Utah Administrative Code (Current through November 1, 2019) |
R309. Environmental Quality, Drinking Water |
R309-600. Source Protection: Drinking Water Source Protection For Ground-Water Sources |
R309-600-13. New Ground-water Sources of Drinking Water
-
(1) Prior to constructing a new ground-water source of drinking water, each PWS shall develop a PER which demonstrates whether the source meets the requirements of this section and submit it to DDW. Additionally, engineering information in accordance with R309-515-6(5)(a) or R309-515-7(4) must be submitted to DDW. The Director will not grant plan approval until both source protection and engineering requirements are met. Construction standards relating to protection zones and management areas (fencing, diversion channels, sewer line construction, and grouting, etc.) are found in R309-515. After the source is constructed a DWSP Plan must be developed, submitted, and implemented accordingly.
(2) Preliminary Evaluation Report for New Sources of Drinking Water - PERs shall cover all four zones or the entire management area. PERs should be developed in accordance with the "