until closure of the facility.

  (2) Not later than one year after the effective date of these regulations, initiate the determinations specified in Subsection R315-265-93(d)(4);

  (3) Prepare a report in accordance with Subsection R315-265-93(d)(5) and place it in the facility's operating record and maintain until closure of the facility.

  (4) Continue to make the determinations specified in Subsection R315-265-93(d)(4) on a quarterly basis until final closure of the facility; and

  (5) Comply with the recordkeeping and reporting requirements in Subsection R315-265-94(b).

  (e) The ground-water monitoring requirements of this Sections R315-265-90 through 265-94 may be waived with respect to any surface impoundment that (1) Is used to neutralize wastes which are hazardous solely because they exhibit the corrosivity characteristic under Section R315-261-22 or are listed as hazardous wastes in Sections R315-261-30 through 261-35 only for this reason, and (2) contains no other hazardous wastes, if the owner or operator can demonstrate that there is no potential for migration of hazardous wastes from the impoundment. The demonstration shall establish, based upon consideration of the characteristics of the wastes and the impoundment, that the corrosive wastes will be neutralized to the extent that they no longer meet the corrosivity characteristic before they can migrate out of the impoundment. The demonstration shall be in writing and shall be certified by a qualified professional.

  (f) The Director may replace all or part of the requirements of Sections R315-265-90 through 265-94 applying to a regulated unit, as defined in Section R315-264-90, with alternative requirements developed for groundwater monitoring set out in an approved closure or post-closure plan or in an enforceable document, as defined in Subsection R315-270-1(c)(7), where the Director determines that:

  (1) A regulated unit is situated among solid waste management units, or areas of concern, a release has occurred, and both the regulated unit and one or more solid waste management unit(s), or areas of concern, are likely to have contributed to the release; and

  (2) It is not necessary to apply the requirements of Sections R315-265-90 through 265-94 because the alternative requirements will protect human health and the environment. The alternative standards for the regulated unit shall meet the requirements of Subsection R315-264-101(a).


R315-265-91. Ground-Water Monitoring -- Ground-Water Monitoring System
Latest version.

  (a) A ground-water monitoring system shall be capable of yielding ground-water samples for analysis and shall consist of:

  (1) Monitoring wells, at least one, installed hydraulically upgradient, i.e., in the direction of increasing static head, from the limit of the waste management area. Their number, locations, and depths shall be sufficient to yield ground-water samples that are:

  (i) Representative of background ground-water quality in the uppermost aquifer near the facility; and

  (ii) Not affected by the facility; and

  (2) Monitoring wells, at least three, installed hydraulically downgradient, i.e., in the direction of decreasing static head, at the limit of the waste management area. Their number, locations, and depths shall ensure that they immediately detect any statistically significant amounts of hazardous waste or hazardous waste constituents that migrate from the waste management area to the uppermost aquifer.

  (3) The facility owner or operator may demonstrate that an alternate hydraulically downgradient monitoring well location will meet the criteria outlined below. The demonstration shall be in writing and kept at the facility. The demonstration shall be certified by a qualified ground-water scientist and establish that:

  (i) An existing physical obstacle prevents monitoring well installation at the hydraulically downgradient limit of the waste management area; and

  (ii) The selected alternate downgradient location is as close to the limit of the waste management area as practical; and

  (iii) The location ensures detection that, given the alternate location, is as early as possible of any statistically significant amounts of hazardous waste or hazardous waste constituents that migrate from the waste management area to the uppermost aquifer.

  (iv) Lateral expansion, new, or replacement units are not eligible for an alternate downgradient location under Section R315-265-91.

  (b) Separate monitoring systems for each waste management component of a facility are not required provided that provisions for sampling upgradient and downgradient water quality will detect any discharge from the waste management area.

  (1) In the case of a facility consisting of only one surface impoundment, landfill, or land treatment area, the waste management area is described by the waste boundary, perimeter.

  (2) In the case of a facility consisting of more than one surface impoundment, landfill, or land treatment area, the waste management area is described by an imaginary boundary line which circumscribes the several waste management components.

  (c) All monitoring wells shall be cased in a manner that maintains the integrity of the monitoring well bore hole. This casing shall be screened or perforated, and packed with gravel or sand where necessary, to enable sample collection at depths where appropriate aquifer flow zones exist. The annular space, i.e., the space between the bore hole and well casing, above the sampling depth shall be sealed with a suitable material, for example, cement grout or bentonite slurry, to prevent contamination of samples and the ground water.


R315-265-92. Ground-Water Monitoring -- Sampling and Analysis
Latest version.

  (a) The owner or operator shall obtain and analyze samples from the installed ground-water monitoring system. The owner or operator shall develop and follow a ground-water sampling and analysis plan. He shall keep this plan at the facility. The plan shall include procedures and techniques for:

  (1) Sample collection;

  (2) Sample preservation and shipment;

  (3) Analytical procedures; and

  (4) Chain of custody control.

  Comment: See "Procedures Manual For Ground-water Monitoring At Solid Waste Disposal Facilities," EPA-530/SW-611, August 1977 and "Methods for Chemical Analysis of Water and Wastes," EPA-600/4-79-020, March 1979 for discussions of sampling and analysis procedures.

  (b) The owner or operator shall determine the concentration or value of the following parameters in ground-water samples in accordance with Subsections R315-265-92(c) and (d):

  (1) Parameters characterizing the suitability of the ground water as a drinking water supply, as specified in Appendix III to 40 CFR 265, which is adopted and incorporated by reference.

  (2) Parameters establishing ground-water quality:

  (i) Chloride

  (ii) Iron

  (iii) Manganese

  (iv) Phenols

  (v) Sodium

  (vi) Sulfate

  Comment: These parameters are to be used as a basis for comparison in the event a ground-water quality assessment is required under Subsection R315-265-93(d).

  (3) Parameters used as indicators of ground-water contamination:

  (i) pH

  (ii) Specific Conductance

  (iii) Total Organic Carbon

  (iv) Total Organic Halogen

  (c)(1) For all monitoring wells, the owner or operator shall establish initial background concentrations or values of all parameters specified in Subsection R315-265-92(b). He shall do this quarterly for one year.

  (2) For each of the indicator parameters specified in Subsection R315-265-92(b)(3), at least four replicate measurements shall be obtained for each sample and the initial background arithmetic mean and variance shall be determined by pooling the replicate measurements for the respective parameter concentrations or values in samples obtained from upgradient wells during the first year.

  (d) After the first year, all monitoring wells shall be sampled and the samples analyzed with the following frequencies:

  (1) Samples collected to establish ground-water quality shall be obtained and analyzed for the parameters specified in Subsection R315-265-92(b)(2) at least annually.

  (2) Samples collected to indicate ground-water contamination shall be obtained and analyzed for the parameters specified in Subsection R315-265-92(b)(3) at least semi-annually.

  (e) Elevation of the ground-water surface at each monitoring well shall be determined each time a sample is obtained.


R315-265-93. Ground-Water Monitoring -- Preparation, Evaluation, and Response
Latest version.

  (a) Within one year after the effective date of these regulations, the owner or operator shall prepare an outline of a ground-water quality assessment program. The outline shall describe a more comprehensive ground-water monitoring program, than that described in Sections R315-265-91 and 265-92, capable of determining:

  (1) Whether hazardous waste or hazardous waste constituents have entered the ground water;

  (2) The rate and extent of migration of hazardous waste or hazardous waste constituents in the ground water; and

  (3) The concentrations of hazardous waste or hazardous waste constituents in the ground water.

  (b) For each indicator parameter specified in Subsection R315-265-92(b)(3), the owner or operator shall calculate the arithmetic mean and variance, based on at least four replicate measurements on each sample, for each well monitored in accordance with Subsection R315-265-92(d)(2), and compare these results with its initial background arithmetic mean. The comparison shall consider individually each of the wells in the monitoring system, and shall use the Student's t-test at the 0.01 level of significance, see Appendix IV to 40 CFR 265, which is adopted and incorporated by reference, to determine statistically significant increases, and decreases, in the case of pH, over initial background.

  (c)(1) If the comparisons for the upgradient wells made under Subsection R315-265-93(b) show a significant increase, or pH decrease, the owner or operator shall submit this information in accordance with Subsection R315-265-94(a)(2)(ii).

  (2) If the comparisons for downgradient wells made under Subsection R315-265-93(b) show a significant increase, or pH decrease, the owner or operator shall then immediately obtain additional ground-water samples from those downgradient wells where a significant difference was detected, split the samples in two, and obtain analyses of all additional samples to determine whether the significant difference was a result of laboratory error.

  (d)(1) If the analyses performed under Subsection R315-265-93(c)(2) confirm the significant increase, or pH decrease, the owner or operator shall provide written notice to the Director---within seven days of the date of such confirmation---that the facility may be affecting ground-water quality.

  (2) Within 15 days after the notification under Subsection R315-265-93(d)(1), the owner or operator shall develop a specific plan, based on the outline required under Subsection R315-265-93(a) and certified by a qualified geologist or geotechnical engineer, for a ground-water quality assessment at the facility. This plan shall be placed in the facility operating record and be maintained until closure of the facility.

  (3) The plan to be submitted under Subsection R315-265-90(d)(1) or Subsection R315-265-93(d)(2)shall specify:

  (i) The number, location, and depth of wells;

  (ii) Sampling and analytical methods for those hazardous wastes or hazardous waste constituents in the facility;

  (iii) Evaluation procedures, including any use of previously-gathered ground-water quality information; and

  (iv) A schedule of implementation.

  (4) The owner or operator shall implement the ground-water quality assessment plan which satisfies the requirements of Subsection R315-265-93(d)(3), and, at a minimum, determine:

  (i) The rate and extent of migration of the hazardous waste or hazardous waste constituents in the ground water; and

  (ii) The concentrations of the hazardous waste or hazardous waste constituents in the ground water.

  (5) The owner or operator shall make his first determination under Subsection R315-265-93(d)(4), as soon as technically feasible, and prepare a report containing an assessment of ground-water quality. This report shall be placed in the facility operating record and be maintained until closure of the facility.

  (6) If the owner or operator determines, based on the results of the first determination under Subsection R315-265-93(d)(4), that no hazardous waste or hazardous waste constituents from the facility have entered the ground water, then he may reinstate the indicator evaluation program described in Section R315-265-92 and Subsection R315-265-93(b). If the owner or operator reinstates the indicator evaluation program, he shall so notify the Director in the report submitted under Subsection R315-265-93(d)(5).

  (7) If the owner or operator determines, based on the first determination under Subsection R315-265-93(d)(4), that hazardous waste or hazardous waste constituents from the facility have entered the ground water, then he:

  (i) Shall continue to make the determinations required under Subsection R315-265-93(d)(4) on a quarterly basis until final closure of the facility, if the ground-water quality assessment plan was implemented prior to final closure of the facility; or

  (ii) May cease to make the determinations required under Subsection R315-265-93(d)(4), if the ground-water quality assessment plan was implemented during the post-closure care period.

  (e) Notwithstanding any other provision of Sections R315-265-90 through R315-265-94, any ground-water quality assessment to satisfy the requirements of Subsection R315-265-93(d)(4) which is initiated prior to final closure of the facility shall be completed and reported in accordance with Subsection R315-265-93(d)(5).

  (f) Unless the ground water is monitored to satisfy the requirements of Subsection R315-265-93(d)(4), at least annually the owner or operator shall evaluate the data on ground-water surface elevations obtained under Subsection R315-265-92(e) to determine whether the requirements under Subsection R315-265-91(a) for locating the monitoring wells continues to be satisfied. If the evaluation shows that Subsection R315-265-91(a) is no longer satisfied, the owner or operator shall immediately modify the number, location, or depth of the monitoring wells to bring the ground-water monitoring system into compliance with this requirement.


R315-265-94. Ground-Water Monitoring -- Recordkeeping and Reporting
Latest version.

  (a) Unless the ground water is monitored to satisfy the requirements of Subsection R315-265-93(d)(4), the owner or operator shall:

  (1) Keep records of the analyses required in Subsections R315-265-92(c) and (d), the associated ground-water surface elevations required in Subsection R315-265-92(e), and the evaluations required in Subsection R315-265-93(b) throughout the active life of the facility, and, for disposal facilities, throughout the post-closure care period as well; and

  (2) Report the following ground-water monitoring information to the Director:

  (i) During the first year when initial background concentrations are being established for the facility: concentrations or values of the parameters listed in Subsection R315-265-92(b)(1) for each ground-water monitoring well within 15 days after completing each quarterly analysis. The owner or operator shall separately identify for each monitoring well any parameters whose concentration or value has been found to exceed the maximum contaminant levels listed in Appendix III to 40 CFR 265, which is adopted and incorporated by reference.

  (ii) Annually: Concentrations or values of the parameters listed in Subsection R315-265-92(b)(3) for each ground-water monitoring well, along with the required evaluations for these parameters under Subsection R315-265-93(b). The owner or operator shall separately identify any significant differences from initial background found in the upgradient wells, in accordance with Subsection R315-265-93(c)(1). During the active life of the facility, this information shall be submitted no later than March 1 following each calendar year.

  (iii) No later than March 1 following each calendar year: Results of the evaluations of ground-water surface elevations under Subsection R315-265-93(f), and a description of the response to that evaluation, where applicable.

  (b) If the ground water is monitored to satisfy the requirements of Subsection R315-265-93(d)(4), the owner or operator shall:

  (1) Keep records of the analyses and evaluations specified in the plan, which satisfies the requirements of Subsection R315-265-93(d)(3), throughout the active life of the facility, and, for disposal facilities, throughout the post-closure care period as well; and

  (2) Annually, until final closure of the facility, submit to the Director a report containing the results of his or her ground-water quality assessment program which includes, but is not limited to, the calculated, or measured, rate of migration of hazardous waste or hazardous waste constituents in the ground water during the reporting period. This information shall be submitted no later than March 1 following each calendar year.


R315-265-110. Closure and Post-Closure -- Applicability
Latest version.

  Except as Section R315-265-1 provides otherwise:

  (a) Sections R315-265-111 through 265-115, which concern closure, apply to the owners and operators of all hazardous waste management facilities; and

  (b) Sections R315-265-116 through R315-265-120, which concern post-closure care, apply to the owners and operators of:

  (1) All hazardous waste disposal facilities;

  (2) Waste piles and surface impoundments for which the owner or operator intends to remove the wastes at closure to the extent that these sections are made applicable to such facilities in Sections R315-265-228 or R315-265-258;

  (3) Tank systems that are required under Section R315-265-197 to meet requirements for landfills; and

  (4) Containment buildings that are required under 40 CFR 265.1102, which is adopted and incorporated by reference, to meet the requirement for landfills.

  (c) Section R315-265-121 applies to owners and operators of units that are subject to the requirements of Subsection R315-270-1(c)(7) and are regulated under an enforceable document, as defined in Subsection R315-270-1(c)(7).

  (d) The Director may replace all or part of the requirements of Sections R315-265-110 through 265-121, and the unit-specific standards in Subsection R315-265-111(c), applying to a regulated unit, as defined in Section R315-264-90, with alternative requirements for closure set out in an approved closure or post-closure plan, or in an enforceable document, as defined in Subsection R315-270-1(c)(7), where the Director determines that:

  (1) A regulated unit is situated among solid waste management units, or areas of concern, a release has occurred, and both the regulated unit and one or more solid waste management unit(s), or areas of concern, are likely to have contributed to the release, and

  (2) It is not necessary to apply the closure requirements of Sections R315-265-110 through 265-121, those referenced herein, or both, because the alternative requirements will protect human health and the environment, and will satisfy the closure performance standard of Subsections R315-265-111(a) and (b).


R315-265-111. Closure and Post-Closure -- Closure Performance Standard
Latest version.

  The owner or operator shall close the facility in a manner that:

  (a) Minimizes the need for further maintenance, and

  (b) Controls, minimizes or eliminates, to the extent necessary to protect human health and the environment, post-closure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition products to the ground or surface waters or to the atmosphere, and

  (c) Complies with the closure requirements of Sections R315-110 through 121, including, but not limited to, the requirements of Sections R315-265-197, R315-265-228, R315-265-258, and 40 CFR 265.280, 265.310, 265.351, 265.381, 265.404, and 265.1102, which are adopted and incorporated by reference.


R315-265-112. Closure and Post-Closure -- Closure Plan; Amendment of Plan
Latest version.

  (a) Written plan. By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility to provisions of Section R315-265-112, the owner or operator of a hazardous waste management facility shall have a written closure plan. Until final closure is completed and certified in accordance with Section R315-265-115, a copy of the most current plan shall be furnished to the Director upon request, including request by mail. In addition, for facilities without approved plans, it shall also be provided during site inspections, on the day of inspection, to any officer, employee, or representative of the Director who is duly designated by the Director.

  (b) Content of plan. The plan shall identify steps necessary to perform partial, final, or both, closure of the facility at any point during its active life. The closure plan shall include, at least:

  (1) A description of how each hazardous waste management unit at the facility will be closed in accordance with Section R315-265-111; and

  (2) A description of how final closure of the facility will be conducted in accordance with Section R315-265-111. The description shall identify the maximum extent of the operation which will be unclosed during the active life of the facility; and

  (3) An estimate of the maximum inventory of hazardous wastes ever on-site over the active life of the facility and a detailed description of the methods to be used during partial and final closure, including, but not limited to methods for removing, transporting, treating, storing or disposing of all hazardous waste, identification of and the type(s) of off-site hazardous waste management unit(s) to be used, if applicable; and

  (4) A detailed description of the steps needed to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during partial and final closure including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and

  (5) A detailed description of other activities necessary during the partial and final closure periods to ensure that all partial closures and final closure satisfy the closure performance standards, including, but not limited to, ground-water monitoring, leachate collection, and run-on and run-off control; and

  (6) A schedule for closure of each hazardous waste management unit and for final closure of the facility. The schedule shall include, at a minimum, the total time required to close each hazardous waste management unit and the time required for intervening closure activities which will allow tracking of the progress of partial and final closure. For example, in the case of a landfill unit, estimates of the time required to treat or dispose of all hazardous waste inventory and of the time required to place a final cover shall be included.; and

  (7) An estimate of the expected year of final closure for facilities that use trust funds to demonstrate financial assurance under Sections R315-265-143 or 265-145 and whose remaining operating life is less than twenty years, and for facilities without approved closure plans.

  (8) For facilities where the Director has applied alternative requirements at a regulated unit under Subsections R315-265-90(f), R315-265-110(d), R315-265-140(d), or all three, either the alternative requirements applying to the regulated unit, or a reference to the enforceable document containing those alternative requirements.

  (c) Amendment of plan. The owner or operator may amend the closure plan at any time prior to the notification of partial or final closure of the facility. An owner or operator with an approved closure plan shall submit a written request to the Director to authorize a change to the approved closure plan. The written request shall include a copy of the amended closure plan for approval by the Director.

  (1) The owner or operator shall amend the closure plan whenever:

  (i) Changes in operating plans or facility design affect the closure plan, or

  (ii) There is a change in the expected year of closure, if applicable, or

  (iii) In conducting partial or final closure activities, unexpected events require a modification of the closure plan.

  (iv) The owner or operator requests the Director to apply alternative requirements to a regulated unit under Subsections R315-265-90(f), R315-265-110(d), R315-265-140(d), or all three.

  (2) The owner or operator shall amend the closure plan at least 60 days prior to the proposed change in facility design or operation, or no later than 60 days after an unexpected event has occurred which has affected the closure plan. If an unexpected event occurs during the partial or final closure period, the owner or operator shall amend the closure plan no later than 30 days after the unexpected event. These provisions also apply to owners or operators of surface impoundments and waste piles who intended to remove all hazardous wastes at closure, but are required to close as landfills in accordance with 40 CFR 265.310, which is adopted and incorporated by reference.

  (3) An owner or operator with an approved closure plan shall submit the modified plan to the Director at least 60 days prior to the proposed change in facility design or operation, or no more than 60 days after an unexpected event has occurred which has affected the closure plan. If an unexpected event has occurred during the partial or final closure period, the owner or operator shall submit the modified plan no more than 30 days after the unexpected event. These provisions also apply to owners or operators of surface impoundments and waste piles who intended to remove all hazardous wastes at closure but are required to close as landfills in accordance with 40 CFR 265.310, which is adopted and incorporated by reference. If the amendment to the plan is a Class 2 or 3 modification according to the criteria in Section R315-270-42, the modification to the plan will be approved according to the procedures in Subsection R315-265-112(d)(4).

  (4) The Director may request modifications to the plan under the conditions described in Subsection R315-265-112(c)(1). An owner or operator with an approved closure plan shall submit the modified plan within 60 days of the request from the Director, or within 30 days if the unexpected event occurs during partial or final closure. If the amendment is considered a Class 2 or 3 modification according to the criteria in Section R315-270-42, the modification to the plan will be approved in accordance with the procedures in Subsection R315-265-112(d)(4).

  (d) Notification of partial closure and final closure.

  (1) The owner or operator shall submit the closure plan to the Director at least 180 days prior to the date on which he expects to begin closure of the first surface impoundment, waste pile, land treatment, or landfill unit, or final closure if it involves such a unit, whichever is earlier. The owner or operator shall submit the closure plan to the Director at least 45 days prior to the date on which he expects to begin partial or final closure of a boiler or industrial furnace. The owner or operator shall submit the closure plan to the Director at least 45 days prior to the date on which he expects to begin final closure of a facility with only tanks, container storage, or incinerator units. Owners or operators with approved closure plans shall notify the Director in writing at least 60 days prior to the date on which he expects to begin closure of a surface impoundment, waste pile, landfill, or land treatment unit, or final closure of a facility involving such a unit. Owners or operators with approved closure plans shall notify the Director in writing at least 45 days prior to the date on which he expects to begin partial or final closure of a boiler or industrial furnace. Owners or operators with approved closure plans shall notify the Director in writing at least 45 days prior to the date on which he expects to begin final closure of a facility with only tanks, container storage, or incinerator units.

  (2) The date when he "expects to begin closure" shall be either:

  (i) Within 30 days after the date on which any hazardous waste management unit receives the known final volume of hazardous wastes, or, if there is a reasonable possibility that the hazardous waste management unit will receive additional hazardous wastes, no later than one year after the date on which the unit received the most recent volume of hazardous waste. If the owner or operator of a hazardous waste management unit can demonstrate to the Director that the hazardous waste management unit or facility has the capacity to receive additional hazardous wastes and he has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all interim status requirements, the Director may approve an extension to this one-year limit; or

  (ii) For units meeting the requirements of Subsection R315-265-113(d), no later than 30 days after the date on which the hazardous waste management unit receives the known final volume of nonhazardous wastes, or if there is a reasonable possibility that the hazardous waste management unit will receive additional nonhazardous wastes, no later than one year after the date on which the unit received the most recent volume of nonhazardous wastes. If the owner or operator can demonstrate to the Director that the hazardous waste management unit has the capacity to receive additional nonhazardous wastes and he has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all applicable interim status requirements, the Director may approve an extension to this one-year limit.

  (3) The owner or operator shall submit his closure plan to the Director no later than 15 days after:

  (i) Termination of interim status except when a permit is issued simultaneously with termination of interim status; or

  (ii) Issuance of a judicial decree or final order under section 3008 of RCRA to cease receiving hazardous wastes or close.

  (4) The Director will provide the owner or operator and the public, through a newspaper notice, the opportunity to submit written comments on the plan and request modifications to the plan no later than 30 days from the date of the notice. He will also, in response to a request or at his own discretion, hold a public hearing whenever such a hearing might clarify one or more issues concerning a closure plan. The Director will give public notice of the hearing at least 30 days before it occurs. Public notice of the hearing may be given at the same time as notice of the opportunity for the public to submit written comments, and the two notices may be combined. The Director will approve, modify, or disapprove the plan within 90 days of its receipt. If the Director does not approve the plan he shall provide the owner or operator with a detailed written statement of reasons for the refusal and the owner or operator shall modify the plan or submit a new plan for approval within 30 days after receiving such written statement. The Director will approve or modify this plan in writing within 60 days. If the Director modifies the plan, this modified plan becomes the approved closure plan. The Director shallt assure that the approved plan is consistent with Sections R315-265-111 through 265-115 and the applicable requirements of Sections R315-265-90 through 265-94, and Sections R315-265-197, R315-265-228, R315-265-258, and 40 CFR 265.280, 265.310, 265.351, 265.381, 265.404, and 265.1102, which are adopted and incorporated by reference. A copy of the modified plan with a detailed statement of reasons for the modifications shall be mailed to the owner or operator.

  (e) Removal of wastes and decontamination or dismantling of equipment. Nothing in Section R315-265-112 shall preclude the owner or operator from removing hazardous wastes and decontaminating or dismantling equipment in accordance with the approved partial or final closure plan at any time before or after notification of partial or final closure.


R315-265-113. Closure and Post-Closure -- Closure; Time Allowed for Closure
Latest version.

  (a) Within 90 days after receiving the final volume of hazardous wastes, or the final volume of nonhazardous wastes if the owner or operator complies with all applicable requirements in Subsections R315-265-113(d) and (e), at a hazardous waste management unit or facility, or within 90 days after approval of the closure plan, whichever is later, the owner or operator shall treat, remove from the unit or facility, or dispose of on-site, all hazardous wastes in accordance with the approved closure plan. The Director may approve a longer period if the owner or operator demonstrates that:

  (1)(i) The activities required to comply with this Subsection R315-265-113(a) will, of necessity, take longer than 90 days to complete; or

  (ii)(A) The hazardous waste management unit or facility has the capacity to receive additional hazardous wastes, or has the capacity to receive non-hazardous wastes if the facility owner or operator complies with Subsections R315-265-113(d) and (e); and

  (B) There is a reasonable likelihood that he or another person will recommence operation of the hazardous waste management unit or the facility within one year; and

  (C) Closure of the hazardous waste management unit or facility would be incompatible with continued operation of the site; and

  (2) He has taken and will continue to take all steps to prevent threats to human health and the environment, including compliance with all applicable interim status requirements.

  (b) The owner or operator shall complete partial and final closure activities in accordance with the approved closure plan and within 180 days after receiving the final volume of hazardous wastes, or the final volume of nonhazardous wastes if the owner or operator complies with all applicable requirements in Subsections R315-265-113(d) and (e), at the hazardous waste management unit or facility, or 180 days after approval of the closure plan, if that is later. The Director may approve an extension to the closure period if the owner or operator demonstrates that:

  (1)(i) The partial or final closure activities will, of necessity, take longer than 180 days to complete; or

  (ii)(A) The hazardous waste management unit or facility has the capacity to receive additional hazardous wastes, or has the capacity to receive non-hazardous wastes if the facility owner or operator complies with Subsections R315-265-113(d) and (e); and

  (B) There is reasonable likelihood that he or another person will recommence operation of the hazardous waste management unit or the facility within one year; and

  (C) Closure of the hazardous waste management unit or facility would be incompatible with continued operation of the site; and

  (2) He has taken and will continue to take all steps to prevent threats to human health and the environment from the unclosed but not operating hazardous waste management unit or facility, including compliance with all applicable interim status requirements.

  (c) The demonstrations referred to in Subsections R315-265-113(a)(1) and (b)(1) shall be made as follows:

  (1) The demonstrations in Subsection R315-265-113(a)(1) shall be made at least 30 days prior to the expiration of the 90-day period in Subsection R315-265-113(a); and

  (2) The demonstration in Subsection R315-265-113(b)(1) shall be made at least 30 days prior to the expiration of the 180-day period in Subsection R315-265-113(b), unless the owner or operator is otherwise subject to the deadlines in Subsection R315-265-113(d).

  (d) The Director may allow an owner or operator to receive non-hazardous wastes in a landfill, land treatment, or surface impoundment unit after the final receipt of hazardous wastes at that unit if:

  (1) The owner or operator submits an amended part B application, or a part B application, if not previously required, and demonstrates that:

  (i) The unit has the existing design capacity as indicated on the part A application to receive non-hazardous wastes; and

  (ii) There is a reasonable likelihood that the owner or operator or another person will receive non-hazardous wastes in the unit within one year after the final receipt of hazardous wastes; and

  (iii) The non-hazardous wastes will not be incompatible with any remaining wastes in the unit or with the facility design and operating requirements of the unit or facility under Rule R315-265; and

  (iv) Closure of the hazardous waste management unit would be incompatible with continued operation of the unit or facility; and

  (v) The owner or operator is operating and will continue to operate in compliance with all applicable interim status requirements; and

  (2) The part B application includes an amended waste analysis plan, ground-water monitoring and response program, human exposure assessment required under RCRA section 3019, and closure and post-closure plans, and updated cost estimates and demonstrations of financial assurance for closure and post-closure care as necessary and appropriate to reflect any changes due to the presence of hazardous constituents in the non-hazardous wastes, and changes in closure activities, including the expected year of closure if applicable under Subsection R315-265-112(b)(7), as a result of the receipt of non-hazardous wastes following the final receipt of hazardous wastes; and

  (3) The part B application is amended, as necessary and appropriate, to account for the receipt of non-hazardous wastes following receipt of the final volume of hazardous wastes; and

  (4) The part B application and the demonstrations referred to in Subsections R315-265-113(d)(1) and (d)(2) are submitted to the Director no later than 180 days prior to the date on which the owner or operator of the facility receives the known final volume of hazardous wastes, or no later than 90 days after the effective date of Rule R315-265, whichever is later.

  (e) In addition to the requirements in Subsection R315-265-113(d), an owner or operator of a hazardous waste surface impoundment that is not in compliance with the liner and leachate collection system requirements in 42 U.S.C. 3004(o)(1) and 3005(j)(1) or 42 U.S.C. 3004(o)(2) or (3) or 3005(j) (2), (3), (4) or (13) shall:

  (1) Submit with the part B application:

  (i) A contingent corrective measures plan; and

  (ii) A plan for removing hazardous wastes in compliance with Subsection R315-265-113(e)(2); and

  (2) Remove all hazardous wastes from the unit by removing all hazardous liquids and removing all hazardous sludges to the extent practicable without impairing the integrity of the liner(s), if any.

  (3) Removal of hazardous wastes shall be completed no later than 90 days after the final receipt of hazardous wastes. The Director may approve an extension to this deadline if the owner or operator demonstrates that the removal of hazardous wastes will, of necessity, take longer than the allotted period to complete and that an extension will not pose a threat to human health and the environment.

  (4) If a release that is a statistically significant increase, or decrease in the case of pH, in hazardous constituents over background levels is detected in accordance with the requirements in Sections R315-265-90 through 265-94, the owner or operator of the unit:

  (i) Shall implement corrective measures in accordance with the approved contingent corrective measures plan required by Subsection R315-265-113(e)(1) no later than one year after detection of the release, or approval of the contingent corrective measures plan, whichever is later;

  (ii) May receive wastes at the unit following detection of the release only if the approved corrective measures plan includes a demonstration that continued receipt of wastes will not impede corrective action; and

  (iii) May be required by the Director to implement corrective measures in less than one year or to cease receipt of wastes until corrective measures have been implemented if necessary to protect human health and the environment.

  (5) During the period of corrective action, the owner or operator shall provide annual reports to the Director describing the progress of the corrective action program, compile all ground-water monitoring data, and evaluate the effect of the continued receipt of non-hazardous wastes on the effectiveness of the corrective action.

  (6) The Director may require the owner or operator to commence closure of the unit if the owner or operator fails to implement corrective action measures in accordance with the approved contingent corrective measures plan within one year as required in Subsection R315-265-113(e)(4), or fails to make substantial progress in implementing corrective action and achieving the facility's background levels.

  (7) If the owner or operator fails to implement corrective measures as required in Subsection R315-265-113(e)(4), or if the Director determines that substantial progress has not been made pursuant to Subsection R315-265-113(e)(6) he shall:

  (i) Notify the owner or operator in writing that the owner or operator shall begin closure in accordance with the deadline in Subsections R315-265-113(a) and (b) and provide a detailed statement of reasons for this determination, and

  (ii) Provide the owner or operator and the public, through a newspaper notice, the opportunity to submit written comments on the decision no later than 20 days after the date of the notice.

  (iii) If the Director receives no written comments, the decision will become final five days after the close of the comment period. The Director will notify the owner or operator that the decision is final, and that a revised closure plan, if necessary, shall be submitted within 15 days of the final notice and that closure shall begin in accordance with the deadlines in Subsections R315-265-113(a) and (b).

  (iv) If the Director receives written comments on the decision, he shall make a final decision within 30 days after the end of the comment period, and provide the owner or operator in writing and the public through a newspaper notice, a detailed statement of reasons for the final decision. If the Director determines that substantial progress has not been made, closure shall be initiated in accordance with the deadlines in Subsections R315-265-113(a) and (b).

  (v) The final determinations made by the Director under Subsections R315-265-113(e)(7)(iii) and (iv) are not subject to administrative appeal.


R315-265-114. Closure and Post-Closure -- Disposal or Decontamination of Equipment, Structures and Soils
Latest version.

  During the partial and final closure periods, all contaminated equipment, structures and soil shall be properly disposed of, or decontaminated unless specified otherwise in Sections R315-265-197, 265-228, 265-258, or 40 CFR 265.280, or 265.310, which are adopted and incorporated by reference. By removing all hazardous wastes or hazardous constituents during partial and final closure, the owner or operator may become a generator of hazardous waste and shall handle that hazardous waste in accordance with all applicable requirements of Rule R315-262.


R315-265-115. Closure and Post-Closure -- Certification of Closure
Latest version.

  Within 60 days of completion of closure of each hazardous waste surface impoundment, waste pile, land treatment, and landfill unit, and within 60 days of completion of final closure, the owner or operator shall submit to the Director, by registered mail, a certification that the hazardous waste management unit or facility, as applicable, has been closed in accordance with the specifications in the approved closure plan. The certification shall be signed by the owner or operator and by a qualified Professional Engineer. Documentation supporting the Professional Engineer's certification shall be furnished to the Director upon request until he releases the owner or operator from the financial assurance requirements for closure under Subsection R315-265-143(h).


R315-265-116. Closure and Post-Closure -- Survey Plat
Latest version.

  No later than the submission of the certification of closure of each hazardous waste disposal unit, an owner or operator shall submit to the local zoning authority, or the authority with jurisdiction over local land use, and to the Director, a survey plat indicating the location and dimensions of landfill cells or other hazardous waste disposal units with respect to permanently surveyed benchmarks. This plat shall be prepared and certified by a professional land surveyor. The plat filed with the local zoning authority, or the authority with jurisdiction over local land use shall contain a note, prominently displayed, which states the owner's or operator's obligation to restrict disturbance of the hazardous waste disposal unit in accordance with the applicable regulations in Sections R315-265-110 through 265-121.


R315-265-117. Closure and Post-Closure -- Post-Closure Care and Use of Property
Latest version.

  (a)(1) Post-closure care for each hazardous waste management unit subject to the requirements of Sections R315-265-117 through 265-120 shall begin after completion of closure of the unit and continue for 30 years after that date. It shall consist of at least the following:

  (i) Monitoring and reporting in accordance with the requirements of Sections R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250 through 265-260, and subparts M, and N of 40 CFR 265, which are adopted and incorporated by reference; and

  (ii) Maintenance and monitoring of waste containment systems in accordance with the requirements of Sections R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250 through 265-260, and subparts M, and N of 40 CFR 265, which are adopted and incorporated by reference.

  (2) Any time preceding closure of a hazardous waste management unit subject to post-closure care requirements or final closure, or any time during the post-closure period for a particular hazardous waste disposal unit, the Director may:

  (i) Shorten the post-closure care period applicable to the hazardous waste management unit, or facility, if all disposal units have been closed, if he finds that the reduced period is sufficient to protect human health and the environment, for example, leachate or ground-water monitoring results, characteristics of the hazardous waste, application of advanced technology, or alternative disposal, treatment, or re-use techniques indicate that the hazardous waste management unit or facility is secure; or

  (ii) Extend the post-closure care period applicable to the hazardous waste management unit or facility, if he finds that the extended period is necessary to protect human health and the environment, for example, leachate or ground-water monitoring results indicate a potential for migration of hazardous wastes at levels which may be harmful to human health and the environment.

  (b) The Director may require, at partial and final closure, continuation of any of the security requirements of Section R315-265-14 during part or all of the post-closure period when:

  (1) Hazardous wastes may remain exposed after completion of partial or final closure; or

  (2) Access by the public or domestic livestock may pose a hazard to human health.

  (c) Post-closure use of property on or in which hazardous wastes remain after partial or final closure shall never be allowed to disturb the integrity of the final cover, liner(s), or any other components of the containment system, or the function of the facility's monitoring systems, unless the Director finds that the disturbance:

  (1) Is necessary to the proposed use of the property, and will not increase the potential hazard to human health or the environment; or

  (2) Is necessary to reduce a threat to human health or the environment.

  (d) All post-closure care activities shall be in accordance with the provisions of the approved post-closure plan as specified in Section R315-265-118.


R315-265-118. Closure and Post-Closure -- Post-Closure Plan; Amendment of Plan
Latest version.

  (a) Written plan. By May 19, 1981, the owner or operator of a hazardous waste disposal unit shall have a written post-closure plan. An owner or operator of a surface impoundment or waste pile that intends to remove all hazardous wastes at closure shall prepare a post-closure plan and submit it to the Director within 90 days of the date that the owner or operator or Director determines that the hazardous waste management unit or facility shall be closed as a landfill, subject to the requirements of Sections R315-265-117 through 265-120.

  (b) Until final closure of the facility, a copy of the most current post-closure plan shall be furnished to the Director upon request, including request by mail. In addition, for facilities without approved post-closure plans, it shall also be provided during site inspections, on the day of inspection, to any officer, employee or representative of the Director. After final closure has been certified, the person or office specified in Subsection R315-265-118(c)(3) shall keep the approved post-closure plan during the post-closure period.

  (c) For each hazardous waste management unit subject to the requirements of this Section R315-265-118, the post-closure plan shall identify the activities that will be carried on after closure of each disposal unit and the frequency of these activities, and include at least:

  (1) A description of the planned monitoring activities and frequencies at which they will be performed to comply with Sections R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250 through 265-260, and subparts M, and N of 40 CFR 265, which are adopted and incorporated by reference, during the post-closure care period; and

  (2) A description of the planned maintenance activities, and frequencies at which they will be performed, to ensure:

  (i) The integrity of the cap and final cover or other containment systems in accordance with the requirements of Sections R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250 through 265-260, and subparts M, and N of 40 CFR 265, which are adopted and incorporated by reference; and

  (ii) The function of the monitoring equipment in accordance with the requirements of Sections R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250 through 265-260, and subparts M, and N of 40 CFR 265, which are adopted and incorporated by reference; and

  (3) The name, address, and phone number of the person or office to contact about the hazardous waste disposal unit or facility during the post-closure care period.

  (4) For facilities subject to Section R315-265-121, provisions that satisfy the requirements of Subsections R315-265-121(a)(1) and (3).

  (5) For facilities where the Director has applied alternative requirements at a regulated unit under Subsections R315-265-90(f), R315-265-110(d), R315-265-140(d), or all three, either the alternative requirements that apply to the regulated unit, or a reference to the enforceable document containing those requirements.

  (d) Amendment of plan. The owner or operator may amend the post-closure plan any time during the active life of the facility or during the post-closure care period. An owner or operator with an approved post-closure plan shall submit a written request to the Director to authorize a change to the approved plan. The written request shall include a copy of the amended post-closure plan for approval by the Director.

  (1) The owner or operator shall amend the post-closure plan whenever:

  (i) Changes in operating plans or facility design affect the post-closure plan, or

  (ii) Events which occur during the active life of the facility, including partial and final closures, affect the post-closure plan.

  (iii) The owner or operator requests the Director to apply alternative requirements to a regulated unit under Subsections R315-265.90(f), R315-265.110(d), R315-265.140(d) or all three.

  (2) The owner or operator shall amend the post-closure plan at least 60 days prior to the proposed change in facility design or operation, or no later than 60 days after an unexpected event has occurred which has affected the post-closure plan.

  (3) An owner or operator with an approved post-closure plan shall submit the modified plan to the Director at least 60 days prior to the proposed change in facility design or operation, or no more than 60 days after an unexpected event has occurred which has affected the post-closure plan. If an owner or operator of a surface impoundment or a waste pile who intended to remove all hazardous wastes at closure in accordance with Subsections R315-265-228(b) or R315-265-258(a) is required to close as a landfill in accordance with 40 CFR 265.310, which is adopted and incorporated by reference, the owner or operator shall submit a post-closure plan within 90 days of the determination by the owner or operator or Director that the unit shall be closed as a landfill. If the amendment to the post-closure plan is a Class 2 or 3 modification according to the criteria in Section R315-270-42, the modification to the plan will be approved according to the procedures in Subsection R315-265-118(f).

  (4) The Director may request modifications to the plan under the conditions described in Section R315-265-118(d)(1). An owner or operator with an approved post-closure plan shall submit the modified plan no later than 60 days of the request from the Director. If the amendment to the plan is considered a Class 2 or 3 modification according to the criteria in Section R315-270-42, the modifications to the post-closure plan will be approved in accordance with the procedures in Subsection R315-265-118(f). If the Director determines that an owner or operator of a surface impoundment or waste pile who intended to remove all hazardous wastes at closure shall close the facility as a landfill, the owner or operator shall submit a post-closure plan for approval to the Director within 90 days of the determination.

  (e) The owner or operator of a facility with hazardous waste management units subject to these requirements shall submit his post-closure plan to the Director at least 180 days before the date he expects to begin partial or final closure of the first hazardous waste disposal unit. The date he "expects to begin closure" of the first hazardous waste disposal unit shall be either within 30 days after the date on which the hazardous waste management unit receives the known final volume of hazardous waste or, if there is a reasonable possibility that the hazardous waste management unit will receive additional hazardous wastes, no later than one year after the date on which the unit received the most recent volume of hazardous wastes. The owner or operator shall submit the post-closure plan to the Director no later than 15 days after:

  (1) Termination of interim status, except when a permit is issued to the facility simultaneously with termination of interim status; or

  (2) Issuance of a judicial decree or final orders under section 3008 of RCRA to cease receiving wastes or close.

  (f) The Director will provide the owner or operator and the public, through a newspaper notice, the opportunity to submit written comments on the post-closure plan and request modifications to the plan no later than 30 days from the date of the notice. He will also, in response to a request or at his own discretion, hold a public hearing whenever such a hearing might clarify one or more issues concerning a post-closure plan. The Director will give public notice of the hearing at least 30 days before it occurs. Public notice of the hearing may be given at the same time as notice of the opportunity for the public to submit written comments, and the two notices may be combined. The Director will approve, modify, or disapprove the plan within 90 days of its receipt. If the Director does not approve the plan he shall provide the owner or operator with a detailed written statement of reasons for the refusal and the owner or operator shall modify the plan or submit a new plan for approval within 30 days after receiving such written statement. The Director will approve or modify this plan in writing within 60 days. If the Director modifies the plan, this modified plan becomes the approved post-closure plan. The Director shall ensure that the approved post-closure plan is consistent with Sections R315-265-117 through 265-120. A copy of the modified plan with a detailed statement of reasons for the modifications shall be mailed to the owner or operator.

  (g) The post-closure plan and length of the post-closure care period may be modified any time prior to the end of the post-closure care period in either of the following two ways:

  (1) The owner or operator or any member of the public may petition the Director to extend or reduce the post-closure care period applicable to a hazardous waste management unit or facility based on cause, or alter the requirements of the post-closure care period based on cause.

  (i) The petition shall include evidence demonstrating that:

  (A) The secure nature of the hazardous waste management unit or facility makes the post-closure care requirement(s) unnecessary or supports reduction of the post-closure care period specified in the current post-closure plan, for example, leachate or ground-water monitoring results, characteristics of the wastes, application of advanced technology, or alternative disposal, treatment, or re-use techniques indicate that the facility is secure, or

  (B) The requested extension in the post-closure care period or alteration of post-closure care requirements is necessary to prevent threats to human health and the environment, e.g., leachate or ground-water monitoring results indicate a potential for migration of hazardous wastes at levels which may be harmful to human health and the environment.

  (ii) These petitions will be considered by the Director only when they present new and relevant information not previously considered by the Director. Whenever the Director is considering a petition, he will provide the owner or operator and the public, through a newspaper notice, the opportunity to submit written comments within 30 days of the date of the notice. He will also, in response to a request or at his own discretion, hold a public hearing whenever a hearing might clarify one or more issues concerning the post-closure plan. The Director will give the public notice of the hearing at least 30 days before it occurs. Public notice of the hearing may be given at the same time as notice of the opportunity for written public comments, and the two notices may be combined. After considering the comments, he will issue a final determination, based upon the criteria set forth in Subsection R315-265-118(g)(1).

  (iii) If the Director denies the petition, he will send the petitioner a brief written response giving a reason for the denial.

  (2) The Director may tentatively decide to modify the post-closure plan if he deems it necessary to prevent threats to human health and the environment. He may propose to extend or reduce the post-closure care period applicable to a hazardous waste management unit or facility based on cause or alter the requirements of the post-closure care period based on cause.

  (i) The Director will provide the owner or operator and the affected public, through a newspaper notice, the opportunity to submit written comments within 30 days of the date of the notice and the opportunity for a public hearing as in Subsection R315-265-118(g)(1)(ii). After considering the comments, he will issue a final determination.

  (ii) The Director will base his final determination upon the same criteria as required for petitions under Subsection R315-265-118(g)(1)(i). A modification of the post-closure plan may include, where appropriate, the temporary suspension rather than permanent deletion of one or more post-closure care requirements. At the end of the specified period of suspension, the Director would then determine whether the requirement(s) should be permanently discontinued or reinstated to prevent threats to human health and the environment.


R315-265-119. Closure and Post-Closure -- Post-Closure Notices
Latest version.

  (a) No later than 60 days after certification of closure of each hazardous waste disposal unit, the owner or operator shall submit to the local zoning authority, or the authority with jurisdiction over local land use, and to the Director, a record of the type, location, and quantity of hazardous wastes disposed of within each cell or other disposal unit of the facility. For hazardous wastes disposed of before January 12, 1981, the owner or operator shall identify the type, location and quantity of the hazardous wastes to the best of his knowledge and in accordance with any records he has kept.

  (b) Within 60 days of certification of closure of the first hazardous waste disposal unit and within 60 days of certification of closure of the last hazardous waste disposal unit, the owner or operator shall:

  (1) Record, in accordance with Utah law, a notation on the deed to the facility property---or on some other instrument which is normally examined during title search---that will in perpetuity notify any potential purchaser of the property that:

  (i) The land has been used to manage hazardous wastes; and

  (ii) Its use is restricted under regulations in Sections R315-265-110 through 265-121; and

  (iii) The survey plat and record of the type, location, and quantity of hazardous wastes disposed of within each cell or other hazardous waste disposal unit of the facility required by Section R315-265-116 and Subsection R315-265-119(a) have been filed with the local zoning authority or the authority with jurisdiction over local land use and with the Director; and

  (2) Submit a certification signed by the owner or operator that he has recorded the notation specified in Subsection R315-265-119(b)(1) and a copy of the document in which the notation has been placed, to the Director.

  (c) If the owner or operator or any subsequent owner of the land upon which a hazardous waste disposal unit was located wishes to remove hazardous wastes and hazardous waste residues, the liner, if any, and all contaminated structures, equipment, and soils, he shall request a modification to the approved post-closure plan in accordance with the requirements of Subsection R315-265-118(g). The owner or operator shall demonstrate that the removal of hazardous wastes will satisfy the criteria of Subsection R315-265-117(c). By removing hazardous waste, the owner or operator may become a generator of hazardous waste and shall manage it in accordance with all applicable requirements of Rules R315-260 through 266, R315-268, R315-270 and R315-273. If the owner or operator is granted approval to conduct the removal activities, the owner or operator may request that the Director approve either:

  (1) The removal of the notation on the deed to the facility property or other instrument normally examined during title search, or

  (2) The addition of a notation to the deed or instrument indicating the removal of the hazardous waste.


R315-265-120. Closure and Post-Closure -- Certification of Completion of Post-Closure Care
Latest version.

  No later than 60 days after the completion of the established post-closure care period for each hazardous waste disposal unit, the owner or operator shall submit to the Director, by registered mail, a certification that the post-closure care period for the hazardous waste disposal unit was performed in accordance with the specifications in the approved post-closure plan. The certification shall be signed by the owner or operator and a qualified Professional Engineer. Documentation supporting the Professional Engineer's certification shall be furnished to the Director upon request until he releases the owner or operator from the financial assurance requirements for post-closure care under Subsection R315-265-145(h).


R315-265-121. Closure and Post-Closure -- Post-Closure Requirements for Facilities that Obtain Enforceable Documents in Lieu of Post-Closure Permits
Latest version.

  (a) Owners and operators who are subject to the requirement to obtain a post-closure permit under Subsection R315-270-1(c), but who obtain enforceable documents in lieu of post-closure permits, as provided under Subsection R315-270-1(c)(7), shall comply with the following requirements:

  (1) The requirements to submit information about the facility in Section R315-270-28;

  (2) The requirements for facility-wide corrective action in Section R315-264-101;

  (3) The requirements of Sections R315-264-91 through 264-100.

  (b)(1) The Director, in issuing enforceable documents under Section R315-265-121 in lieu of permits, will assure a meaningful opportunity for public involvement which, at a minimum, includes public notice and opportunity for public comment:

  (i) When the Director becomes involved in a remediation at the facility as a regulatory or enforcement matter;

  (ii) On the proposed preferred remedy and the assumptions upon which the remedy is based, in particular those related to land use and site characterization; and

  (iii) At the time of a proposed decision that remedial action is complete at the facility. These requirements shall be met before the Director may consider that the facility has met the requirements of Subsection R315-270-1(c)(7), unless the facility qualifies for a modification to these public involvement procedures under Subsections R315-265-121(b)(2) or (3).

  (2) If the Director determines that even a short delay in the implementation of a remedy would adversely affect human health or the environment, the Director may delay compliance with the requirements of Subsection R315-265-121(b)(1) and implement the remedy immediately. However, the Director shall assure involvement of the public at the earliest opportunity, and, in all cases, upon making the decision that additional remedial action is not needed at the facility.

  (3) The Director may allow a remediation initiated prior to October 22, 1998 to substitute for corrective action required under a post-closure permit even if the public involvement requirements of Subsection R315-265-121(b)(1) have not been met so long as the Director assures that notice and comment on the decision that no further remediation is necessary to protect human health and the environment takes place at the earliest reasonable opportunity after October 22, 1998.


R315-265-140. Financial Requirements -- Applicability
Latest version.

  (a) The requirements of Sections R315-265-142, R315-265-143, R315-265-147 and R315-265-148 apply to owners or operators of all hazardous waste facilities, except as provided otherwise in this Section R315-265-140 or in Section R315-265-1.

  (b) The requirements of Sections R315-265-144 and R315-265-145 apply only to owners and operators of:

  (1) Disposal facilities;

  (2) Tank systems that are required under Section R315-265-197 to meet the requirements for landfills; and

  (3) Containment buildings that are required under 40 CFR 265.1102, which is adopted and incorporated by reference, to meet the requirements for landfills.

  (c) States and the Federal government are exempt from the requirements of Sections R315-265-140 through 265-148.

  (d) The Director may replace all or part of the requirements of Sections R315-265-140 through 265-148 applying to a regulated unit with alternative requirements for financial assurance set out in the permit or in an enforceable document, as defined in Subsection R315-270-1(c)(7), where the Director:

  (1) Prescribes alternative requirements for the regulated unit under Subsection R315-265-90(f), Subsection R315-265-110(d), or both, and

  (2) Determines that it is not necessary to apply the requirements of Sections R315-265-140 through 265-148 because the alternative financial assurance requirements will protect human health and the environment.


R315-265-141. Financial Requirements -- Definitions of Terms as Used in Sections R315-265-140 through R315-265-148
Latest version.

  (a) Closure plan means the plan for closure prepared in accordance with the requirements of Section R315-265-112.

  (b) Current closure cost estimate means the most recent of the estimates prepared in accordance with Subsections R315-265-142(a), (b), and (c).

  (c) Current post-closure cost estimate means the most recent of the estimates prepared in accordance with Subsections R315-265-144(a), (b), and (c).

  (d) Parent corporation means a corporation which directly owns at least 50 percent of the voting stock of the corporation which is the facility owner or operator; the latter corporation is deemed a "subsidiary" of the parent corporation.

  (e) Post-closure plan means the plan for post-closure care prepared in accordance with the requirements of Sections R315-265-117 through 265-120.

  (f) The following terms are used in the specifications for the financial tests for closure, post-closure care, and liability coverage. The definitions are intended to assist in the understanding of these regulations and are not intended to limit the meanings of terms in a way that conflicts with generally accepted accounting practices.

  Assets means all existing and all probable future economic benefits obtained or controlled by a particular entity.

  Current assets means cash or other assets or resources commonly identified as those which are reasonably expected to be realized in cash or sold or consumed during the normal operating cycle of the business.

  Current liabilities means obligations whose liquidation is reasonably expected to require the use of existing resources properly classifiable as current assets or the creation of other current liabilities.

  Current plugging and abandonment cost estimate means the most recent of the estimates prepared in accordance with 40 CFR 144.62(a), (b), and (c).

  Independently audited refers to an audit performed by an independent certified public accountant in accordance with generally accepted auditing standards.

  Liabilities means probable future sacrifices of economic benefits arising from present obligations to transfer assets or provide services to other entities in the future as a result of past transactions or events.

  Net working capital means current assets minus current liabilities.

  Net worth means total assets minus total liabilities and is equivalent to owner's equity.

  Tangible net worth means the tangible assets that remain after deducting liabilities; such assets would not include intangibles such as goodwill and rights to patents or royalties.

  (g) In the liability insurance requirements the terms bodily injury and property damage shall have the meanings given these terms by applicable Utah law. However, these terms do not include those liabilities which, consistent with standard industry practice, are excluded from coverage in liability policies for bodily injury and property damage. The Director intends the meanings of other terms used in the liability insurance requirements to be consistent with their common meanings within the insurance industry. The definitions given below of several of the terms are intended to assist in the understanding of these regulations and are not intended to limit their meanings in a way that conflicts with general insurance industry usage.

  Accidental occurrence means an accident, including continuous or repeated exposure to conditions, which results in bodily injury or property damage neither expected nor intended from the standpoint of the insured.

  Legal defense costs means any expenses that an insurer incurs in defending against claims of third parties brought under the terms and conditions of an insurance policy.

  Nonsudden accidental occurrence means an occurrence which takes place over time and involves continuous or repeated exposure.

  Sudden accidental occurrence means an occurrence which is not continuous or repeated in nature.

  (h) Substantial business relationship means the extent of a business relationship necessary under applicable Utah law to make a guarantee contract issued incident to that relationship valid and enforceable. A "substantial business relationship" must arise from a pattern of recent or ongoing business transactions, in addition to the guarantee itself, such that a currently existing business relationship between the guarantor and the owner or operator is demonstrated to the satisfaction of the Director.


R315-265-142. Financial Requirements -- Cost Estimate for Closure
Latest version.

  (a) The owner or operator shall have a detailed written estimate, in current dollars, of the cost of closing the facility in accordance with the requirements in Sections R315-265-111 through R315-265-115 and applicable closure requirements in Sections R315-265-197, R315-265-228, R315-265-258, and 40 CFR 265.280, 265.310, 265.351, 265.381, 265.404, and 265.1102, which are adopted and incorporated by reference.

  (1) The estimate shall equal the cost of final closure at the point in the facility's active life when the extent and manner of its operation would make closure the most expensive, as indicated by its closure plan, see Subsection R315-265-112(b); and

  (2) The closure cost estimate shall be based on the costs to the owner or operator of hiring a third party to close the facility. A third party is a party who is neither a parent nor a subsidiary of the owner or operator. See definition of parent corporation in Subsection R315-265-141(d). The owner or operator may use costs for on-site disposal if he can demonstrate that on-site disposal capacity will exist at all times over the life of the facility.

  (3) The closure cost estimate may not incorporate any salvage value that may be realized with the sale of hazardous wastes, or non-hazardous wastes if applicable under Subsection R315-265-113(d), facility structures or equipment, land, or other assets associated with the facility at the time of partial or final closure.

  (4) The owner or operator may not incorporate a zero cost for hazardous wastes, or non-hazardous wastes if applicable under Subsection R315-265-113(d), that might have economic value.

  (b) During the active life of the facility, the owner or operator shall adjust the closure cost estimate for inflation within 60 days prior to the anniversary date of the establishment of the financial instrument(s) used to comply with Section R315-265-143. For owners and operators using the financial test or corporate guarantee, the closure cost estimate shall be updated for inflation within 30 days after the close of the firm's fiscal year and before submission of updated information to the Director as specified in Subsection R315-265-143(e)(3). The adjustment may be made by recalculating the closure cost estimate in current dollars, or by using an inflation factor derived from the most recent Implicit Price Deflator for Gross National Product published by the U.S. Department of Commerce in its Survey of Current Business, as specified in Subsections R315-265-142(b)(1) and (2). The inflation factor is the result of dividing the latest published annual Deflator by the Deflator for the previous year.

  (1) The first adjustment is made by multiplying the closure cost estimate by the inflation factor. The result is the adjusted closure cost estimate.

  (2) Subsequent adjustments are made by multiplying the latest adjusted closure cost estimate by the latest inflation factor.

  (c) During the active life of the facility, the owner or operator shall revise the closure cost estimate no later than 30 days after a revision has been made to the closure plan which increases the cost of closure. If the owner or operator has an approved closure plan, the closure cost estimate shall be revised no later than 30 days after the Director has approved the request to modify the closure plan, if the change in the closure plan increases the cost of closure. The revised closure cost estimate shall be adjusted for inflation as specified in Subsection R315-265-142(b).

  (d) The owner or operator shall keep the following at the facility during the operating life of the facility: The latest closure cost estimate prepared in accordance with Subssections R315-265-142(a) and (c) and, when this estimate has been adjusted in accordance with Subsection R315-265-142(b), the latest adjusted closure cost estimate.


R315-265-143. Financial Requirements -- Financial Assurance for Closure
Latest version.

  By the effective date of these regulations, an owner or operator of each facility shall establish financial assurance for closure of the facility. He shall choose from the options as specified in Subsections R315-265-143(a) through (e).

  (a) Closure trust fund.

  (1) An owner or operator may satisfy the requirements of Section R315-265-143 by establishing a closure trust fund which conforms to the requirements of Subsection R315-265-143(a) and submitting an originally signed duplicate of the trust agreement to the Director. The trustee shall be an entity which has the authority to act as a trustee and whose trust operations are regulated and examined by a Federal or Utah agency.

  (2) The wording of the trust agreement shall be identical to the wording specified in Subsection R315-264-151(a)(1), and the trust agreement shall be accompanied by a formal certification of acknowledgment, for example, see Subsection R315-264-151(a)(2). Schedule A of the trust agreement shall be updated within 60 days after a change in the amount of the current closure cost estimate covered by the agreement.

  (3) Payments into the trust fund shall be made annually by the owner or operator over the 20 years beginning with the effective date of these regulations or over the remaining operating life of the facility as estimated in the closure plan, whichever period is shorter; this period is hereafter referred to as the "pay-in period." The payments into the closure trust fund shall be made as follows:

  (i) The first payment shall be made by the effective date of these regulations, except as provided in Subsection R315-265-143(a)(5). The first payment shall be at least equal to the current closure cost estimate, except as provided in Subsection R315-265-143(f), divided by the number of years in the pay-in period.

  (ii) Subsequent payments shall be made no later than 30 days after each anniversary date of the first payment. The amount of each subsequent payment shall be determined by this formula: Next payment=(CE-CV)/Y, where CE is the current closure cost estimate, CV is the current value of the trust fund, and Y is the number of years remaining in the pay-in period.

  (4) The owner or operator may accelerate payments into the trust fund or he may deposit the full amount of the current closure cost estimate at the time the fund is established. However, he shall maintain the value of the fund at no less than the value that the fund would have if annual payments were made as specified in Subsection R315-265-143(a)(3).

  (5) If the owner or operator establishes a closure trust fund after having used one or more alternate mechanisms specified in Section R315-265-143, his first payment shall be in at least the amount that the fund would contain if the trust fund were established initially and annual payments made as specified in Subsection R315-265-143(a)(3).

  (6) After the pay-in period is completed, whenever the current closure cost estimate changes, the owner or operator shall compare the new estimate with the trustee's most recent annual valuation of the trust fund. If the value of the fund is less than the amount of the new estimate, the owner or operator, within 60 days after the change in the cost estimate, shall either deposit an amount into the fund so that its value after this deposit at least equals the amount of the current closure cost estimate, or obtain other financial assurance as specified in Section R315-265-143 to cover the difference.

  (7) If the value of the trust fund is greater than the total amount of the current closure cost estimate, the owner or operator may submit a written request to the Director for release of the amount in excess of the current closure cost estimate.

  (8) If an owner or operator substitutes other financial assurance as specified in Section R315-265-143 for all or part of the trust fund, he may submit a written request to the Director for release of the amount in excess of the current closure cost estimate covered by the trust fund.

  (9) Within 60 days after receiving a request from the owner or operator for release of funds as specified in Subsections R315-265-143(a) (7) or (8), the Director will instruct the trustee to release to the owner or operator such funds as the Director specifies in writing.

  (10) After beginning partial or final closure, an owner or operator or another person authorized to conduct partial or final closure may request reimbursements for partial or final closure expenditures by submitting itemized bills to the Director. The owner or operator may request reimbursements for partial closure only if sufficient funds are remaining in the trust fund to cover the maximum costs of closing the facility over its remaining operating life. No later than 60 days after receiving bills for partial or final closure activities, the Director will instruct the trustee to make reimbursements in those amounts as the Director specifies in writing, if the Director determines that the partial or final closure expenditures are in accordance with the approved closure plan, or otherwise justified. If the Director has reason to believe that the maximum cost of closure over the remaining life of the facility will be significantly greater than the value of the trust fund, he may withhold reimbursements of such amounts as he deems prudent until he determines, in accordance with Subsection R315-265-143(h) that the owner or operator is no longer required to maintain financial assurance for final closure of the facility. If the Director does not instruct the trustee to make such reimbursements, he will provide to the owner or operator a detailed written statement of reasons.

  (11) The Director will agree to termination of the trust when:

  (i) An owner or operator substitutes alternate financial assurance as specified in Section R315-265-143; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-143 in accordance with Subsection R315-265-143(h).

  (b) Surety bond guaranteeing payment into a closure trust fund.

  (1) An owner or operator may satisfy the requirements of Section R315-265-143 by obtaining a surety bond which conforms to the requirements of this paragraph and submitting the bond to the Director. The surety company issuing the bond shall, at a minimum, be among those listed as acceptable sureties on Federal bonds in Circular 570 of the U.S. Department of the Treasury.

  (2) The wording of the surety bond shall be identical to the wording specified in Subsection R315-264-151(b).

  (3) The owner or operator who uses a surety bond to satisfy the requirements of Section R315-265-143 shall also establish a standby trust fund. Under the terms of the bond, all payments made thereunder will be deposited by the surety directly into the standby trust fund in accordance with instructions from the Director. This standby trust fund shall meet the requirements specified in Subsection R315-265-143(a), except that:

  (i) An originally signed duplicate of the trust agreement shall be submitted to the Director with the surety bond; and

  (ii) Until the standby trust fund is funded pursuant to the requirements of Section R315-265-143, the following are not required by these regulations:

  (A) Payments into the trust fund as specified in Subsection R315-265-143(a);

  (B) Updating of Schedule A of the trust agreement, see Subsection R315-264-151(a), to show current closure cost estimates;

  (C) Annual valuations as required by the trust agreement; and

  (D) Notices of nonpayment as required by the trust agreement.

  (4) The bond shall guarantee that the owner or operator will:

  (i) Fund the standby trust fund in an amount equal to the penal sum of the bond before the beginning of final closure of the facility; or

  (ii) Fund the standby trust fund in an amount equal to the penal sum within 15 days after an administrative order to begin final closure issued by the Director becomes final, or within 15 days after an order to begin final closure is issued by a U.S. district court or other court of competent jurisdiction; or

  (iii) Provide alternate financial assurance as specified in Section R315-265-143, and obtain the Director's written approval of the assurance provided, within 90 days after receipt by both the owner or operator and the Director of a notice of cancellation of the bond from the surety.

  (5) Under the terms of the bond, the surety will become liable on the bond obligation when the owner or operator fails to perform as guaranteed by the bond.

  (6) The penal sum of the bond shall be in an amount at least equal to the current closure cost estimate, except as provided in Subsection R315-265-143(f).

  (7) Whenever the current closure cost estimate increases to an amount greater than the penal sum, the owner or operator, within 60 days after the increase, shall either cause the penal sum to be increased to an amount at least equal to the current closure cost estimate and submit evidence of such increase to the Director, or obtain other financial assurance as specified in Section R315-265-143 to cover the increase. Whenever the current closure cost estimate decreases, the penal sum may be reduced to the amount of the current closure cost estimate following written approval by the Director.

  (8) Under the terms of the bond, the surety may cancel the bond by sending notice of cancellation by certified mail to the owner or operator and to the Director. Cancellation may not occur, however, during the 120 days beginning on the date of receipt of the notice of cancellation by both the owner or operator and the Director, as evidenced by the return receipts.

  (9) The owner or operator may cancel the bond if the Director has given prior written consent based on his receipt of evidence of alternate financial assurance as specified in Section R315-265-143.

  (c) Closure letter of credit.

  (1) An owner or operator may satisfy the requirements of Section R315-265-143 by obtaining an irrevocable standby letter of credit which conforms to the requirements of Subsection R315-265-143(c) and submitting the letter to the Director. The issuing institution shall be an entity which has the authority to issue letters of credit and whose letter-of-credit operations are regulated and examined by a Federal or Utah agency.

  (2) The wording of the letter of credit shall be identical to the wording specified in Subsection R315-264-151(d).

  (3) An owner or operator who uses a letter of credit to satisfy the requirements of Section R315-265-143 shall also establish a standby trust fund. Under the terms of the letter of credit, all amounts paid pursuant to a draft by the Director will be deposited by the issuing institution directly into the standby trust fund in accordance with instructions from the Director. This standby trust fund shall meet the requirements of the trust fund specified in Subsection R315-265-143(a), except that:

  (i) An originally signed duplicate of the trust agreement shall be submitted to the Director with the letter of credit; and

  (ii) Unless the standby trust fund is funded pursuant to the requirements of Section R315-265-143, the following are not required by these regulations:

  (A) Payments into the trust fund as specified in Subsection R315-265-143(a);

  (B) Updating of Schedule A of the trust agreement, see Subsection R315-264-151(a), to show current closure cost estimates;

  (C) Annual valuations as required by the trust agreement; and

  (D) Notices of nonpayment as required by the trust agreement.

  (4) The letter of credit shall be accompanied by a letter from the owner or operator referring to the letter of credit by number, issuing institution, and date, and providing the following information: The EPA Identification Number, name, and address of the facility, and the amount of funds assured for closure of the facility by the letter of credit.

  (5) The letter of credit shall be irrevocable and issued for a period of at least 1 year. The letter of credit shall provide that the expiration date will be automatically extended for a period of at least 1 year unless, at least 120 days before the current expiration date, the issuing institution notifies both the owner or operator and the Director by certified mail of a decision not to extend the expiration date. Under the terms of the letter of credit, the 120 days will begin on the date when both the owner or operator and the Director have received the notice, as evidenced by the return receipts.

  (6) The letter of credit shall be issued in an amount at least equal to the current closure cost estimate, except as provided in Subsection R315-265-143(f).

  (7) Whenever the current closure cost estimate increases to an amount greater than the amount of the credit, the owner or operator, within 60 days after the increase, shall either cause the amount of the credit to be increased so that it at least equals the current closure cost estimate and submit evidence of such increase to the Director, or obtain other financial assurance as specified in Section R315-265-143 to cover the increase. Whenever the current closure cost estimate decreases, the amount of the credit may be reduced to the amount of the current closure cost estimate following written approval by the Director.

  (8) Following a final administrative determination that the owner or operator has failed to perform final closure in accordance with the approved closure plan when required to do so, the Director may draw on the letter of credit.

  (9) If the owner or operator does not establish alternate financial assurance as specified in Section R315-265-143 and obtain written approval of such alternate assurance from the Director within 90 days after receipt by both the owner or operator and the Director of a notice from the issuing institution that it has decided not to extend the letter of credit beyond the current expiration date, the Director will draw on the letter of credit. The Director may delay the drawing if the issuing institution grants an extension of the term of the credit. During the last 30 days of any such extension the Director will draw on the letter of credit if the owner or operator has failed to provide alternate financial assurance as specified in Section R315-265-143 and obtain written approval of such assurance from the Director.

  (10) The Director will return the letter of credit to the issuing institution for termination when:

  (i) An owner or operator substitutes alternate financial assurance as specified in Section R315-265-143; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-143 in accordance with Subsection R315-265-143(h).

  (d) Closure insurance.

  (1) An owner or operator may satisfy the requirements of Section R315-265-143 by obtaining closure insurance which conforms to the requirements of Subsection R315-265-143(d) and submitting a certificate of such insurance to the Director. By the effective date of these regulations the owner or operator shall submit to the Director a letter from an insurer stating that the insurer is considering issuance of closure insurance conforming to the requirements of this paragraph to the owner or operator. Within 90 days after the effective date of these regulations, the owner or operator shall submit the certificate of insurance to the Director or establish other financial assurance as specified in Section R315-265-143. At a minimum, the insurer shall be licensed to transact the business of insurance, or eligible to provide insurance as an excess or surplus lines insurer, in one or more States.

  (2) The wording of the certificate of insurance shall be identical to the wording specified in Subsection R315-264-151(e).

  (3) The closure insurance policy shall be issued for a face amount at least equal to the current closure cost estimate, except as provided in Subsection R315-265-143(f). The term "face amount" means the total amount the insurer is obligated to pay under the policy. Actual payments by the insurer will not change the face amount, although the insurer's future liability will be lowered by the amount of the payments.

  (4) The closure insurance policy shall guarantee that funds will be available to close the facility whenever final closure occurs. The policy shall also guarantee that once final closure begins, the insurer will be responsible for paying out funds, up to an amount equal to the face amount of the policy, upon the direction of the Director, to such party or parties as the Director specifies.

  (5) After beginning partial or final closure, an owner or operator or any other person authorized to conduct closure may request reimbursements for closure expenditures by submitting itemized bills to the Director. The owner or operator may request reimbursements for partial closure only if the remaining value of the policy is sufficient to cover the maximum costs of closing the facility over its remaining operating life. Within 60 days after receiving bills for closure activities, the Director will instruct the insurer to make reimbursements in such amounts as the Director specifies in writing if the Director determines that the partial or final closure expenditures are in accordance with the approved closure plan or otherwise justified. If the Director has reason to believe that the maximum cost of closure over the remaining life of the facility will be significantly greater than the face amount of the policy, he may withhold reimbursement of such amounts as he deems prudent until he determines, in accordance with Subsection R315-265-143(h), that the owner or operator is no longer required to maintain financial assurance for final closure of the particular facility. If the Director does not instruct the insurer to make such reimbursements, he will provide to the owner or operator a detailed written statement of reasons.

  (6) The owner or operator shall maintain the policy in full force and effect until the Director consents to termination of the policy by the owner or operator as specified in Subsection R315-265-143(d)(10). Failure to pay the premium, without substitution of alternate financial assurance as specified in this section, will constitute a significant violation of these regulations, warranting such remedy as the Director deems necessary. Such violation will be deemed to begin upon receipt by the Director of a notice of future cancellation, termination, or failure to renew due to nonpayment of the premium, rather than upon the date of expiration.

  (7) Each policy shall contain a provision allowing assignment of the policy to a successor owner or operator. Such assignment may be conditional upon consent of the insurer, provided such consent is not unreasonably refused.

  (8) The policy shall provide that the insurer may not cancel, terminate, or fail to renew the policy except for failure to pay the premium. The automatic renewal of the policy shall, at a minimum, provide the insured with the option of renewal at the face amount of the expiring policy. If there is a failure to pay the premium, the insurer may elect to cancel, terminate, or fail to renew the policy by sending notice by certified mail to the owner or operator and the Director. Cancellation, termination, or failure to renew may not occur, however, during the 120 days beginning with the date of receipt of the notice by both the Director and the owner or operator, as evidenced by the return receipts. Cancellation, termination, or failure to renew may not occur and the policy will remain in full force and effect in the event that on or before the date of expiration:

  (i) The Director deems the facility abandoned; or

  (ii) Interim status is terminated or revoked; or

  (iii) Closure is ordered by the Director or a U.S. district court or other court of competent jurisdiction; or

  (iv) The owner or operator is named as debtor in a voluntary or involuntary proceeding under Title 11 (Bankruptcy), U.S. Code; or

  (v) The premium due is paid.

  (9) Whenever the current closure cost estimate increases to an amount greater than the face amount of the policy, the owner or operator, within 60 days after the increase, shall either cause the face amount to be increased to an amount at least equal to the current closure cost estimate and submit evidence of such increase to the Director, or obtain other financial assurance as specified in Section R315-265-143 to cover the increase. Whenever the current closure cost estimate decreases, the face amount may be reduced to the amount of the current closure cost estimate following written approval by the Director.

  (10) The Director will give written consent to the owner or operator that he may terminate the insurance policy when:

  (i) An owner or operator substitutes alternate financial assurance as specified in Section R315-265-143; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-143 in accordance with Subsection R315-265-143(h).

  (e) Financial test and corporate guarantee for closure.

  (1) An owner or operator may satisfy the requirements of Section R315-265-143 by demonstrating that he passes a financial test as specified in Subsection R315-265-143(e). To pass this test the owner or operator shall meet the criteria of either Subsection R315-265-143(e)(1)(i) or (ii):

  (i) The owner or operator shall have:

  (A) Two of the following three ratios: A ratio of total liabilities to net worth less than 2.0; a ratio of the sum of net income plus depreciation, depletion, and amortization to total liabilities greater than 0.1; and a ratio of current assets to current liabilities greater than 1.5; and

  (B) Net working capital and tangible net worth each at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates; and

  (C) Tangible net worth of at least $10 million; and

  (D) Assets located in the United States amounting to at least 90 percent of total assets or at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates.

  (ii) The owner or operator shall have:

  (A) A current rating for his most recent bond issuance of AAA, AA, A, or BBB as issued by Standard and Poor's or Aaa, Aa, A, or Baa as issued by Moody's; and

  (B) Tangible net worth at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates; and

  (C) Tangible net worth of at least $10 million; and

  (D) Assets located in the United States amounting to at least 90 percent of total assets or at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates.

  (2) The phrase "current closure and post-closure cost estimates" as used in Subsection R315-265-143(e)(1) refers to the cost estimates required to be shown in paragraphs 1-4 of the letter from the owner's or operator's chief financial officer, for example see Subsection R315-264-151(f). The phrase "current plugging and abandonment cost estimates" as used in Subsection R315-265-143(e)(1) refers to the cost estimates required to be shown in paragraphs 1-4 of the letter from the owner's or operator's chief financial officer, for example see 40 CFR 144.70(f).

  (3) To demonstrate that he meets this test, the owner or operator shall submit the following items to the Director:

  (i) A letter signed by the owner's or operator's chief financial officer and worded as specified in Subsection R314-264-151(f); and

  (ii) A copy of the independent certified public accountant's report on examination of the owner's or operator's financial statements for the latest completed fiscal year; and

  (iii) A special report from the owner's or operator's independent certified public accountant to the owner or operator stating that:

  (A) He has compared the data which the letter from the chief financial officer specifies as having been derived from the independently audited, year-end financial statements for the latest fiscal year with the amounts in such financial statements; and

  (B) In connection with that procedure, no matters came to his attention which caused him to believe that the specified data should be adjusted.

  (4) The owner or operator may obtain an extension of the time allowed for submission of the documents specified in Subsection R315-265-143(e)(3) if the fiscal year of the owner or operator ends during the 90 days prior to the effective date of these regulations and if the year-end financial statements for that fiscal year will be audited by an independent certified public accountant. The extension will end no later than 90 days after the end of the owner's or operator's fiscal year. To obtain the extension, the owner's or operator's chief financial officer shall send, by the effective date of these regulations, a letter to the Director. This letter from the chief financial officer shall:

  (i) Request the extension;

  (ii) Certify that he has grounds to believe that the owner or operator meets the criteria of the financial test;

  (iii) Specify for each facility to be covered by the test the EPA Identification Number, name, address, and current closure and post-closure cost estimates to be covered by the test;

  (iv) Specify the date ending the owner's or operator's last complete fiscal year before the effective date of these regulations;

  (v) Specify the date, no later than 90 days after the end of such fiscal year, when he will submit the documents specified in Subsection R315-265-143(e)(3); and

  (vi) Certify that the year-end financial statements of the owner or operator for such fiscal year will be audited by an independent certified public accountant.

  (5) After the initial submission of items specified in Subsection R315-265-143(e)(3), the owner or operator shall send updated information to the Director within 90 days after the close of each succeeding fiscal year. This information shall consist of all three items specified in Subsection R315-265-143(e)(3).

  (6) If the owner or operator no longer meets the requirements of Subsection R315-265-143(e)(1), he shall send notice to the Director of intent to establish alternate financial assurance as specified in this section. The notice shall be sent by certified mail within 90 days after the end of the fiscal year for which the year-end financial data show that the owner or operator no longer meets the requirements. The owner or operator shall provide the alternate financial assurance within 120 days after the end of such fiscal year.

  (7) The Director may, based on a reasonable belief that the owner or operator may no longer meet the requirements of Subsection R315-265-143(e)(1), require reports of financial condition at any time from the owner or operator in addition to those specified in Subsection R315-265-143(e)(3). If the Director finds, on the basis of such reports or other information, that the owner or operator no longer meets the requirements of Subsection R315-265-143(e)(1), the owner or operator shall provide alternate financial assurance as specified in Section R315-265-143 within 30 days after notification of such a finding.

  (8) The Director may disallow use of this test on the basis of qualifications in the opinion expressed by the independent certified public accountant in his report on examination of the owner's or operator's financial statements, see Subsection R315-265-143(e)(3)(ii). An adverse opinion or a disclaimer of opinion will be cause for disallowance. The Director will evaluate other qualifications on an individual basis. The owner or operator shall provide alternate financial assurance as specified in this section within 30 days after notification of the disallowance.

  (9) The owner or operator is no longer required to submit the items specified in Subsection R315-265-143(e)(3) when:

  (i) An owner or operator substitutes alternate financial assurance as specified in Section R315-265-143; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-143 in accordance with Subsection R315-265-143(h).

  (10) An owner or operator may meet the requirements of Section R315-265-143 by obtaining a written guarantee. The guarantor shall be the direct or higher-tier parent corporation of the owner or operator, a firm whose parent corporation is also the parent corporation of the owner or operator, or a firm with a "substantial business relationship" with the owner or operator. The guarantor shall meet the requirements for owners or operators in Subsections R315-265-143(e)(1) through (8) and shall comply with the terms of the guarantee. The wording of the guarantee shall be identical to the wording specified in Subsection R315-264-151(h). A certified copy of the guarantee shall accompany the items sent to the Director as specified in Subsection R315-265-143(e)(3). One of these items shall be the letter from the guarantor's chief financial officer. If the guarantor's parent corporation is also the parent corporation of the owner or operator, the letter shall describe the value received in consideration of the guarantee. If the guarantor is a firm with a "substantial business relationship" with the owner or operator, this letter shall describe this "substantial business relationship" and the value received in consideration of the guarantee. The terms of the guarantee shall provide that:

  (i) If the owner or operator fails to perform final closure of a facility covered by the corporate guarantee in accordance with the closure plan and other interim status requirements whenever required to do so, the guarantor will do so or establish a trust fund as specified in Subsection R315-265-143(a) in the name of the owner or operator.

  (ii) The corporate guarantee will remain in force unless the guarantor sends notice of cancellation by certified mail to the owner or operator and to the Director. Cancellation may not occur, however, during the 120 days beginning on the date of receipt of the notice of cancellation by both the owner or operator and the Director, as evidenced by the return receipts.

  (iii) If the owner or operator fails to provide alternate financial assurance as specified in Section R315-265-143 and obtain the written approval of such alternate assurance from the Director within 90 days after receipt by both the owner or operator and the Director of a notice of cancellation of the corporate guarantee from the guarantor, the guarantor will provide such alternate financial assurance in the name of the owner or operator.

  (f) Use of multiple financial mechanisms. An owner or operator may satisfy the requirements of Section R315-265-143 by establishing more than one financial mechanism per facility. These mechanisms are limited to trust funds, surety bonds, letters of credit, and insurance. The mechanisms shall be as specified in Subsections R315-265-143(a) through (d), respectively, except that it is the combination of mechanisms, rather than the single mechanism, which shall provide financial assurance for an amount at least equal to the current closure cost estimate. If an owner or operator uses a trust fund in combination with a surety bond or a letter of credit, he may use the trust fund as the standby trust fund for the other mechanisms. A single standby trust fund may be established for two or more mechanisms. The Director may use any or all of the mechanisms to provide for closure of the facility.

  (g) Use of a financial mechanism for multiple facilities. An owner or operator may use a financial assurance mechanism specified in Section R315-265-143 to meet the requirements of Section R315-265-143 for more than one facility. Evidence of financial assurance submitted to the Director shall include a list showing, for each facility, the EPA Identification Number, name, address, and the amount of funds for closure assured by the mechanism. The amount of funds available through the mechanism shall be no less than the sum of funds that would be available if a separate mechanism had been established and maintained for each facility. In directing funds available through the mechanism for closure of any of the facilities covered by the mechanism, the Director may direct only the amount of funds designated for that facility, unless the owner or operator agrees to the use of additional funds available under the mechanism.

  (h) Release of the owner or operator from the requirements of Section R315-265-143. Within 60 days after receiving certifications from the owner or operator and a qualified Professional Engineer that final closure has been completed in accordance with the approved closure plan, the Director will notify the owner or operator in writing that he is no longer required by Section R315-265-143 to maintain financial assurance for final closure of the facility, unless the Director has reason to believe that final closure has not been in accordance with the approved closure plan. The Director shall provide the owner or operator a detailed written statement of any such reason to believe that closure has not been in accordance with the approved closure plan.


R315-265-144. Financial Requirements -- Cost Estimate for Post-Closure Care
Latest version.

  (a) The owner or operator of a hazardous waste disposal unit shall have a detailed written estimate, in current dollars, of the annual cost of post-closure monitoring and maintenance of the facility in accordance with the applicable post-closure regulations in Sections R315-265-117 through R315-265-120, R315-265-228, R315-265-258, and 40 CFR 265.280 and 265.310, which are adopted and incorporated by reference.

  (1) The post-closure cost estimate shall be based on the costs to the owner or operator of hiring a third party to conduct post-closure care activities. A third party is a party who is neither a parent nor subsidiary of the owner or operator. See definition of parent corporation in Subsection R315-265-141(d).

  (2) The post-closure cost estimate is calculated by multiplying the annual post-closure cost estimate by the number of years of post-closure care required under Section R315-265-117.

  (b) During the active life of the facility, the owner or operator shall adjust the post-closure cost estimate for inflation within 60 days prior to the anniversary date of the establishment of the financial instrument(s) used to comply with Section R315-265-145. For owners or operators using the financial test or corporate guarantee, the post-closure care cost estimate shall be updated for inflation no later than 30 days after the close of the firm's fiscal year and before submission of updated information to the Director as specified in Subsection R315-265-145(d)(5). The adjustment may be made by recalculating the post-closure cost estimate in current dollars or by using an inflation factor derived from the most recent Implicit Price Deflator for Gross National Product published by the U.S. Department of Commerce in its Survey of Current Business as specified in Subsections R315-265-145(b)(1) and (2). The inflation factor is the result of dividing the latest published annual Deflator by the Deflator for the previous year.

  (1) The first adjustment is made by multiplying the post-closure cost estimate by the inflation factor. The result is the adjusted post-closure cost estimate.

  (2) Subsequent adjustments are made by multiplying the latest adjusted post-closure cost estimate by the latest inflation factor.

  (c) During the active life of the facility, the owner or operator shall revise the post-closure cost estimate no later than 30 days after a revision to the post-closure plan which increases the cost of post-closure care. If the owner or operator has an approved post-closure plan, the post-closure cost estimate shall be revised no later than 30 days after the Director has approved the request to modify the plan, if the change in the post-closure plan increases the cost of post-closure care. The revised post-closure cost estimate shall be adjusted for inflation as specified in Subsection R315-265-144(b).

  (d) The owner or operator shall keep the following at the facility during the operating life of the facility: the latest post-closure cost estimate prepared in accordance with Subsections R315-265-144(a) and (c) and, when this estimate has been adjusted in accordance with Subsection R315-265-144(b), the latest adjusted post-closure cost estimate.


R315-265-145. Financial Requirements -- Financial Assurance for Post-Closure Care
Latest version.

  By the effective date of these regulations, an owner or operator of a facility with a hazardous waste disposal unit must establish financial assurance for post-closure care of the disposal unit(s).

  (a) Post-closure trust fund.

  (1) An owner or operator may satisfy the requirements of Section R315-265-145 by establishing a post-closure trust fund which conforms to the requirements of Subsection R315-265-145(a) and submitting an originally signed duplicate of the trust agreement to the Director. The trustee shall be an entity which has the authority to act as a trustee and whose trust operations are regulated and examined by a Federal or Utah agency.

  (2) The wording of the trust agreement shall be identical to the wording specified in Subsection R315-264-151(a)(1), and the trust agreement shall be accompanied by a formal certification of acknowledgment, for example see Subsection R315-264-151(a)(2). Schedule A of the trust agreement shall be updated within 60 days after a change in the amount of the current post-closure cost estimate covered by the agreement.

  (3) Payments into the trust fund shall be made annually by the owner or operator over the 20 years beginning with the effective date of these regulations or over the remaining operating life of the facility as estimated in the closure plan, whichever period is shorter; this period is hereafter referred to as the "pay-in period." The payments into the post-closure trust fund shall be made as follows:

  (i) The first payment shall be made by the effective date of these regulations, except as provided in Subsection R315-265-145(a)(5). The first payment shall be at least equal to the current post-closure cost estimate, except as provided in Subsection R315-265-145(f), divided by the number of years in the pay-in period.

  (ii) Subsequent payments shall be made no later than 30 days after each anniversary date of the first payment. The amount of each subsequent payment must be determined by this formula: Next payment = (CE-CV)/Y, where CE is the current post-closure cost estimate, CV is the current value of the trust fund, and Y is the number of years remaining in the pay-in period.

  (4) The owner or operator may accelerate payments into the trust fund or he may deposit the full amount of the current post-closure cost estimate at the time the fund is established. However, he shall maintain the value of the fund at no less than the value that the fund would have if annual payments were made as specified in Subsection R315-265-145(a)(3).

  (5) If the owner or operator establishes a post-closure trust fund after having used one or more alternate mechanisms specified in this section, his first payment shall be in at least the amount that the fund would contain if the trust fund were established initially and annual payments made as specified in Subsection R315-265-145 (a)(3).

  (6) After the pay-in period is completed, whenever the current post-closure cost estimate changes during the operating life of the facility, the owner or operator shall compare the new estimate with the trustee's most recent annual valuation of the trust fund. If the value of the fund is less than the amount of the new estimate, the owner or operator, within 60 days after the change in the cost estimate, shall either deposit an amount into the fund so that its value after this deposit at least equals the amount of the current post-closure cost estimate, or obtain other financial assurance as specified in Section R315-265-145 to cover the difference.

  (7) During the operating life of the facility, if the value of the trust fund is greater than the total amount of the current post-closure cost estimate, the owner or operator may submit a written request to the Director for release of the amount in excess of the current post-closure cost estimate.

  (8) If an owner or operator substitutes other financial assurance as specified in this section for all or part of the trust fund, he may submit a written request to the Director for release of the amount in excess of the current post-closure cost estimate covered by the trust fund.

  (9) Within 60 days after receiving a request from the owner or operator for release of funds as specified in Subsections R315-265-145(a) (7) or (8), the Director will instruct the trustee to release to the owner or operator such funds as the Director specifies in writing.

  (10) During the period of post-closure care, the Director may approve a release of funds if the owner or operator demonstrates to the Director that the value of the trust fund exceeds the remaining cost of post-closure care.

  (11) An owner or operator or any other person authorized to conduct post-closure care may request reimbursements for post-closure expenditures by submitting itemized bills to the Director. Within 60 days after receiving bills for post-closure care activities, the Director will instruct the trustee to make reimbursements in those amounts as the Director specifies in writing, if the Director determines that the post-closure expenditures are in accordance with the approved post-closure plan or otherwise justified. If the Director does not instruct the trustee to make such reimbursements, he will provide the owner or operator with a detailed written statement of reasons.

  (12) The Director will agree to termination of the trust when:

  (i) An owner or operator substitutes alternate financial assurance as specified in this section; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-145 in accordance with Subsection R315-265-145(h).

  (b) Surety bond guaranteeing payment into a post-closure trust fund.

  (1) An owner or operator may satisfy the requirements of Section R315-265-145 by obtaining a surety bond which conforms to the requirements of Subsection R315-265-145(b) and submitting the bond to the Director. The surety company issuing the bond must, at a minimum, be among those listed as acceptable sureties on Federal bonds in Circular 570 of the U.S. Department of the Treasury.

  (2) The wording of the surety bond must be identical to the wording specified in Subsection R315-264-151(b).

  (3) The owner or operator who uses a surety bond to satisfy the requirements of this section shall also establish a standby trust fund. Under the terms of the bond, all payments made thereunder will be deposited by the surety directly into the standby trust fund in accordance with instructions from the Director. This standby trust fund shall meet the requirements specified in Subsection R315-265-145(a), except that:

  (i) An originally signed duplicate of the trust agreement shall be submitted to the Director with the surety bond; and

  (ii) Until the standby trust fund is funded pursuant to the requirements of Section R315-265-145, the following are not required by these regulations:

  (A) Payments into the trust fund as specified in Subsection R315-265-145(a);

  (B) Updating of Schedule A of the trust agreement, see Subsection R315-264-151(a), to show current post-closure cost estimates;

  (C) Annual valuations as required by the trust agreement; and

  (D) Notices of nonpayment as required by the trust agreement.

  (4) The bond shall guarantee that the owner or operator will:

  (i) Fund the standby trust fund in an amount equal to the penal sum of the bond before the beginning of final closure of the facility; or

  (ii) Fund the standby trust fund in an amount equal to the penal sum within 15 days after an administrative order to begin final closure issued by the Director becomes final, or within 15 days after an order to begin final closure is issued by a U.S. district court or other court of competent jurisdiction; or

  (iii) Provide alternate financial assurance as specified in Section R315-265-145, and obtain the Director's written approval of the assurance provided, within 90 days after receipt by both the owner or operator and the Director of a notice of cancellation of the bond from the surety.

  (5) Under the terms of the bond, the surety will become liable on the bond obligation when the owner or operator fails to perform as guaranteed by the bond.

  (6) The penal sum of the bond shall be in an amount at least equal to the current post-closure cost estimate, except as provided in Subsection R315-265-145(f).

  (7) Whenever the current post-closure cost estimate increases to an amount greater than the penal sum, the owner or operator, within 60 days after the increase, shall either cause the penal sum to be increased to an amount at least equal to the current post-closure cost estimate and submit evidence of such increase to the Director, or obtain other financial assurance as specified in Section R315-265-145 to cover the increase. Whenever the current post-closure cost estimate decreases, the penal sum may be reduced to the amount of the current post-closure cost estimate following written approval by the Director.

  (8) Under the terms of the bond, the surety may cancel the bond by sending notice of cancellation by certified mail to the owner or operator and to the Director. Cancellation may not occur, however, during the 120 days beginning on the date of receipt of the notice of cancellation by both the owner or operator and the Director, as evidenced by the return receipts.

  (9) The owner or operator may cancel the bond if the Director has given prior written consent based on his receipt of evidence of alternate financial assurance as specified in Section R315-265-145.

  (c) Post-closure letter of credit.

  (1) An owner or operator may satisfy the requirements of Section R315-265-145 by obtaining an irrevocable standby letter of credit which conforms to the requirements of Subsection R315-265-145(c) and submitting the letter to the Director. The issuing institution shall be an entity which has the authority to issue letters of credit and whose letter-of-credit operations are regulated and examined by a Federal or Utah agency.

  (2) The wording of the letter of credit shall be identical to the wording specified in Subsection R315-264-151(d).

  (3) An owner or operator who uses a letter of credit to satisfy the requirements of this section shall also establish a standby trust fund. Under the terms of the letter of credit, all amounts paid pursuant to a draft by the Director will be deposited by the issuing institution directly into the standby trust fund in accordance with instructions from the Director. This standby trust fund must meet the requirements of the trust fund specified in Subsection R315-265-145(a), except that:

  (i) An originally signed duplicate of the trust agreement shall be submitted to the Director with the letter of credit; and

  (ii) Unless the standby trust fund is funded pursuant to the requirements of Section R315-265-145, the following are not required by these regulations:

  (A) Payments into the trust fund as specified in Subsection R315-265-145(a);

  (B) Updating of Schedule A of the trust agreement, see Subsection R315-264-151(a), to show current post-closure cost estimates;

  (C) Annual valuations as required by the trust agreement; and

  (D) Notices of nonpayment as required by the trust agreement.

  4) The letter of credit shall be accompanied by a letter from the owner or operator referring to the letter of credit by number, issuing institution, and date, and providing the following information: The EPA Identification Number, name, and address of the facility, and the amount of funds assured for post-closure care of the facility by the letter of credit.

  (5) The letter of credit shall be irrevocable and issued for a period of at least one year. The letter of credit shall provide that the expiration date will be automatically extended for a period of at least one year unless, at least 120 days before the current expiration date, the issuing institution notifies both the owner or operator and the Director by certified mail of a decision not to extend the expiration date. Under the terms of the letter of credit, the 120 days will begin on the date when both the owner or operator and the Director have received the notice, as evidenced by the return receipts.

  (6) The letter of credit shall be issued in an amount at least equal to the current post-closure cost estimate, except as provided in Subsection R315-265-145(f).

  (7) Whenever the current post-closure cost estimate increases to an amount greater than the amount of the credit during the operating life of the facility, the owner or operator, within 60 days after the increase, shall either cause the amount of the credit to be increased so that it at least equals the current post-closure cost estimate and submit evidence of such increase to the Director, or obtain other financial assurance as specified in Section R315-265-145 to cover the increase. Whenever the current post-closure cost estimate decreases during the operating life of the facility, the amount of the credit may be reduced to the amount of the current post-closure cost estimate following written approval by the Director.

  (8) During the period of post-closure care, the Director may approve a decrease in the amount of the letter of credit if the owner or operator demonstrates to the Director that the amount exceeds the remaining cost of post-closure care.

  (9) Following a final administrative determination that the owner or operator has failed to perform post-closure care in accordance with the approved post-closure plan and other permit requirements, the Director may draw on the letter of credit.

  (10) If the owner or operator does not establish alternate financial assurance as specified in Section R315-265-145 and obtain written approval of such alternate assurance from the Director within 90 days after receipt by both the owner or operator and the Director of a notice from the issuing institution that it has decided not to extend the letter of credit beyond the current expiration date, the Director will draw on the letter of credit. The Director may delay the drawing if the issuing institution grants an extension of the term of the credit. During the last 30 days of any such extension the Director will draw on the letter of credit if the owner or operator has failed to provide alternate financial assurance as specified in Section R315-265-145 and obtain written approval of such assurance from the Director.

  (11) The Director will return the letter of credit to the issuing institution for termination when:

  (i) An owner or operator substitutes alternate financial assurance as specified in Section R315-265-145; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-145 in accordance with Subsection R315-265-145(h).

  (d) Post-closure insurance.

  (1) An owner or operator may satisfy the requirements of Section R315-265-145 by obtaining post-closure insurance which conforms to the requirements of Subsection R315-265-145(d) and submitting a certificate of such insurance to the Director. By the effective date of these regulations the owner or operator shall submit to the Director a letter from an insurer stating that the insurer is considering issuance of post- closure insurance conforming to the requirements of Subsection R315-265-145(d) to the owner or operator. Within 90 days after the effective date of these regulations, the owner or operator shall submit the certificate of insurance to the Director or establish other financial assurance as specified in Section R315-265-145. At a minimum, the insurer shall be licensed to transact the business of insurance, or eligible to provide insurance as an excess or surplus lines insurer, in one or more States.

  (2) The wording of the certificate of insurance shall be identical to the wording specified in Subsection R315-264-151(e).

  (3) The post-closure insurance policy shall be issued for a face amount at least equal to the current post-closure cost estimate, except as provided in Subsection R315-265-145(f). The term "face amount" means the total amount the insurer is obligated to pay under the policy. Actual payments by the insurer will not change the face amount, although the insurer's future liability will be lowered by the amount of the payments.

  (4) The post-closure insurance policy shall guarantee that funds will be available to provide post-closure care of the facility whenever the post-closure period begins. The policy shall also guarantee that once post-closure care begins the insurer will be responsible for paying out funds, up to an amount equal to the face amount of the policy, upon the direction of the Director, to such party or parties as the Director specifies.

  (5) An owner or operator or any other person authorized to perform post-closure care may request reimbursement for post-closure care expenditures by submitting itemized bills to the Director. Within 60 days after receiving bills for post-closure care activities, the Director will instruct the insurer to make reimbursements in those amounts as the Director specifies in writing, if the Director determines that the post-closure expenditures are in accordance with the approved post-closure plan or otherwise justified. If the Director does not instruct the insurer to make such reimbursements, he will provide a detailed written statement of reasons.

  (6) The owner or operator shall maintain the policy in full force and effect until the Director consents to termination of the policy by the owner or operator as specified in Subsection R315-265-145(d)(11). Failure to pay the premium, without substitution of alternate financial assurance as specified in the section, will constitute a significant violation of these regulations, warranting such remedy as the Director deems necessary. Such violation will be deemed to begin upon receipt by the Director of a notice of future cancellation, termination, or failure to renew due to nonpayment of the premium, rather than upon the date of expiration.

  (7) Each policy shall contain a provision allowing assignment of the policy to a successor owner or operator. Such assignment may be conditional upon consent of the insurer, provided such consent is not unreasonably refused.

  (8) The policy shall provide that the insurer may not cancel, terminate, or fail to renew the policy except for failure to pay the premium. The automatic renewal of the policy must, at a minimum, provide the insured with the option of renewal at the face amount of the expiring policy. If there is a failure to pay the premium, the insurer may elect to cancel, terminate, or fail to renew the policy by sending notice by certified mail to the owner or operator and the Director. Cancellation, termination, or failure to renew may not occur, however, during the 120 days beginning with the date of receipt of the notice by both the Director and the owner or operator, as evidenced by the return receipts. Cancellation, termination, or failure to renew may not occur and the policy will remain in full force and effect in the event that on or before the date of expiration:

  (i) The Director deems the facility abandoned; or

  (ii) Interim status is terminated or revoked; or

  (iii) Closure is ordered by the Director or a U.S. district court or other court of competent jurisdiction; or

  (iv) The owner or operator is named as debtor in a voluntary or involuntary proceeding under Title 11 (Bankruptcy), U.S. Code; or

  (v) The premium due is paid.

  (9) Whenever the current post-closure cost estimate increases to an amount greater than the face amount of the policy during the operating life of the facility, the owner or operator, within 60 days after the increase, shall either cause the face amount to be increased to an amount at least equal to the current post-closure cost estimate and submit evidence of such increase to the Director, or obtain other financial assurance as specified in Section R315-265-145 to cover the increase. Whenever the current post-closure cost estimate decreases during the operating life of the facility, the face amount may be reduced to the amount of the current post-closure cost estimate following written approval by the Director.

  (10) Commencing on the date that liability to make payments pursuant to the policy accrues, the insurer will thereafter annually increase the face amount of the policy. Such increase shall be equivalent to the face amounts of the policy, less any payments made, multiplied by an amount equivalent to 85 percent of the most recent investment rate or of the equivalent coupon-issue yield announced by the U.S. Treasury for 26-week Treasury securities.

  (11) The Director will give written consent to the owner or operator that he may terminate the insurance policy when:

  (i) An owner or operator substitutes alternate financial assurance as specified in Section R315-265-145; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-145 in accordance with Subsection R315-265-145(h).

  (e) Financial test and corporate guarantee for post-closure care.

  (1) An owner or operator may satisfy the requirements of Section R315-265-145 by demonstrating that he passes a financial test as specified in Subsection R315-265-145(e). To pass this test the owner or operator shall meet the criteria either of Subsections R315-265-145(e)(1)(i) or (ii):

  (i) The owner or operator shall have:

  (A) Two of the following three ratios: a ratio of total liabilities to net worth less than 2.0; a ratio of the sum of net income plus depreciation, depletion, and amortization to total liabilities greater than 0.1; and a ratio of current assets to current liabilities greater than 1.5; and

  (B) Net working capital and tangible net worth each at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates; and

  (C) Tangible net worth of at least $10 million; and

  (D) Assets in the United States amounting to at least 90 percent of his total assets or at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates.

  (ii) The owner or operator shall have:

  (A) A current rating for his most recent bond issuance of AAA, AA, A, or BBB as issued by Standard and Poor's or Aaa, Aa, A, or Baa as issued by Moody's; and

  (B) Tangible net worth at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates; and

  (C) Tangible net worth of at least $10 million; and

  (D) Assets located in the United States amounting to at least 90 percent of his total assets or at least six times the sum of the current closure and post-closure cost estimates and the current plugging and abandonment cost estimates.

  (2) The phrase "current closure and post-closure cost estimates" as used in Subsection R315-265-145(e)(1) refers to the cost estimates required to be shown in paragraphs 1-4 of the letter from the owner's or operator's chief financial officer, for example see Subsection R315-264-151(f). The phrase "current plugging and abandonment cost estimates" as used in Subsection R315-265-145(e)(1) refers to the cost estimates required to be shown in paragraphs 1-4 of the letter from the owner's or operator's chief financial officer, for example see 40 CFR 144.70(f).

  (3) To demonstrate that he meets this test, the owner or operator shall submit the following items to the Director:

  (i) A letter signed by the owner's or operator's chief financial officer and worded as specified in Subsection R315-264-151(f); and

  (ii) A copy of the independent certified public accountant's report on examination of the owner's or operator's financial statements for the latest completed fiscal year; and

  (iii) A special report from the owner's or operator's independent certified public accountant to the owner or operator stating that:

  (A) He has compared the data which the letter from the chief financial officer specifies as having been derived from the independently audited, year-end financial statements for the latest fiscal year with the amounts in such financial statements; and

  (B) In connection with that procedure, no matters came to his attention which caused him to believe that the specified data should be adjusted.

  (4) The owner or operator may obtain an extension of the time allowed for submission of the documents specified in Subsection R315-265-145(e)(3) if the fiscal year of the owner or operator ends during the 90 days prior to the effective date of these regulations and if the year-end financial statements for that fiscal year will be audited by an independent certified public accountant. The extension will end no later than 90 days after the end of the owner's or operator's fiscal year. To obtain the extension, the owner's or operator's chief financial officer shall send, by the effective date of these regulations, a letter to the Director. This letter from the chief financial officer shall:

  (i) Request the extension;

  (ii) Certify that he has grounds to believe that the owner or operator meets the criteria of the financial test;

  (iii) Specify for each facility to be covered by the test the EPA Identification Number, name, address, and the current closure and post-closure cost estimates to be covered by the test;

  (iv) Specify the date ending the owner's or operator's latest complete fiscal year before the effective date of these regulations;

  (v) Specify the date, no later than 90 days after the end of such fiscal year, when he will submit the documents specified in Subsection R315-265-145(e)(3); and

  (vi) Certify that the year-end financial statements of the owner or operator for such fiscal year will be audited by an independent certified public accountant.

  (5) After the initial submission of items specified in Subsection R315-265-145(e)(3), the owner or operator shall send updated information to the Director within 90 days after the close of each succeeding fiscal year. This information must consist of all three items specified in Subsection R315-265-145(e)(3).

  (6) If the owner or operator no longer meets the requirements of Subsection R315-265-145 (e)(1), he shall send notice to the Director of intent to establish alternate financial assurance as specified in Section R315-265-145. The notice shall be sent by certified mail within 90 days after the end of the fiscal year for which the year-end financial data show that the owner or operator no longer meets the requirements. The owner or operator shall provide the alternate financial assurance within 120 days after the end of such fiscal year.

  (7) The Director may, based on a reasonable belief that the owner or operator may no longer meet the requirements of Subsection R315-265-145(e)(1), require reports of financial condition at any time from the owner or operator in addition to those specified in Subsection R315-265-145(e)(3). If the Director finds, on the basis of such reports or other information, that the owner or operator no longer meets the requirements of Subsection R315-265-145(e)(1), the owner or operator shall provide alternate financial assurance as specified in Section R315-265-145 within 30 days after notification of such a finding.

  (8) The Director may disallow use of this test on the basis of qualifications in the opinion expressed by the independent certified public accountant in his report on examination of the owner's or operator's financial statements, see Subsection R315-265-145(e)(3)(ii). An adverse opinion or a disclaimer of opinion will be cause for disallowance. The Director will evaluate other qualifications on an individual basis. The owner or operator shall provide alternate financial assurance as specified in Section R315-265-145 within 30 days after notification of the disallowance.

  (9) During the period of post-closure care, the Director may approve a decrease in the current post-closure cost estimate for which this test demonstrates financial assurance if the owner or operator demonstrates to the Director that the amount of the cost estimate exceeds the remaining cost of post-closure care.

  (10) The owner or operator is no longer required to submit the items specified in Subsection R315-265-145(e)(3) when:

  (i) An owner or operator substitutes alternate financial assurance as specified in Section R315-265-145; or

  (ii) The Director releases the owner or operator from the requirements of Section R315-265-145 in accordance with Subsection R315-265-145(h).

  (11) An owner or operator may meet the requirements of Section R315-265-145 by obtaining a written guarantee. The guarantor shall be the direct or higher-tier parent corporation of the owner or operator, a firm whose parent corporation is also the parent corporation of the owner or operator, or a firm with a "substantial business relationship" with the owner or operator. The guarantor shall meet the requirements for owners or operators in Subsections R315-265-145(e)(1) through (9) and shall comply with the terms of the guarantee. The wording of the guarantee shall be identical to the wording specified in Subsection R315-264-151(h). A certified copy of the guarantee shall accompany the items sent to the Director as specified in Subsection R315-265-145(e)(3). One of these items shall be the letter from the guarantor's chief financial officer. If the guarantor's parent corporation is also the parent corporation of the owner or operator, the letter shall describe the value received in consideration of the guarantee. If the guarantor is a firm with a "substantial business relationship" with the owner or operator, this letter shall describe this "substantial business relationship" and the value received in consideration of the guarantee. The terms of the guarantee must provide that:

  (i) If the owner or operator fails to perform post-closure care of a facility covered by the corporate guarantee in accordance with the post-closure plan and other interim status requirements whenever required to do so, the guarantor will do so or establish a trust fund as specified in Subsection R315-265-145(a) in the name of the owner or operator.

  (ii) The corporate guarantee will remain in force unless the guarantor sends notice of cancellation by certified mail to the owner or operator and to the Director. Cancellation may not occur, however, during the 120 days beginning on the date of receipt of the notice of cancellation by both the owner or operator and the Director, as evidenced by the return receipts.

  (iii) If the owner or operator fails to provide alternate financial assurance as specified in Section R315-265-145 and obtain the written approval of such alternate assurance from the Director within 90 days after receipt by both the owner or operator and the Director of a notice of cancellation of the corporate guarantee from the guarantor, the guarantor will provide such alternate financial assurance in the name of the owner or operator.

  (f) Use of multiple financial mechanisms. An owner or operator may satisfy the requirements of Section R315-265-145 by establishing more than one financial mechanism per facility. These mechanisms are limited to trust funds, surety bonds, letters of credit, and insurance. The mechanisms must be as specified in Subsections R315-265-145(a) through (d), respectively, of this section, except that it is the combination of mechanisms, rather than the single mechanism, which shall provide financial assurance for an amount at least equal to the current post-closure cost estimate. If an owner or operator uses a trust fund in combination with a surety bond or a letter of credit, he may use the trust fund as the standby trust fund for the other mechanisms. A single standby trust fund may be established for two or more mechanisms. The Director may use any or all of the mechanisms to provide for post-closure care of the facility.

  (g) Use of a financial mechanism for multiple facilities. An owner or operator may use a financial assurance mechanism specified in Section R315-265-145 to meet the requirements of Section R315-265-145 for more than one facility. Evidence of financial assurance submitted to the Director shall include a list showing, for each facility, the EPA Identification Number, name, address, and the amount of funds for post-closure care assured by the mechanism. The amount of funds available through the mechanism shall be no less than the sum of funds that would be available if a separate mechanism had been established and maintained for each facility. In directing funds available through the mechanism for post-closure care of any of the facilities covered by the mechanism, the Director may direct only the amount of funds designated for that facility, unless the owner or operator agrees to the use of additional funds available under the mechanism.

  (h) Release of the owner or operator from the requirements of Section R315-265-145. Within 60 days after receiving certifications from the owner or operator and a qualified Professional Engineer that the post-closure care period has been completed for a hazardous waste disposal unit in accordance with the approved plan, the Director will notify the owner or operator in writing that he is no longer required to maintain financial assurance for post-closure care of that unit, unless the Director has reason to believe that post-closure care has not been in accordance with the approved post-closure plan. The Director shall provide the owner or operator a detailed written statement of any such reason to believe that post-closure care has not been in accordance with the approved post-closure plan.


R315-265-146. Financial Requirements -- Use of a Mechansim for Financial Assurance of Both Closure and Post-Closure Care
Latest version.

  An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or more facilities by using a trust fund, surety bond, letter of credit, insurance, financial test, or corporate guarantee that meets the specifications for the mechanism in both Sections R315-265-143 and R315-265-145. The amount of funds available through the mechanism shall be no less than the sum of funds that would be available if a separate mechanism had been established and maintained for financial assurance of closure and of post-closure care.


R315-265-147. Financial Requirements -- Liability Requirements
Latest version.

  (a) Coverage for sudden accidental occurrences. An owner or operator of a hazardous waste treatment, storage, or disposal facility, or a group of such facilities, shall demonstrate financial responsibility for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the facility or group of facilities. The owner or operator shall have and maintain liability coverage for sudden accidental occurrences in the amount of at least $1 million per occurrence with an annual aggregate of at least $2 million, exclusive of legal defense costs. This liability coverage may be demonstrated as specified in Subsections R315-265-147(a)(1), (2), (3), (4), (5), or (6):

  (1) An owner or operator may demonstrate the required liability coverage by having liability insurance as specified in Subsection R315-265-147(a)(1).

  (i) Each insurance policy shall be amended by attachment of the Hazardous Waste Facility Liability Endorsement, or evidenced by a Certificate of Liability Insurance. The wording of the endorsement shall be identical to the wording specified in Subsection R315-264-151(i). The wording of the certificate of insurance shall be identical to the wording specified in Subsection R315-264-151(j). The owner or operator shall submit a signed duplicate original of the endorsement or the certificate of insurance to the Director. If requested by the Director, the owner or operator shall provide a signed duplicate original of the insurance policy.

  (ii) Each insurance policy shall be issued by an insurer which, at a minimum, is licensed to transact the business of insurance, or eligible to provide insurance as an excess or surplus lines insurer, in one or more States.

  (2) An owner or operator may meet the requirements of Section R315-265-147 by passing a financial test or using the guarantee for liability coverage as specified in Subsections R315-265-147(f) and (g).

  (3) An owner or operator may meet the requirements of Section R315-265-147 by obtaining a letter of credit for liability coverage as specified in Subsection R315-265-147(h).

  (4) An owner or operator may meet the requirements of Section R315-265-147 by obtaining a surety bond for liability coverage as specified in Subsection R315-265-147(i).

  (5) An owner or operator may meet the requirements of Section R315-265-147 by obtaining a trust fund for liability coverage as specified in Subsection R315-265-147(j).

  (6) An owner or operator may demonstrate the required liability coverage through the use of combinations of insurance, financial test, guarantee, letter of credit, surety bond, and trust fund, except that the owner or operator may not combine a financial test covering part of the liability coverage requirement with a guarantee unless the financial statement of the owner or operator is not consolidated with the financial statement of the guarantor. The amounts of coverage demonstrated shall total at least the minimum amounts required by Section R315-265-147. If the owner or operator demonstrates the required coverage through the use of a combination of financial assurances under Subsection R315-265-147(a)(6), the owner or operator shall specify at least one such assurance as "primary" coverage and shall specify other assurance as "excess" coverage.

  (7) An owner or operator shall notify the Director in writing within 30 days whenever:

  (i) A claim results in a reduction in the amount of financial assurance for liability coverage provided by a financial instrument authorized in SubSections R315-265-147(a)(1) through (a)(6); or

  (ii) A Certification of Valid Claim for bodily injury or property damages caused by a sudden or non-sudden accidental occurrence arising from the operation of a hazardous waste treatment, storage, or disposal facility is entered between the owner or operator and third-party claimant for liability coverage under Subsections R315-265-147(a)(1) through (a)(6); or

  (iii) A final court order establishing a judgment for bodily injury or property damage caused by a sudden or non-sudden accidental occurrence arising from the operation of a hazardous waste treatment, storage, or disposal facility is issued against the owner or operator or an instrument that is providing financial assurance for liability coverage under Subsections R315-265-147(a)(1) through (a)(6).

  (b) Coverage for nonsudden accidental occurrences. An owner or operator of a surface impoundment, landfill, or land treatment facility which is used to manage hazardous waste, or a group of such facilities, shall demonstrate financial responsibility for bodily injury and property damage to third parties caused by nonsudden accidental occurrences arising from operations of the facility or group of facilities. The owner or operator shall have and maintain liability coverage for nonsudden accidental occurrences in the amount of at least $3 million per occurrence with an annual aggregate of at least $6 million, exclusive of legal defense costs. An owner or operator who must meet the requirements of Section R315-265-147 may combine the required per-occurrence coverage levels for sudden and nonsudden accidental occurrences into a single per-occurrence level, and combine the required annual aggregate coverage levels for sudden and nonsudden accidental occurrences into a single annual aggregate level. Owners or operators who combine coverage levels for sudden and nonsudden accidental occurrences shall maintain liability coverage in the amount of at least $4 million per occurrence and $8 million annual aggregate. This liability coverage may be demonstrated as specified in Subsections R315-265-147(b)(1), (2), (3), (4), (5), or (6):

  (1) An owner or operator may demonstrate the required liability coverage by having liability insurance as specified in Subsection R315-265-147(b)(1).

  (i) Each insurance policy shall be amended by attachment of the Hazardous Waste Facility Liability Endorsement or evidenced by a Certificate of Liability Insurance. The wording of the endorsement shall be identical to the wording specified in Subsection R315-264-151(i). The wording of the certificate of insurance shall be identical to the wording specified in Subsection R315-264-151(j). The owner or operator shall submit a signed duplicate original of the endorsement or the certificate of insurance to the Director. If requested by the Director, the owner or operator must provide a signed duplicate original of the insurance policy.

  (ii) Each insurance policy shall be issued by an insurer which, at a minimum, is licensed to transact the business of insurance, or eligible to provide insurance as an excess or surplus lines insurer, in one or more States.

  (2) An owner or operator may meet the requirements of Section R315-265-147 by passing a financial test or using the guarantee for liability coverage as specified in Subsections R315-265-147(f) and (g).

  (3) An owner or operator may meet the requirements of Section R315-265-147 by obtaining a letter of credit for liability coverage as specified in Subsection R315-265-147(h).

  (4) An owner or operator may meet the requirements of Section R315-265-147 by obtaining a surety bond for liability coverage as specified in Subsection R315-265-147(i).

  (5) An owner or operator may meet the requirements of Section R315-265-147 by obtaining a trust fund for liability coverage as specified in Subsection R315-265-147(j).

  (6) An owner or operator may demonstrate the required liability coverage through the use of combinations of insurance, financial test, guarantee, letter of credit, surety bond, and trust fund, except that the owner or operator may not combine a financial test covering part of the liability coverage requirement with a guarantee unless the financial statement of the owner or operator is not consolidated with the financial statement of the guarantor. The amounts of coverage demonstrated shall total at least the minimum amounts required by Section R315-265-147. If the owner or operator demonstrates the required coverage through the use of a combination of financial assurances under Subsection R315-265-147(b), the owner or operator shall specify at least one such assurance as "primary" coverage and shall specify other assurance as "excess" coverage.

  (7) An owner or operator shall notify the Director in writing within 30 days whenever:

  (i) A claim results in a reduction in the amount of financial assurance for liability coverage provided by a financial instrument authorized in Subsections R315-265-147(b)(1) through (b)(6); or

  (ii) A Certification of Valid Claim for bodily injury or property damages caused by a sudden or non-sudden accidental occurrence arising from the operation of a hazardous waste treatment, storage, or disposal facility is entered between the owner or operator and third-party claimant for liability coverage under Subsections R315-265-147(b)(1) through (b)(6); or

  (iii) A final court order establishing a judgment for bodily injury or property damage caused by a sudden or non-sudden accidental occurrence arising from the operation of a hazardous waste treatment, storage, or disposal facility is issued against the owner or operator or an instrument that is providing financial assurance for liability coverage under Subsections R315-265-147(b)(1) through (b)(6).

  (c) Request for an exception. If an owner or operator can demonstrate to the satisfaction of the Director that the levels of financial responsibility required by Subsections R315-265-147(a) or (b) are not consistent with the degree and duration of risk associated with treatment, storage, or disposal at the facility or group of facilities, the owner or operator may obtain an exception from the Director. The request for an exception must be submitted in writing to the Director. If granted, the exception will take the form of an adjusted level of required liability coverage, such level to be based on the Director's assessment of the degree and duration of risk associated with the ownership or operation of the facility or group of facilities. The Director may require an owner or operator who requests an exception to provide such technical and engineering information as is deemed necessary by the Director to determine a level of financial responsibility other than that required by Subsections R315-265-147(a) or (b). The Director will process an exception request as if it were a permit modification request under Subsection R315-270-41(a)(5) and subject to the procedures of Section R315-124-5. Notwithstanding any other provision, the Director may hold a public hearing at his discretion or whenever he finds, on the basis of requests for a public hearing, a significant degree of public interest in a tentative decision to grant an exception.

  (d) Adjustments by the Director. If the Director determines that the levels of financial responsibility required by Subsections R315-265-147(a) or (b) are not consistent with the degree and duration of risk associated with treatment, storage, or disposal at the facility or group of facilities, the Director may adjust the level of financial responsibility required under Subsection R315-265-147(a) or (b) as may be necessary to protect human health and the environment. This adjusted level will be based on the Director's assessment of the degree and duration of risk associated with the ownership or operation of the facility or group of facilities. In addition, if the Director determines that there is a significant risk to human health and the environment from nonsudden accidental occurrences resulting from the operations of a facility that is not a surface impoundment, landfill, or land treatment facility, he may require that an owner or operator of the facility comply with Subsection R315-265-147(b). An owner or operator shall furnish to the Director, within a reasonable time, any information which the Director requests to determine whether cause exists for such adjustments of level or type of coverage. The Director will process an adjustment of the level of required coverage as if it were a permit modification under Subsection R315-270-41(a)(5) and subject to the procedures of Section R315-124-5. Notwithstanding any other provision, the Director may hold a public hearing at his discretion or whenever he finds, on the basis of requests for a public hearing, a significant degree of public interest in a tentative decision to adjust the level or type of required coverage.

  (e) Period of coverage. Within 60 days after receiving certifications from the owner or operator and a qualified Professional Engineer that final closure has been completed in accordance with the approved closure plan, the Director will notify the owner or operator in writing that he is no longer required by Section R315-265-147 to maintain liability coverage for that facility, unless the Director has reason to believe that closure has not been in accordance with the approved closure plan.

  (f) Financial test for liability coverage.

  (1) An owner or operator may satisfy the requirements of Section R315-265-147 by demonstrating that he passes a financial test as specified in this Subsection R315-265-147(f). To pass this test the owner or operator shall meet the criteria of Subsections R315-265-147(f)(1)(i) or (ii):

  (i) The owner or operator shall have:

  (A) Net working capital and tangible net worth each at least six times the amount of liability coverage to be demonstrated by this test; and

  (B) Tangible net worth of at least $10 million; and

  (C) Assets in the United States amounting to either: (1) At least 90 percent of his total assets; or (2) at least six times the amount of liability coverage to be demonstrated by this test.

  (ii) The owner or operator shall have:

  (A) A current rating for his most recent bond issuance of AAA, AA, A, or BBB as issued by Standard and Poor's, or Aaa, Aa, A, or Baa as issued by Moody's; and

  (B) Tangible net worth of at least $10 million; and

  (C) Tangible net worth at least six times the amount of liability coverage to be demonstrated by this test; and

  (D) Assets in the United States amounting to either: (1) At least 90 percent of his total assets; or (2) at least six times the amount of liability coverage to be demonstrated by this test.

  (2) The phrase "amount of liability coverage" as used in Subsection R315-265-147(f)(1) refers to the annual aggregate amounts for which coverage is required under Subsections R315-265-147(a) and (b).

  (3) To demonstrate that he meets this test, the owner or operator shall submit the following three items to the Director:

  (i) A letter signed by the owner's or operator's chief financial officer and worded as specified in Subsection R315-264-151(g). If an owner or operator is using the financial test to demonstrate both assurance for closure or post-closure care, as specified by Subsections R315-264-143(f), R315-264-145(f), R315-265-143(e), and R315-265-145(e), and liability coverage, he shall submit the letter specified in Subsection R315-264-151(g) to cover both forms of financial responsibility; a separate letter as specified in Subsection R315-264-151(f) is not required.

  (ii) A copy of the independent certified public accountant's report on examination of the owner's or operator's financial statements for the latest completed fiscal year.

  (iii) A special report from the owner's or operator's independent certified public accountant to the owner or operator stating that:

  (A) He has compared the data which the letter from the chief financial officer specifies as having been derived from the independently audited, year-end financial statements for the latest fiscal year with the amounts in such financial statements; and

  (B) In connection with that procedure, no matters came to his attention which caused him to believe that the specified data should be adjusted.

  (4) The owner or operator may obtain a one-time extension of the time allowed for submission of the documents specified in Subsection R315-265-147(f)(3) if the fiscal year of the owner or operator ends during the 90 days prior to the effective date of these regulations and if the year-end financial statements for that fiscal year will be audited by an independent certified public accountant. The extension will end no later than 90 days after the end of the owner's or operator's fiscal year. To obtain the extension, the owner's or operator's chief financial officer shall send, by the effective date of these regulations, a letter to the Director. This letter from the chief financial officer shall:

  (i) Request the extension;

  (ii) Certify that he has grounds to believe that the owner or operator meets the criteria of the financial test;

  (iii) Specify for each facility to be covered by the test the EPA Identification Number, name, address, the amount of liability coverage and, when applicable, current closure and post-closure cost estimates to be covered by the test;

  (iv) Specify the date ending the owner's or operator's last complete fiscal year before the effective date of these regulations;

  (v) Specify the date, no later than 90 days after the end of such fiscal year, when he will submit the documents specified in Subsection R315-265-147(f)(3); and

  (vi) Certify that the year-end financial statements of the owner or operator for such fiscal year will be audited by an independent certified public accountant.

  (5) After the initial submission of items specified in Subsection R315-265-147(f)(3), the owner or operator shall send updated information to the Director within 90 days after the close of each succeeding fiscal year. This information must consist of all three items specified in Subsection R315-265-147(f)(3).

  (6) If the owner or operator no longer meets the requirements of Subsection R315-265-147(f)(1), he shall obtain insurance, a letter of credit, a surety bond, a trust fund, or a guarantee for the entire amount of required liability coverage as specified in Section R315-265-147. Evidence of liability coverage must be submitted to the Director within 90 days after the end of the fiscal year for which the year-end financial data show that the owner or operator no longer meets the test requirements.

  (7) The Director may disallow use of this test on the basis of qualifications in the opinion expressed by the independent certified public accountant in his report on examination of the owner's or operator's financial statements, see Subsection R315-265-147(f)(3)(ii). An adverse opinion or a disclaimer of opinion will be cause for disallowance. The Director will evaluate other qualifications on an individual basis. The owner or operator shall provide evidence of insurance for the entire amount of required liability coverage as specified in Section R315-265-147 within 30 days after notification of disallowance.

  (g) Guarantee for liability coverage.

  (1) Subject to Subsection R315-265-147(g)(2), an owner or operator may meet the requirements of Section R315-265-147 by obtaining a written guarantee, hereinafter referred to as "guarantee." The guarantor shall be the direct or higher-tier parent corporation of the owner or operator, a firm whose parent corporation is also the parent corporation of the owner or operator, or a firm with a "substantial business relationship" with the owner or operator. The guarantor shall meet the requirements for owners or operators in Subsections R315-265-147(f)(1) through (f)(6). The wording of the guarantee must be identical to the wording specified in Subsection R315-264-151(h)(2). A certified copy of the guarantee shall accompany the items sent to the Director as specified in Subsection R315-265-147(f)(3). One of these items shall be the letter from the guarantor's chief financial officer. If the guarantor's parent corporation is also the parent corporation of the owner or operator, this letter shall describe the value received in consideration of the guarantee. If the guarantor is a firm with a "substantial business relationship" with the owner or operator, this letter shall describe this "substantial business relationship" and the value received in consideration of the guarantee.

  (i) If the owner or operator fails to satisfy a judgment based on a determination of liability for bodily injury or property damage to third parties caused by sudden or nonsudden accidental occurrences, or both as the case may be, arising from the operation of facilities covered by this corporate guarantee, or fails to pay an amount agreed to in settlement of claims arising from or alleged to arise from such injury or damage, the guarantor will do so up to the limits of coverage.

  (2)(i) In the case of corporations incorporated in the United States, a guarantee may be used to satisfy the requirements of Section R315-265-147 only if the Attorneys General or Insurance Commissioners of (A) the State in which the guarantor is incorporated, and (B) Utah have submitted a written statement to the Director that a guarantee executed as described in Section R315-265-147 and Subsection R315-264-151(h)(2) is a legally valid and enforceable obligation in Utah.

  (ii) In the case of corporations incorporated outside the United States, a guarantee may be used to satisfy the requirements of Section R315-265-147 only if (A) the non-U.S. corporation has identified a registered agent for service of process in each Utah and in the State in which it has its principal place of business, and if (B) the Attorney General or Insurance Commissioner of each Utah and the State in which the guarantor corporation has its principal place of business, has submitted a written statement to the Director that a guarantee executed as described in Section R315-265-147 and Subsection R315-264-151(h)(2) is a legally valid and enforceable obligation in that Utah.

  (h) Letter of credit for liability coverage.

  (1) An owner or operator may satisfy the requirements of Section R315-265-147 by obtaining an irrevocable standby letter of credit that conforms to the requirements of Subsection R315-265-147(h) and submitting a copy of the letter of credit to the Director.

  (2) The financial institution issuing the letter of credit shall be an entity that has the authority to issue letters of credit and whose letter of credit operations are regulated and examined by a Federal or Utah agency.

  (3) The wording of the letter of credit must be identical to the wording specified in Subsection R315-264-151(k).

  (4) An owner or operator who uses a letter of credit to satisfy the requirements of Section R315-265-147 may also establish a standby trust fund. Under the terms of such a letter of credit, all amounts paid pursuant to a draft by the trustee of the standby trust will be deposited by the issuing institution into the standby trust in accordance with instructions from the trustee. The trustee of the standby trust fund shall be an entity which has the authority to act as a trustee and whose trust operations are regulated and examined by a Federal or Utah agency.

  (5) The wording of the standby trust fund shall be identical to the wording specified in Subsection R315-264-151(n).

  (i) Surety bond for liability coverage.

  (1) An owner or operator may satisfy the requirements of Section R315-265-147 by obtaining a surety bond that conforms to the requirements of Subsection R315-265-147(i) and submitting a copy of the bond to the Director.

  (2) The surety company issuing the bond must be among those listed as acceptable sureties on Federal bonds in the most recent Circular 570 of the U.S. Department of the Treasury.

  (3) The wording of the surety bond must be identical to the wording specified in Subsection R315-264-151(l).

  (4) A surety bond may be used to satisfy the requirements of Section R315-265-147 only if the Attorneys General or Insurance Commissioners of (i) the State in which the surety is incorporated, and (ii) Utah have submitted a written statement to the Director that a surety bond executed as described in Section R315-265-147 and Subsection R315-264-151(l) is a legally valid and enforceable obligation in Utah.

  (j) Trust fund for liability coverage.

  (1) An owner or operator may satisfy the requirements of Section R315-265-147 by establishing a trust fund that conforms to the requirements of Subsection R315-265-147(j) and submitting an originally signed duplicate of the trust agreement to the Director.

  (2) The trustee shall be an entity which has the authority to act as a trustee and whose trust operations are regulated and examined by a Federal or Utah agency.

  (3) The trust fund for liability coverage shall be funded for the full amount of the liability coverage to be provided by the trust fund before it may be relied upon to satisfy the requirements of Section R315-265-147. If at any time after the trust fund is created the amount of funds in the trust fund is reduced below the full amount of the liability coverage to be provided, the owner or operator, by the anniversary date of the establishment of the Fund, shall either add sufficient funds to the trust fund to cause its value to equal the full amount of liability coverage to be provided, or obtain other financial assurance as specified in Section R315-265-147 to cover the difference. For purposes of Subsection R315-265-147(j), "the full amount of the liability coverage to be provided" means the amount of coverage for sudden occurrences, nonsudden occurrences, or both required to be provided by the owner or operator by Section R315-265-147, less the amount of financial assurance for liability coverage that is being provided by other financial assurance mechanisms being used to demonstrate financial assurance by the owner or operator.

  (4) The wording of the trust fund must be identical to the wording specified in Subsection R315-264-151(m).


R315-265-148. Financial Requirements -- Incapacity of Owners or Operators, Guarantors, or Financial Institutions
Latest version.

  (a) An owner or operator shall notify the Director by certified mail of the commencement of a voluntary or involuntary proceeding under Title 11, Bankruptcy, U.S. Code, naming the owner or operator as debtor, within 10 days after commencement of the proceeding. A guarantor of a corporate guarantee as specified in Subsections R315-265-143(e) and R315-265-145(e) shall make such a notification if he is named as debtor, as required under the terms of the corporate guarantee, see Subsection R315-264-151(h).

  (b) An owner or operator who fulfills the requirements of Sections R315-265-143, R315-265-145, or R315-265-147 by obtaining a trust fund, surety bond, letter of credit, or insurance policy will be deemed to be without the required financial assurance or liability coverage in the event of bankruptcy of the trustee or issuing institution, or a suspension or revocation of the authority of the trustee institution to act as trustee or of the institution issuing the surety bond, letter of credit, or insurance policy to issue such instruments. The owner or operator shall establish other financial assurance or liability coverage within 60 days after such an event.


R315-265-170. Use and Management of Containers -- Applicability
Latest version.

  The regulations in this Sections R315-265-170 through 265-178 apply to owners and operators of all hazardous waste facilities that store containers of hazardous waste, except as Section R315-265-1 provides otherwise.


R315-265-171. Use and Management of Containers -- Condition of Containers
Latest version.

  If a container holding hazardous waste is not in good condition, or if it begins to leak, the owner or operator shall transfer the hazardous waste from this container to a container that is in good condition, or manage the waste in some other way that complies with the requirements of Rule R315-265.


R315-265-172. Use and Management of Containers -- Compatibility of Waste with Container
Latest version.

  The owner or operator shall use a container made of or lined with materials which will not react with, and are otherwise compatible with, the hazardous waste to be stored, so that the ability of the container to contain the waste is not impaired.


R315-265-173. Use and Management of Containers -- Management of Containers
Latest version.

  (a) A container holding hazardous waste shall always be closed during storage, except when it is necessary to add or remove waste.

  (b) A container holding hazardous waste shall not be opened, handled, or stored in a manner which may rupture the container or cause it to leak.

  Comment: Re-use of containers in transportation is governed by U.S. Department of Transportation regulations, including those set forth in 49 CFR 173.28.


R315-265-174. Use and Management of Containers -- Inspections
Latest version.

  At least weekly, the owner or operator shall inspect areas where containers are stored. The owner or operator shall look for leaking containers and for deterioration of containers caused by corrosion or other factors. See Section R315-265-171 for remedial action required if deterioration or leaks are detected.


R315-265-176. Use and Management of Containers -- Special Requirements for Ignitable or Reactive Waste
Latest version.

  Containers holding ignitable or reactive waste shall be located at least 15 meters, 50 feet, from the facility's property line.

  Comment: See Subsection R315-265-17(a) for additional requirements.


R315-265-177. Use and Management of Containers -- Special Requirements for Incompatible Wastes
Latest version.

  (a) Incompatible wastes, or incompatible wastes and materials, see 40 CFR 265 appendix V which is adopted and incorporated by reference for examples, shall not be placed in the same container, unless Subsection R315-265-17(b) is complied with.

  (b) Hazardous waste shall not be placed in an unwashed container that previously held an incompatible waste or material, see 40 CFR 265 appendix V which is adopted and incorporated by reference for examples, unless Subsection R315-265-17(b) is complied with.

  (c) A storage container holding a hazardous waste that is incompatible with any waste or other materials stored nearby in other containers, piles, open tanks, or surface impoundments shall be separated from the other materials or protected from them by means of a dike, berm, wall, or other device.

  Comment: The purpose of this is to prevent fires, explosions, gaseous emissions, leaching, or other discharge of hazardous waste or hazardous waste constituents which could result from the mixing of incompatible wastes or materials if containers break or leak.


R315-265-178. Use and Management of Containers -- Air Emission Standards
Latest version.

  The owner or operator shall manage all hazardous waste placed in a container in accordance with the applicable requirements of subparts AA, BB, and CC of 40 CFR 265 which is adopted and incorporated by reference.


R315-265-190. Tank Systems -- Applicability
Latest version.

  The requirements of Sections R315-265-190 through 265-202 apply to owners and operators of facilities that use tank systems for storing or treating hazardous waste except as otherwise provided in Subsections R315-265-190(a), (b), and (c) or in Section R315-265-1.

  (a) Tank systems that are used to store or treat hazardous waste which contains no free liquids and are situated inside a building with an impermeable floor are exempted from the requirements in Section R315-265-193. To demonstrate the absence or presence of free liquids in the stored/treated waste, the following test must be used: Method 9095B, Paint Filter Liquids Test, as described in "Test Methods for Evaluating Solid Waste, Physical/Chemical Methods," EPA Publication SW-846, as incorporated by reference in Section R315-260-11.

  (b) Tank systems, including sumps, as defined in Section R315-260-10, that serve as part of a secondary containment system to collect or contain releases of hazardous wastes are exempted from the requirements in Subsection R315-265-193(a).

  (c) Tanks, sumps, and other collection devices used in conjunction with drip pads, as defined in Section R315-260-10 and regulated under 40 CFR part 265 subpart W, which is adopted and incorporated by reference, must meet the requirements of Sections R315-265-190 through 265-202.


R315-265-191. Tank Systems -- Assessment of Existing Tank System's Integrity
Latest version.

  (a) For each existing tank system that does not have secondary containment meeting the requirements of Section R315-265-193, the owner or operator shall determine that the tank system is not leaking or is unfit for use. Except as provided in Subsection R315-265-191(c), the owner or operator shall obtain and keep on file at the facility a written assessment reviewed and certified by a qualified Professional Engineer in accordance with Subsection R315-270-11(d), that attests to the tank system's integrity by January 12, 1988.

  (b) This assessment shall determine that the tank system is adequately designed and has sufficient structural strength and compatibility with the waste(s) to be stored or treated to ensure that it will not collapse, rupture, or fail. At a minimum, this assessment must consider the following:

  (1) Design standard(s), if available, according to which the tank and ancillary equipment were constructed;

  (2) Hazardous characteristics of the waste(s) that have been or will be handled;

  (3) Existing corrosion protection measures;

  (4) Documented age of the tank system, if available, otherwise, an estimate of the age; and

  (5) Results of a leak test, internal inspection, or other tank integrity examination such that:

  (i) For non-enterable underground tanks, this assessment shall consist of a leak test that is capable of taking into account the effects of temperature variations, tank end deflection, vapor pockets, and high water table effects,

  (ii) For other than non-enterable underground tanks and for ancillary equipment, this assessment shall be either a leak test, as described above, or an internal inspection, or other tank integrity examination, or a combination of assessment mechanisms, certified by a qualified Professional Engineer in accordance with Subsection R315-270-11(d) that addresses cracks, leaks, corrosion, and erosion.

  Note: The practices described in the American Petroleum Institute (API) Publication, Guide for Inspection of Refinery Equipment, Chapter XIII, "Atmospheric and Low-Pressure Storage Tanks," 4th edition, 1981, may be used, where applicable, as guidelines in conducting the integrity examination of an other than non-enterable underground tank system.

  (c) Tank systems that store or treat materials that become hazardous wastes subsequent to July 14, 1986 shall conduct this assessment within 12 months after the date that the waste becomes a hazardous waste.

  (d) If, as a result of the assessment conducted in accordance with Subsection R315-265-191(a), a tank system is found to be leaking or unfit for use, the owner or operator shall comply with the requirements of Section R315-265-196.


R315-265-192. Tank Systems -- Design and Installation of New Tank Systems or Components
Latest version.

  (a) Owners or operators of new tank systems or components shall ensure that the foundation, structural support, seams, connections, and pressure controls, if applicable, are adequately designed and that the tank system has sufficient structural strength, compatibility with the waste(s) to be stored or treated, and corrosion protection so that it will not collapse, rupture, or fail. The owner or operator shall obtain a written assessment reviewed and certified by a qualified Professional Engineer in accordance with Subsection R315-270-11(d) attesting that the system has sufficient structural integrity and is acceptable for the storing and treating of hazardous waste. This assessment shall include the following information:

  (1) Design standard(s) according to which the tank(s) and ancillary equipment is or will be constructed.

  (2) Hazardous characteristics of the waste(s) to be handled.

  (3) For new tank systems or components in which the external shell of a metal tank or any external metal component of the tank system is or will be in contact with the soil or with water, a determination by a corrosion expert of:

  (i) Factors affecting the potential for corrosion, including but not limited to:

  (A) Soil moisture content;

  (B) Soil pH;

  (C) Soil sulfides level;

  (D) Soil resistivity;

  (E) Structure to soil potential;

  (F) Influence of nearby underground metal structures, for example, piping;

  (G) Stray electric current; and,

  (H) Existing corrosion-protection measures, for example, coating, cathodic protection, and

  (ii) The type and degree of external corrosion protection that are needed to ensure the integrity of the tank system during the use of the tank system or component, consisting of one or more of the following:

  (A) Corrosion-resistant materials of construction such as special alloys or fiberglass-reinforced plastic;

  (B) Corrosion-resistant coating, such as epoxy or fiberglass, with cathodic protection, for example, impressed current or sacrificial anodes; and

  (C) Electrical isolation devices such as insulating joints and flanges.

  Note: The practices described in the National Association of Corrosion Engineers (NACE) standard, "Recommended Practice (RP-02-85)---Control of External Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems," and the American Petroleum Institute (API) Publication 1632, "Cathodic Protection of Underground Petroleum Storage Tanks and Piping Systems," may be used, where applicable, as guidelines in providing corrosion protection for tank systems.

  (4) For underground tank system components that are likely to be affected by vehicular traffic, a determination of design or operational measures that will protect the tank system against potential damage; and

  (5) Design considerations to ensure that:

  (i) Tank foundations will maintain the load of a full tank;

  (ii) Tank systems will be anchored to prevent flotation or dislodgement where the tank system is placed in a saturated zone, or is located within a seismic fault zone; and

  (iii) Tank systems will withstand the effects of frost heave.

  (b) The owner or operator of a new tank system shall ensure that proper handling procedures are adhered to in order to prevent damage to the system during installation. Prior to covering, enclosing, or placing a new tank system or component in use, an independent, qualified installation inspector or a qualified Professional Engineer, either of whom is trained and experienced in the proper installation of tank systems, shall inspect the system or component for the presence of any of the following items:

  (1) Weld breaks;

  (2) Punctures;

  (3) Scrapes of protective coatings;

  (4) Cracks;

  (5) Corrosion;

  (6) Other structural damage or inadequate construction or installation.

  All discrepancies shall be remedied before the tank system is covered, enclosed, or placed in use.

  (c) New tank systems or components and piping that are placed underground and that are backfilled shall be provided with a backfill material that is a noncorrosive, porous, homogeneous substance and that is carefully installed so that the backfill is placed completely around the tank and compacted to ensure that the tank and piping are fully and uniformly supported.

  (d) All new tanks and ancillary equipment shall be tested for tightness prior to being covered, enclosed or placed in use. If a tank system is found not to be tight, all repairs necessary to remedy the leak(s) in the system shall be performed prior to the tank system being covered, enclosed, or placed in use.

  (e) Ancillary equipment shall be supported and protected against physical damage and excessive stress due to settlement, vibration, expansion or contraction.

  Note: The piping system installation procedures described in American Petroleum Institute (API) Publication 1615 (November 1979), "Installation of Underground Petroleum Storage Systems," or ANSI Standard B31.3, "Petroleum Refinery System," may be used, where applicable, as guidelines for proper installation of piping systems.

  (f) The owner or operator shall provide the type and degree of corrosion protection necessary, based on the information provided under Subsection R315-265-192(a)(3), to ensure the integrity of the tank system during use of the tank system. The installation of a corrosion protection system that is field fabricated shall be supervised by an independent corrosion expert to ensure proper installation.

  (g) The owner or operator shall obtain and keep on file at the facility written statements by those persons required to certify the design of the tank system and supervise the installation of the tank system in accordance with the requirements of Subsections R315-265-192(b) through (f) to attest that the tank system was properly designed and installed and that repairs, pursuant to Subsections R315-265-192(b) and (d) were performed. These written statements shall also include the certification statement as required in Subsection R315-270-11(d).


R315-265-193. Tank Systems -- Containment and Detection of Releases
Latest version.

  (a) In order to prevent the release of hazardous waste or hazardous constituents to the environment, secondary containment that meets the requirements of Section R315-265-193 shall be provided, except as provided in Subsections R315-265-193(f) and (g):

  (1) For all new and existing tank systems or components, prior to their being put into service.

  (2) For tank systems that store or treat materials that become hazardous wastes, within 2 years of the hazardous waste listing, or when the tank system has reached 15 years of age, whichever comes later.

  (b) Secondary containment systems shall be:

  (1) Designed, installed, and operated to prevent any migration of wastes or accumulated liquid out of the system to the soil, ground water, or surface water at any time during the use of the tank system; and

  (2) Capable of detecting and collecting releases and accumulated liquids until the collected material is removed.

  (c) To meet the requirements of Subsection R315-265-193(b), secondary containment systems shall be at a minimum:

  (1) Constructed of or lined with materials that are compatible with the waste(s) to be placed in the tank system and shall have sufficient strength and thickness to prevent failure due to pressure gradients, including static head and external hydrological forces, physical contact with the waste to which they are exposed, climatic conditions, the stress of installation, and the stress of daily operation, including stresses from nearby vehicular traffic;

  (2) Placed on a foundation or base capable of providing support to the secondary containment system and resistance to pressure gradients above and below the system and capable of preventing failure due to settlement, compression, or uplift;

  (3) Provided with a leak detection system that is designed and operated so that it will detect the failure of either the primary and secondary containment structure or any release of hazardous waste or accumulated liquid in the secondary containment system within 24 hours, or at the earliest practicable time if the existing detection technology or site conditions will not allow detection of a release within 24 hours;

  (4) Sloped or otherwise designed or operated to drain and remove liquids resulting from leaks, spills, or precipitation. Spilled or leaked waste and accumulated precipitation shall be removed from the secondary containment system within 24 hours, or in as timely a manner as is possible to prevent harm to human health or the environment, if removal of the released waste or accumulated precipitation cannot be accomplished within 24 hours.

  Note: If the collected material is a hazardous waste under Rule R315-261, it is subject to management as a hazardous waste in accordance with all applicable requirements of Rules R315-262 through R315-265. If the collected material is discharged through a point source to waters of the United States, it is subject to the requirements of sections 301, 304, and 402 of the Clean Water Act, as amended. If discharged to Publicly Owned Treatment Works (POTWs), it is subject to the requirements of section 307 of the Clear Water Act, as amended. If the collected material is released to the environment, it may be subject to the reporting requirements of 40 CFR part 302.

  (d) Secondary containment for tanks shall include one or more of the following devices:

  (1) A liner, external to the tank;

  (2) A vault;

  (3) A double-walled tank; or

  (4) An equivalent device as approved by the Director.

  (e) In addition to the requirements of Subsections R315-265-193(b), (c), and (d), secondary containment systems shall satisfy the following requirements:

  (1) External liner systems must be:

  (i) Designed or operated to contain 100 percent of the capacity of the largest tank within its boundary;

  (ii) Designed or operated to prevent run-on or infiltration of precipitation into the secondary containment system unless the collection system has sufficient excess capacity to contain run-on or infiltration. Such additional capacity shall be sufficient to contain precipitation from a 25-year, 24-hour rainfall event;

  (iii) Free of cracks or gaps; and

  (iv) Designed and installed to completely surround the tank and to cover all surrounding earth likely to come into contact with the waste if released from the tank(s), for example, capable of preventing lateral as well as vertical migration of the waste.

  (2) Vault systems shall be:

  (i) Designed or operated to contain 100 percent of the capacity of the largest tank within its boundary;

  (ii) Designed or operated to prevent run-on or infiltration of precipitation into the secondary containment system unless the collection system has sufficient excess capacity to contain run-on or infiltration. Such additional capacity must be sufficient to contain precipitation from a 25-year, 24-hour rainfall event;

  (iii) Constructed with chemical-resistant water stops in place at all joints, if any;

  (iv) Provided with an impermeable interior coating or lining that is compatible with the stored waste and that will prevent migration of waste into the concrete;

  (v) Provided with a means to protect against the formation of and ignition of vapors within the vault, if the waste being stored or treated:

  (A) Meets the definition of ignitable waste under Section R315-261-21, or

  (B) Meets the definition of reactive waste under Section R315-261-23 and may form an ignitable or explosive vapor; and

  (vi) Provided with an exterior moisture barrier or be otherwise designed or operated to prevent migration of moisture into the vault if the vault is subject to hydraulic pressure.

  (3) Double-walled tanks shall be:

  (i) Designed as an integral structure, for example, an inner tank within an outer shell, so that any release from the inner tank is contained by the outer shell;

  (ii) Protected, if constructed of metal, from both corrosion of the primary tank interior and the external surface of the outer shell; and

  (iii) Provided with a built-in, continuous leak detection system capable of detecting a release within 24 hours or at the earliest practicable time, if the owner or operator can demonstrate to the Director, and the Director concurs, that the existing leak detection technology or site conditions will not allow detection of a release within 24 hours.

  Note: The provisions outlined in the Steel Tank Institute's (STI) "Standard for Dual Wall Underground Steel Storage Tank" may be used as guidelines for aspects of the design of underground steel double-walled tanks.

  (f) Ancillary equipment shall be provided with full secondary containment, for example, trench, jacketing, double-walled piping, that meets the requirements of Subsections R315-265-193(b) and (c) except for:

  (1) Aboveground piping, exclusive of flanges, joints, valves, and connections, that are visually inspected for leaks on a daily basis;

  (2) Welded flanges, welded joints, and welded connections that are visually inspected for leaks on a daily basis;

  (3) Sealless or magnetic coupling pumps and sealless valves, that are visually inspected for leaks on a daily basis; and

  (4) Pressurized aboveground piping systems with automatic shut-off devices, for example, excess flow check valves, flow metering shutdown devices, loss of pressure actuated shut-off devices, that are visually inspected for leaks on a daily basis.

  (g) The owner or operator may obtain an exception from the requirements of Section R315-265-193 if the Director finds, as a result of a demonstration by the owner or operator, either: that alternative design and operating practices, together with location characteristics, will prevent the migration of hazardous waste or hazardous constituents into the ground water or surface water at least as effectively as secondary containment during the active life of the tank system or that in the event of a release that does migrate to ground water or surface water, no substantial present or potential hazard will be posed to human health or the environment. New underground tank systems may not, per a demonstration in accordance with Subsection R315-265-193(g)(2), be exempted from the secondary containment requirements of Section R315-265-193. Application for an exception as allowed in Subsection R315-265-193(g) does not waive compliance with the requirements of Sections R315-265-190 through R315-265-202 for new tank systems.

  (1) In deciding whether to grant an excpetion based on a demonstration of equivalent protection of ground water and surface water, the Director will consider:

  (i) The nature and quantity of the waste;

  (ii) The proposed alternate design and operation;

  (iii) The hydrogeologic setting of the facility, including the thickness of soils between the tank system and ground water; and

  (iv) All other factors that would influence the quality and mobility of the hazardous constituents and the potential for them to migrate to ground water or surface water.

  (2) In deciding whether to grant an excpetion, based on a demonstration of no substantial present or potential hazard, the Director will consider:

  (i) The potential adverse effects on ground water, surface water, and land quality taking into account:

  (A) The physical and chemical characteristics of the waste in the tank system, including its potential for migration,

  (B) The hydrogeological characteristics of the facility and surrounding land,

  (C) The potential for health risks caused by human exposure to waste constituents,

  (D) The potential for damage to wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents, and

  (E) The persistence and permanence of the potential adverse effects;

  (ii) The potential adverse effects of a release on ground-water quality, taking into account:

  (A) The quantity and quality of ground water and the direction of ground-water flow,

  (B) The proximity and withdrawal rates of water in the area,

  (C) The current and future uses of ground water in the area, and

  (D) The existing quality of ground water, including other sources of contamination and their cumulative impact on the ground-water quality;

  (iii) The potential adverse effects of a release on surface water quality, taking into account:

  (A) The quantity and quality of ground water and the direction of ground-water flow,

  (B) The patterns of rainfall in the region,

  (C) The proximity of the tank system to surface waters,

  (D) The current and future uses of surface waters in the area and any water quality standards established for those surface waters, and

  (E) The existing quality of surface water, including other sources of contamination and the cumulative impact on surface-water quality; and

  (iv) The potential adverse effects of a release on the land surrounding the tank system, taking into account:

  (A) The patterns of rainfall in the region, and

  (B) The current and future uses of the surrounding land.

  (3) The owner or operator of a tank system, for which an excpetion from secondary containment had been granted in accordance with the requirements of Subsection R315-265-193(g)(1), at which a release of hazardous waste has occurred from the primary tank system but has not migrated beyond the zone of engineering control, as established in the exception, shall:

  (i) Comply with the requirements of Section R315-265-196, except Subsection R315-265-196(d); and

  (ii) Decontaminate or remove contaminated soil to the extent necessary to:

  (A) Enable the tank system, for which the excpetion was granted, to resume operation with the capability for the detection of and response to releases at least equivalent to the capability it had prior to the release, and

  (B) Prevent the migration of hazardous waste or hazardous constituents to ground water or surface water; and

  (iii) If contaminated soil cannot be removed or decontaminated in accordance with Subsection R315-265-193(g)(3)(ii), comply with the requirements of Subsection R315-265-197(b);

  (4) The owner or operator of a tank system, for which an exception from secondary containment had been granted in accordance with the requirements of Subsection R315-265-193(g)(1), at which a release of hazardous waste has occurred from the primary tank system and has migrated beyond the zone of engineering control, as established in the exception, shall:

  (i) Comply with the requirements of Subsections R315-265-196(a), (b), (c), and (d); and

  (ii) Prevent the migration of hazardous waste or hazardous constituents to ground water or surface water, if possible, and decontaminate or remove contaminated soil. If contaminated soil cannot be decontaminated or removed, or if ground water has been contaminated, the owner or operator shall comply with the requirements of Subsection R315-265-197(b);

  (iii) If repairing, replacing, or reinstalling the tank system, provide secondary containment in accordance with the requirements of Subsections R315-265-193(a) through (f) or reapply for an exception from secondary containment and meet the requirements for new tank systems in Section R315-265-192 if the tank system is replaced. The owner or operator shall comply with these requirements even if contaminated soil can be decontaminated or removed, and ground water or surface water has not been contaminated.

  (h) The following procedures shall be followed in order to request an exception from secondary containment:

  (1) The Director shall be notified in writing by the owner or operator that he intends to conduct and submit a demonstration for an exception from secondary containment as allowed in paragraph (g) of this section according to the following schedule:

  (i) For existing tank systems, at least 24 months prior to the date that secondary containment shall be provided in accordance with Subsection R315-265-193(a); and

  (ii) For new tank systems, at least 30 days prior to entering into a contract for installation of the tank system.

  (2) As part of the notification, the owner or operator shall also submit to the Director a description of the steps necessary to conduct the demonstration and a timetable for completing each of the steps. The demonstration shall address each of the factors listed in Subsection R315-265-193(g)(1) or Subsection R315-265-193(g)(2).

  (3) The demonstration for an exception shall be completed and submitted to the Director within 180 days after notifying the Director of intent to conduct the demonstration.

  (4) The Director will inform the public, through a newspaper notice, of the availability of the demonstration for an exception. The notice shall be placed in a daily or weekly major local newspaper of general circulation and shall provide at least 30 days from the date of the notice for the public to review and comment on the demonstration for an exception. The Direction also will hold a public hearing, in response to a request or at his own discretion, whenever such a hearing might clarify one or more issues concerning the demonstration for an exception. Public notice of the hearing will be given at least 30 days prior to the date of the hearing and may be given at the same time as notice of the opportunity for the public to review and comment on the demonstration. These two notices may be combined.

  (5) The Director will approve or disapprove the request for an exception within 90 days of receipt of the demonstration from the owner or operator and will notify in writing the owner or operator and each person who submitted written comments or requested notice of the exception decision. If the demonstration for an exception is incomplete or does not include sufficient information, the 90-day time period will begin when the Director receives a complete demonstration, including all information necessary to make a final determination. If the public comment period in Subsection R315-265-193(h)(4) is extended, the 90-day time period will be similarly extended.

  (i) All tank systems, until such time as secondary containment meeting the requirements of Section R315-265-193 is provided, shall comply with the following:

  (1) For non-enterable underground tanks, a leak test that meets the requirements of Subsection R315-265-191(b)(5) shall be conducted at least annually;

  (2) For other than non-enterable underground tanks, and for all ancillary equipment, the owner or operator shall either conduct a leak test as in Subsection R315-265-193(i)(1) or an internal inspection or other tank integrity examination by a qualified Professional Engineer that addresses cracks, leaks, and corrosion or erosion at least annually. The owner or operator shall remove the stored waste from the tank, if necessary, to allow the condition of all internal tank surfaces to be assessed.

  Note: The practices described in the American Petroleum Institute (API) Publication Guide for Inspection of Refining Equipment, Chapter XIII, "Atmospheric and Low Pressure Storage Tanks," 4th edition, 1981, may be used, when applicable, as guidelines for assessing the overall condition of the tank system.

  (3) The owner or operator shall maintain on file at the facility a record of the results of the assessments conducted in accordance with Subsections R315-265-193(i)(1) through (i)(3).

  (4) If a tank system or component is found to be leaking or unfit-for-use as a result of the leak test or assessment in Subsections R315-265-193(i)(1) through (i)(3), the owner or operator shall comply with the requirements of Subsection R315-265-196.


R315-265-194. Tank Systems -- General Operating Requirements
Latest version.

  (a) Hazardous wastes or treatment reagents shall not be placed in a tank system if they could cause the tank, its ancillary equipment, or the secondary containment system to rupture, leak, corrode, or otherwise fail.

  (b) The owner or operator shall use appropriate controls and practices to prevent spills and overflows from tank or secondary containment systems. These include at a minimum:

  (1) Spill prevention controls, for example, check valves, dry disconnect couplings;

  (2) Overfill prevention controls, for example, level sensing devices, high level alarms, automatic feed cutoff, or bypass to a standby tank; and

  (3) Maintenance of sufficient freeboard in uncovered tanks to prevent overtopping by wave or wind action or by precipitation.

  (c) The owner or operator must comply with the requirements of Section R315-265-196 if a leak or spill occurs in the tank system.


R315-265-195. Tank Systems -- Inspections
Latest version.

  (a) The owner or operator shall inspect, where present, at least once each operating day, data gathered from monitoring and leak detection equipment, for example, pressure or temperature gauges, monitoring wells, to ensure that the tank system is being operated according to its design.

  Note: Subsection R315-265-15(c) requires the owner or operator to remedy any deterioration or malfunction he finds. Section R315-265-196 requires the owner or operator to notify the Director within 24 hours of confirming a release. Also, 40 CFR part 302 may require the owner or operator to notify the National Response Center of a release.

  (b) Except as noted under Subsection R315-265-195(c), the owner or operator shall inspect at least once each operating day:

  (1) Overfill/spill control equipment, for example, waste-feed cutoff systems, bypass systems, and drainage systems, to ensure that it is in good working order;

  (2) Above ground portions of the tank system, if any, to detect corrosion or releases of waste; and

  (3) The construction materials and the area immediately surrounding the externally accessible portion of the tank system, including the secondary containment system, for example, dikes, to detect erosion or signs of releases of hazardous waste, for example, wet spots, dead vegetation.

  (c) Owners or operators of tank systems that either use leak detection equipment to alert facility personnel to leaks, or implement established workplace practices to ensure leaks are promptly identified, shall inspect at least weekly those areas described in Subsections R315-265-195(b)(1) through (3). Use of the alternate inspection schedule shall be documented in the facility's operating record. This documentation shall include a description of the established workplace practices at the facility.

  (d) (Reserved)

  (e) Ancillary equipment that is not provided with secondary containment, as described in Subsections R315-265-193(f)(1) through (4), shall be inspected at least once each operating day.

  (f) The owner or operator shall inspect cathodic protection systems, if present, according to, at a minimum, the following schedule to ensure that they are functioning properly:

  (1) The proper operation of the cathodic protection system shall be confirmed within six months after initial installation, and annually thereafter; and

  (2) All sources of impressed current shall be inspected and/or tested, as appropriate, at least bimonthly, for example, every other month.

  Note: The practices described in the National Association of Corrosion Engineers (NACE) standard, "Recommended Practice (RP-02-85)-Control of External Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems," and the American Petroleum Institute (API) Publication 1632, "Cathodic Protection of Underground Petroleum Storage Tanks and Piping Systems," may be used, where applicable, as guidelines in maintaining and inspecting cathodic protection systems.

  (g) The owner or operator shall document in the operating record of the facility an inspection of those items in Subsections R315-265-195(a) and (b).


R315-265-196. Tank Systems -- Response to Leaks or Spills and Dispostion of Leaking or Unfit-For-Use Tank Systems
Latest version.

  A tank system or secondary containment system from which there has been a leak or spill, or which is unfit for use, shall be removed from service immediately, and the owner or operator shall satisfy the following requirements:

  (a) Cessation of use; prevent flow or addition of wastes. The owner or operator shall immediately stop the flow of hazardous waste into the tank system or secondary containment system and inspect the system to determine the cause of the release.

  (b) Removal of waste from tank system or secondary containment system.

  (1) If the release was from the tank system, the owner or operator shall, within 24 hours after detection of the leak or, if the owner or operator demonstrates that that is not possible, at the earliest practicable time remove as much of the waste as is necessary to prevent further release of hazardous waste to the environment and to allow inspection and repair of the tank system to be performed.

  (2) If the release was to a secondary containment system, all released materials shall be removed within 24 hours or in as timely a manner as is possible to prevent harm to human health and the environment.

  (c) Containment of visible releases to the environment. The owner or operator shall immediately conduct a visual inspection of the release and, based upon that inspection:

  (1) Prevent further migration of the leak or spill to soils or surface water; and

  (2) Remove, and properly dispose of, any visible contamination of the soil or surface water.

  (d) Notifications, reports.

  (1) Any release to the environment, except as provided in Subsection R315-265-196(d)(2), shall be reported to the Director within 24 hours of detection. If the release has been reported pursuant to 40 CFR part 302, that report will satisfy this requirement.

  (2) A leak or spill of hazardous waste that is:

  (i) Less than or equal to a quantity of one pound, and

  (ii) Immediately contained and cleaned-up is exempted from the requirements of Subsection R315-265-196(d).

  (3) Within 30 days of detection of a release to the environment, a report containing the following information shall be submitted to the Director:

  (i) Likely route of migration of the release;

  (ii) Characteristics of the surrounding soil, soil composition, geology, hydrogeology, climate;

  (iii) Results of any monitoring or sampling conducted in connection with the release, if available. If sampling or monitoring data relating to the release are not available within 30 days, these data shall be submitted to the Director as soon as they become available;

  (iv) Proximity to downgradient drinking water, surface water, and population areas; and

  (v) Description of response actions taken or planned.

  (e) Provision of secondary containment, repair, or closure.

  (1) Unless the owner or operator satisfies the requirements of Subsections R315-265-196(e) (2) through (4), the tank system shall be closed in accordance with Section R315-265-197.

  (2) If the cause of the release was a spill that has not damaged the integrity of the system, the owner or operator may return the system to service as soon as the released waste is removed and repairs, if necessary, are made.

  (3) If the cause of the release was a leak from the primary tank system into the secondary containment system, the system shall be repaired prior to returning the tank system to service.

  (4) If the source of the release was a leak to the environment from a component of a tank system without secondary containment, the owner or operator shall provide the component of the system from which the leak occurred with secondary containment that satisfies the requirements of Section R315-265-193 before it can be returned to service, unless the source of the leak is an aboveground portion of a tank system. If the source is an aboveground component that can be inspected visually, the component shall be repaired and may be returned to service without secondary containment as long as the requirements of Subsection R315-265-196(f) are satisfied. If a component is replaced to comply with the requirements of Subsection R315-265-196(e)(4), that component shall satisfy the requirements for new tank systems or components in Sections R315-265-192 and R315-265-193. Additionally, if a leak has occurred in any portion of a tank system component that is not readily accessible for visual inspection, for example, the bottom of an inground or onground tank, the entire component shall be provided with secondary containment in accordance with Section R315-265-193 prior to being returned to use.

  (f) Certification of major repairs. If the owner or operator has repaired a tank system in accordance with Subsection R315-265-196(e), and the repair has been extensive, for example, installation of an internal liner; repair of a ruptured primary containment or secondary containment vessel, the tank system shall not be returned to service unless the owner or operator has obtained a certification by a qualified Professional Engineer in accordance with Subsection R315-270-11(d) that the repaired system is capable of handling hazardous wastes without release for the intended life of the system. This certification is to be placed in the operating record and maintained until closure of the facility.

  Note: The Director may, on the basis of any information received that there is or has been a release of hazardous waste or hazardous constituents into the environment, issue an order under Sections 19-6-101 through 125 requiring corrective action or such other response as deemed necessary to protect human health or the environment.

  Note: See Subsection R315-265-15(c) for the requirements necessary to remedy a failure. Also, 40 CFR Part 302 requires the owner or operator to notify the National Response Center of a release of any "reportable quantity."


R315-265-197. Tank Systems -- Closure and Post-Closure Care
Latest version.

  (a) At closure of a tank system, the owner or operator shall remove or decontaminate all waste residues, contaminated containment system components, for example, liners, contaminated soils, and structures and equipment contaminated with waste, and manage them as hazardous waste, unless Subsection R315-261-3(d) applies. The closure plan, closure activities, cost estimates for closure, and financial responsibility for tank systems shall meet all of the requirements specified in Sections R315-265-110 through 265-121 and Sections R315-265-140 through 265-147.

  (b) If the owner or operator demonstrates that not all contaminated soils can be practicably removed or decontaminated as required in Subsection R315-265-197(a), then the owner or operator shall close the tank system and perform post-closure care in accordance with the closure and post-closure care requirements that apply to landfills, 40 CFR 265.310. In addition, for the purposes of closure, post-closure, and financial responsibility, such a tank system is then considered to be a landfill, and the owner or operator shall meet all of the requirements for landfills specified in Sections R315-265-110 through 265-121 and Sections R315-265-140 through 265-147.

  (c) If an owner or operator has a tank system which does not have secondary containment that meets the requirements of Subsections R315-265-193(b) through (f) and which is not exempt from the secondary containment requirements in accordance with Subsection R315-265-193(g), then,

  (1) The closure plan for the tank system shall include both a plan for complying with Subsection R315-265-197(a) and a contingent plan for complying with Subsection R315-265-197(b).

  (2) A contingent post-closure plan for complying with Subsection R315-265-197(b)shall be prepared and submitted as part of the permit application.

  (3) The cost estimates calculated for closure and post-closure care shall reflect the costs of complying with the contingent closure plan and the contingent post-closure plan, if these costs are greater than the costs of complying with the closure plan prepared for the expected closure under Subsection R315-265-197(a).

  (4) Financial assurance must be based on the cost estimates in Subsection R315-265-197(c)(3).

  (5) For the purposes of the contingent closure and post-closure plans, such a tank system is considered to be a landfill, and the contingent plans shall meet all of the closure, post-closure, and financial responsibility requirements for landfills under Sections R315-265-110 through 265-121 and Sections R315-265-140 through 265-147.


R315-265-198. Tank Systems -- Special Requirements for Ignitable or Reactive Wastes
Latest version.

  (a) Ignitable or reactive waste shall not be placed in a tank system, unless:

  (1) The waste is treated, rendered, or mixed before or immediately after placement in the tank system so that:

  (i) The resulting waste, mixture, or dissolved material no longer meets the definition of ignitable or reactive waste under Sections R315-261-21 or R315-261-23; and

  (ii) Subsection R315-265-17(b) is complied with; or

  (2) The waste is stored or treated in such a way that it is protected from any material or conditions that may cause the waste to ignite or react; or

  (3) The tank system is used solely for emergencies.

  (b) The owner or operator of a facility where ignitable or reactive waste is stored or treated in tanks shall comply with the requirements for the maintenance of protective distances between the waste management area and any public ways, streets, alleys, or an adjoining property line that can be built upon as required in Tables 2-1 through 2-6 of the National Fire Protection Association's "Flammable and Combustible Liquids Code," 1977 or 1981, incorporated by reference, see Section R315-260-11.


R315-265-199. Tank Systems -- Special Requirements for Incompatible Wastes
Latest version.

  (a) Incompatible wastes, or incompatible waste and materials, shall not be placed in the same tank system, unless Subsection R315-265-17(b) is complied with.

  (b) Hazardous waste shall not be placed in a tank system that has not been decontaminated and that previously held an incompatible waste or material, unless Subsection R315-265-17(b) is complied with.


R315-265-200. Tank Systems -- Waste Analysis and Trial Tests
Latest version.

  In addition to performing the waste analysis required by Section R315-265-13, the owner or operator shall, whenever a tank system is to be used to treat chemically or to store a hazardous waste that is substantially different from waste previously treated or stored in that tank system; or treat chemically a hazardous waste with a substantially different process than any previously used in that tank system:

  (a) Conduct waste analyses and trial treatment or storage tests, for example, bench-scale or pilot-plant scale tests; or

  (b) Obtain written, documented information on similar waste under similar operating conditions to show that the proposed treatment or storage will meet the requirements of Subsection R315-265-194(a).

  Note: Section R315-265-13 requires the waste analysis plan to include analyses needed to comply with Sections R315-265-198 and 265-199. Section R315-265-73 requires the owner or operator to place the results from each waste analysis and trial test, or the documented information, in the operating record of the facility.


R315-265-202. Tank Systems -- Air Emission Standards
Latest version.

  The owner or operator shall manage all hazardous waste placed in a tank in accordance with the applicable requirements of 40 CFR 265 subparts AA, BB, and CC.


R315-265-220. Surface Impoundments -- Applicability
Latest version.

  The regulations in Sections R315-265-220 through 265-231 apply to owners and operators of facilities that use surface impoundments to treat, store, or dispose of hazardous waste, except as Section R315-265-1 provides otherwise.


R315-265-221. Surface Impoundments -- Design and Operating Requirements
Latest version.

  (a) The owner or operator of each new surface impoundment unit, each lateral expansion of a surface impoundment unit, and each replacement of an existing surface impoundment unit shall install two or more liners, and a leachate collection and removal system between the liners, and operate the leachate collection and removal system, in accordance with Subsection R315-264-221(c), unless exempted under Subsections R315-264-221(d), (e), or (f).

  (b) The owner or operator of each unit referred to in Subsection R315-265-221(a) shall notify the Director at least sixty days prior to receiving waste. The owner or operator of each facility submitting notice shall file a part B application within six months of the receipt of such notice.

  (c) The owner or operator of any replacement surface impoundment unit is exempt from Subsection R315-265-221(a) if:

  (1) The existing unit was constructed in compliance with the design standards of Subsections 3004(o)(1)(A)(i) and (o)(5) of the Resource Conservation and Recovery Act; and

  (2) There is no reason to believe that the liner is not functioning as designed.

  (d) The double liner requirement set forth in Subsection R315-265-221(a) may be waived by the Director for any monofill, if:

  (1) The monofill contains only hazardous wastes from foundry furnace emission controls or metal casting molding sand, and such wastes do not contain constituents which would render the wastes hazardous for reasons other than the Toxicity Characteristic in Section R315-261-24, with EPA Hazardous Waste Numbers D004 through D017; an

  (2)(i)(A) The monofill has at least one liner for which there is no evidence that such liner is leaking. For the purposes of Subsection R315-265-221(d) the term "liner" means a liner designed, constructed, installed, and operated to prevent hazardous waste from passing into the liner at any time during the active life of the facility, or a liner designed, constructed, installed, and operated to prevent hazardous waste from migrating beyond the liner to adjacent subsurface soil, ground water, or surface water at any time during the active life of the facility. In the case of any surface impoundment which has been exempted from the requirements of Subsection R315-265-221(a) on the basis of a liner designed, constructed, installed, and operated to prevent hazardous waste from passing beyond the liner, at the closure of such impoundment the owner or operator shall remove or decontaminate all waste residues, all contaminated liner material, and contaminated soil to the extent practicable. If all contaminated soil is not removed or decontaminated, the owner or operator of such impoundment shall comply with appropriate post-closure requirements, including but not limited to ground-water monitoring and corrective action;

  (B) The monofill is located more than one-quarter mile from an "underground source of drinking water", as that term is defined in Section R315-270-2; and

  (C) The monofill is in compliance with generally applicable ground-water monitoring requirements for facilities with permits under RCRA section 3005(c); or

  (ii) The owner or operator demonstrates that the monofill is located, designed and operated so as to assure that there will be no migration of any hazardous constituent into ground water or surface water at any future time.

  (e) In the case of any unit in which the liner and leachate collection system has been installed pursuant to the requirements of Subsection R315-265-221(a) and in good faith compliance with Subsection R315-265-221(a) and with guidance documents governing liners and leachate collection systems under Subsection R315-265-221(a), no liner or leachate collection system which is different from that which was so installed pursuant to Subsection R315-265-221(a) will be required for such unit by the Director when issuing the first permit to such facility, except that the Director will not be precluded from requiring installation of a new liner when the Director has reason to believe that any liner installed pursuant to the requirements of Subsection R315-265-221(a) is leaking.

  (f) A surface impoundment shall maintain enough freeboard to prevent any overtopping of the dike by overfilling, wave action, or a storm. Except as provided in Subsection R315-265-221(b), there shall be at least 60 centimeters, two feet, of freeboard.

  (g) A freeboard level less than 60 centimeters, two feet, may be maintained if the owner or operator obtains certification by a qualified engineer that alternate design features or operating plans will, to the best of his knowledge and opinion, prevent overtopping of the dike. The certification, along with a written identification of alternate design features or operating plans preventing overtopping, shall be maintained at the facility.

  (h) Surface impoundments that are newly subject to RCRA section 3005(j)(1) due to the promulgation of additional listings or characteristics for the identification of hazardous waste shall be in compliance with Subsections R315-265-221(a), (c) and (d) not later than 48 months after the promulgation of the additional listing or characteristic. This compliance period shall not be cut short as the result of the promulgation of land disposal prohibitions under Rule R315-268 or the granting of an extension to the effective date of a prohibition pursuant to Section R315-268-5, within this 48-month period.


R315-265-222. Surface Impoundments -- Action Leakage Rate
Latest version.

  (a) The owner or operator of surface impoundment units subject to Subsection R315-265-221(a) shall submit a proposed action leakage rate to the Director when submitting the notice required under Subsection R315-265-221(b). Within 60 days of receipt of the notification, the Director will: Establish an action leakage rate, either as proposed by the owner or operator or modified using the criteria in Section R315-265-222; or extend the review period for up to 30 days. If no action is taken by the Director before the original 60 or extended 90 day review periods, the action leakage rate will be approved as proposed by the owner or operator.

  (b) The Director shall approve an action leakage rate for surface impoundment units subject to Subsection R315-265-221(a). The action leakage rate is the maximum design flow rate that the leak detection system (LDS) can remove without the fluid head on the bottom liner exceeding 1 foot. The action leakage rate shall include an adequate safety margin to allow for uncertainties in the design, for example, slope, hydraulic conductivity, and thickness of drainage material, construction, operation, and location of the LDS, waste and leachate characteristics, likelihood and amounts of other sources of liquids in the LDS, and proposed response actions, for example, the action leakage rate must consider decreases in the flow capacity of the system over time resulting from siltation and clogging, rib layover and creep of synthetic components of the system, overburden pressures, etc.

  (c) To determine if the action leakage rate has been exceeded, the owner or operator shall convert the weekly or monthly flow rate from the monitoring data obtained under Subsection R315-265-226(b), to an average daily flow rate, gallons per acre per day, for each sump. Unless the Director approves a different calculation, the average daily flow rate for each sump shall be calculated weekly during the active life and closure period, and if the unit closes in accordance with Subsection R315-265-228(a)(2), monthly during the post-closure care period when monthly monitoring is required under Subsection R315-265-226(b).


R315-265-223. Surface Impoundments -- Containment System
Latest version.

  All earthen dikes shall have a protective cover, such as grass, shale, or rock, to minimize wind and water erosion and to preserve their structural integrity.


R315-265-224. Surface Impoundments -- Response Actions
Latest version.

  (a) The owner or operator of surface impoundment units subject to Subsection R315-265-221(a) shall develop and keep on site until closure of the facility a response action plan. The response action plan shall set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan shall describe the actions specified in Subsection R315-265-224(b).

  (b) If the flow rate into the leak detection system exceeds the action leakage rate for any sump, the owner or operator shall:

  (1) Notify the Director in writing of the exceedance within 7 days of the determination;

  (2) Submit a preliminary written assessment to the Director within 14 days of the determination, as to the amount of liquids, likely sources of liquids, possible location, size, and cause of any leaks, and short-term actions taken and planned;

  (3) Determine to the extent practicable the location, size, and cause of any leak;

  (4) Determine whether waste receipt should cease or be curtailed, whether any waste should be removed from the unit for inspection, repairs, or controls, and whether or not the unit should be closed;

  (5) Determine any other short-term and longer-term actions to be taken to mitigate or stop any leaks; and

  (6) Within 30 days after the notification that the action leakage rate has been exceeded, submit to the Director the results of the analyses specified in Subsections R315-265-224(b)(3), (4), and (5), the results of actions taken, and actions planned. Monthly thereafter, as long as the flow rate in the leak detection system exceeds the action leakage rate, the owner or operator must submit to the Director a report summarizing the results of any remedial actions taken and actions planned.

  (c) To make the leak, remediation or both determinations in Subsections R315-265-224(b)(3), (4), and (5), the owner or operator shall:

  (1)(i) Assess the source of liquids and amounts of liquids by source,

  (ii) Conduct a fingerprint, hazardous constituent, or other analyses of the liquids in the leak detection system to identify the source of liquids and possible location of any leaks, and the hazard and mobility of the liquid; and

  (iii) Assess the seriousness of any leaks in terms of potential for escaping into the environment; or

  (2) Document why such assessments are not needed.


R315-265-225. Surface Impoundments -- Waste Analysis and Trial Tests
Latest version.

  (a) In addition to the waste analyses required by Section R315-265-13, whenever a surface impoundment is to be used to:

  (1) Chemically treat a hazardous waste which is substantially different from waste previously treated in that impoundment; or

  (2) Chemically treat hazardous waste with a substantially different process than any previously used in that impoundment; the owner or operator shall, before treating the different waste or using the different process:

  (i) Conduct waste analyses and trial treatment tests, for example, bench scale or pilot plant scale tests; or

  (ii) Obtain written, documented information on similar treatment of similar waste under similar operating conditions; to show that this treatment will comply with Subsection R315-265-17(b).

  Comment: As required by Section R315-265-13, the waste analysis plan shall include analyses needed to comply with Sections R315-265-229 and 265-230. As required by Section R315-265-73, the owner or operator shall place the results from each waste analysis and trial test, or the documented information, in the operating record of the facility.


R315-265-226. Surface Impoundments -- Monitoring and Inspection
Latest version.

  (a) The owner or operator shall inspect:

  (1) The freeboard level at least once each operating day to ensure compliance with Section R315-265-222, and

  (2) The surface impoundment, including dikes and vegetation surrounding the dike, at least once a week to detect any leaks, deterioration, or failures in the impoundment.

  (b)(1) An owner or operator required to have a leak detection system under Subsection R315-265-221(a) shall record the amount of liquids removed from each leak detection system sump at least once each week during the active life and closure period.

  (2) After the final cover is installed, the amount of liquids removed from each leak detection system sump shall be recorded at least monthly. If the liquid level in the sump stays below the pump operating level for two consecutive months, the amount of liquids in the sumps shall be recorded at least quarterly. If the liquid level in the sump stays below the pump operating level for two consecutive quarters, the amount of liquids in the sumps shall be recorded at least semi-annually. If at any time during the post-closure care period the pump operating level is exceeded at units on quarterly or semi-annual recording schedules, the owner or operator shall return to monthly recording of amounts of liquids removed from each sump until the liquid level again stays below the pump operating level for two consecutive months.

  (3) "Pump operating level" is a liquid level proposed by the owner or operator and approved by the Director based on pump activation level, sump dimensions, and level that avoids backup into the drainage layer and minimizes head in the sump. The timing for submission and approval of the proposed "pump operating level" will be in accordance with Subsection R315-265-222(a).

  Comment: As required by Subsection R315-265-15(c), the owner or operator shall remedy any deterioration or malfunction he finds.


R315-265-228. Surface Impoundments -- Closure and Post-Closure Care
Latest version.

  (a) At closure, the owner or operator shall:

  (1) Remove or decontaminate all waste residues, contaminated containment system components, liners, etc., contaminated subsoils, and structures and equipment contaminated with waste and leachate, and manage them as hazardous waste unless Subsection R315-261-3(d) applies; or

  (2) Close the impoundment and provide post-closure care for a landfill under Sections R315-265-110 through 265-121 and 40 CFR 265.310, which is adopted and incorporated by reference, including the following:

  (i) Eliminate free liquids by removing liquid wastes or solidifying the remaining wastes and waste residues;

  (ii) Stabilize remaining wastes to a bearing capacity sufficient to support the final cover; and

  (iii) Cover the surface impoundment with a final cover designed and constructed to:

  (A) Provide long-term minimization of the migration of liquids through the closed impoundment;

  (B) Function with minimum maintenance;

  (C) Promote drainage and minimize erosion or abrasion of the cover;

  (D) Accommodate settling and subsidence so that the cover's integrity is maintained; and

  (E) Have a permeability less than or equal to the permeability of any bottom liner system or natural subsoils present.

  (b) In addition to the requirements of Sections R315-265-110 through R315-265-121, and 40 CFR 265.310, which is adopted and incorporated by reference, during the post-closure care period, the owner or operator of a surface impoundment in which wastes, waste residues, or contaminated materials remain after closure in accordance with the provisions of Subsection R315-265-228(a)(2)shall:

  (1) Maintain the integrity and effectiveness of the final cover, including making repairs to the cover as necessary to correct the effects of settling, subsidence, erosion, or other events;

  (2) Maintain and monitor the leak detection system in accordance with Subsections R315-264-221(c)(2)(iv) and (3) and Subsection R315-265-226(b) and comply with all other applicable leak detection system requirements of Rule R315-265;

  (3) Maintain and monitor the ground-water monitoring system and comply with all other applicable requirements of Sections R315-265-90 through 265-94; and

  (4) Prevent run-on and run-off from eroding or otherwise damaging the final cover.


R315-265-229. Surface Impoundments -- Special Requirements for Ignitable or Reactive Waste
Latest version.

  Ignitable or reactive waste shall not be placed in a surface impoundment, unless the waste and impoundment satisfy all applicable requirements of Rule R315-268, and:

  (a) The waste is treated, rendered, or mixed before or immediately after placement in the impoundment so that:

  (1) The resulting waste, mixture, or dissolution of material no longer meets the definition of ignitable or reactive waste under Sections R315-261-21 or R315-261-23; and

  (2) Subsection R315-265-17(b) is complied with; or

  (b)(1) The waste is managed in such a way that it is protected from any material or conditions which may cause it to ignite or react; and

  (2) The owner or operator obtains a certification from a qualified chemist or engineer that, to the best of his knowledge and opinion, the design features or operating plans of the facility will prevent ignition or reaction; and

  (3) The certification and the basis for it are maintained at the facility; or

  (c) The surface impoundment is used solely for emergencies.


R315-265-230. Surface Impoundments -- Special Requirements for Incompatible Wastes
Latest version.

  Incompatible wastes, or incompatible wastes and materials, see 40 CFR 265 appendix V, which is adopted and incorporated by reference for examples, shall not be placed in the same surface impoundment, unless Subsection R315-265-17(b) is complied with.


R315-265-231. Surface Impoundments -- Air Emission Standards
Latest version.

  The owner or operator shall manage all hazardous waste placed in a surface impoundment in accordance with the applicable requirements of 40 CFR 265 subparts BB and CC, which are adopted and incorporated by reference.


R315-265-250. Waste Piles-- Applicability
Latest version.

  The regulations in Sections R315-265-250 through R315-265-260 apply to owners and operators of facilities that treat or store hazardous waste in piles, except as Section R315-265-1 provides otherwise. Alternatively, a pile of hazardous waste may be managed as a landfill under 40 CFR subpart N.


R315-265-251. Waste Piles-- Protection from Wind
Latest version.

  The owner or operator of a pile containing hazardous waste which could be subject to dispersal by wind shall cover or otherwise manage the pile so that wind dispersal is controlled.


R315-265-252. Waste Piles-- Waste Analysis
Latest version.

  In addition to the waste analyses required by Section R315-265-13, the owner or operator shall analyze a representative sample of waste from each incoming movement before adding the waste to any existing pile, unless (1) The only wastes the facility receives which are amenable to piling are compatible with each other, or (2) the waste received is compatible with the waste in the pile to which it is to be added. The analysis conducted shall be capable of differentiating between the types of hazardous waste the owner or operator places in piles, so that mixing of incompatible waste does not inadvertently occur. The analysis shall include a visual comparison of color and texture.

  Comment: As required by Section R315-265-13, the waste analysis plan shall include analyses needed to comply with Sections R315-265-256 and 265-257. As required by Section R315-265-73, the owner or operator shall place the results of this analysis in the operating record of the facility.


R315-265-253. Waste Piles-- Containment
Latest version.

  If leachate or run-off from a pile is a hazardous waste, then either:

  (a)(1) The pile shall be placed on an impermeable base that is compatible with the waste under the conditions of treatment or storage;

  (2) The owner or operator shall design, construct, operate, and maintain a run-on control system capable of preventing flow onto the active portion of the pile during peak discharge from at least a 25-year storm;

  (3) The owner or operator shall design, construct, operate, and maintain a run-off management system to collect and control at least the water volume resulting from a 24-hour, 25-year storm; and

  (4) Collection and holding facilities, for example, tanks or basins, associated with run-on and run-off control systems shall be emptied or otherwise managed expeditiously to maintain design capacity of the system; or

  (b)(1) The pile shall be protected from precipitation and run-on by some other means; and

  (2) No liquids or wastes containing free liquids may be placed in the pile.

  Comment: If collected leachate or run-off is discharged through a point source to waters of the United States, it is subject to the requirements of section 402 of the Clean Water Act, as amended.


R315-265-254. Waste Piles-- Design and Operating Requirements
Latest version.

  The owner or operator of each new waste pile on which construction commences after January 29, 1992, each lateral expansion of a waste pile unit on which construction commences after July 29, 1992, and each such replacement of an existing waste pile unit that is to commence reuse after July 29, 1992 shall install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal systems, in accordance with Subsection R315-264-251(c), unless exempted under Subsections R315-264-251(d), (e), or (f); and shall comply with the procedures of Subsection R315-265-221(b). "Construction commences" is as defined in Section R315-260-10 under "existing facility".


R315-265-255. Waste Piles-- Action Leakage Rates
Latest version.

  (a) The owner or operator of waste pile units subject to Section R315-265-254 shall submit a proposed action leakage rate to the Director when submitting the notice required under Section R315-265-254. Within 60 days of receipt of the notification, the Director will: Establish an action leakage rate, either as proposed by the owner or operator or modified using the criteria in this Section R315-265-255; or extend the review period for up to 30 days. If no action is taken by the Director before the original 60 or extended 90 day review periods, the action leakage rate will be approved as proposed by the owner or operator.

  (b) The Director shall approve an action leakage rate for waste pile units subject to Section R315-265-254. The action leakage rate is the maximum design flow rate that the leak detection system (LDS) can remove without the fluid head on the bottom liner exceeding 1 foot. The action leakage rate shall include an adequate safety margin to allow for uncertainties in the design, for example, slope, hydraulic conductivity, thickness of drainage material, construction, operation, and location of the LDS, waste and leachate characteristics, likelihood and amounts of other sources of liquids in the LDS, and proposed response actions, for example, the action leakage rate shall consider decreases in the flow capacity of the system over time resulting from siltation and clogging, rib layover and creep of synthetic components of the system, overburden pressures, etc.

  (c) To determine if the action leakage rate has been exceeded, the owner or operator shall convert the weekly flow rate from the monitoring data obtained under Section R315-265-260, to an average daily flow rate, gallons per acre per day, for each sump. Unless the Director approves a different calculation, the average daily flow rate for each sump shall be calculated weekly during the active life and closure period.


R315-265-256. Waste Piles-- Special Requirements for Ignitable or Reactive Waste
Latest version.

  (a) Ignitable or reactive waste shall not be placed in a pile unless the waste and pile satisfy all applicable requirements of Rule R315-268, and:

  (1) Addition of the waste to an existing pile (i) results in the waste or mixture no longer meeting the definition of ignitable or reactive waste under Sections R315-261-21 or R315-261-23, and (ii) complies with Subsection R315-265-17(b); or

  (2) The waste is managed in such a way that it is protected from any material or conditions which may cause it to ignite or react.


R315-265-257. Waste Piles-- Special Requirements for Incompatible Wastes
Latest version.

  (a) Incompatible wastes, or incompatible wastes and materials, see 40 CFR 265 appendix V, which is adopted and incorporated by reference, for examples, shall not be placed in the same pile, unless Subsection R315-265-17(b) is complied with.

  (b) A pile of hazardous waste that is incompatible with any waste or other material stored nearby in other containers, piles, open tanks, or surface impoundments shall be separated from the other materials, or protected from them by means of a dike, berm, wall, or other device.

  Comment: The purpose of this is to prevent fires, explosions, gaseous emissions, leaching, or other discharge of hazardous waste or hazardous waste constituents which could result from the contact or mixing of incompatible wastes or materials.

  (c) Hazardous waste shall not be piled on the same area where incompatible wastes or materials were previously piled, unless that area has been decontaminated sufficiently to ensure compliance with Subsection R315-265-17(b).


R315-265-258. Waste Piles-- Closure and Post-Closure Care
Latest version.

  (a) At closure, the owner or operator shall remove or decontaminate all waste residues, contaminated containment system components, liners, etc., contaminated subsoils, and structures and equipment contaminated with waste and leachate, and manage them as hazardous waste unless Subsection R315-261-3(d) applies; or

  (b) If, after removing or decontaminating all residues and making all reasonable efforts to effect removal or decontamination of contaminated components, subsoils, structures, and equipment as required in Subsection R315-265-258(a), the owner or operator finds that not all contaminated subsoils can be practicably removed or decontaminated, he shall close the facility and perform post-closure care in accordance with the closure and post-closure requirements that apply to landfills, see 40 CFR 265.310.


R315-265-259. Waste Piles-- Response Actions
Latest version.

  (a) The owner or operator of waste pile units subject to Section R315-265-254 shall develop and keep on-site until closure of the facility a response action plan. The response action plan shall set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan shall describe the actions specified in Subsection R315-265-259(b).

  (b) If the flow rate into the leak determination system exceeds the action leakage rate for any sump, the owner or operator shall:

  (1) Notify the Director in writing of the exceedance within seven days of the determination;

  (2) Submit a preliminary written assessment to the Director within 14 days of the determination, as to the amount of liquids, likely sources of liquids, possible location, size, and cause of any leaks, and short-term actions taken and planned;

  (3) Determine to the extent practicable the location, size, and cause of any leak;

  (4) Determine whether waste receipts should cease or be curtailed, whether any waste should be removed from the unit for inspection, repairs, or controls, and whether or not the unit should be closed;

  (5) Determine any other short-term and longer-term actions to be taken to mitigate or stop any leaks; and

  (6) Within 30 days after the notification that the action leakage rate has been exceeded, submit to the Director the results of the analyses specified in Subsections R315-265-259(b)(3), (4), and (5), the results of actions taken, and actions planned. Monthly thereafter, as long as the flow rate in the leak detection system exceeds the action leakage rate, the owner or operator shall submit to the Director a report summarizing the results of any remedial actions taken and actions planned.

  (c) To make the either the leak or remediation or both determinations in Subsections R315-265-259(b)(3), (4), and (5), the owner or operator shall:

  (1)(i) Assess the source of liquids and amounts of liquids by source,

  (ii) Conduct a fingerprint, hazardous constituent, or other analyses of the liquids in the leak detection system to identify the source of liquids and possible location of any leaks, and the hazard and mobility of the liquid; and

  (iii) Assess the seriousness of any leaks in terms of potential for escaping into the environment; or

  (2) Document why such assessments are not needed.


R315-265-260. Waste Piles-- Monitoring and Inspection
Latest version.

  An owner or operator required to have a leak detection system under Section R315-265-254 shall record the amount of liquids removed from each leak detection system sump at least once each week during the active life and closure period.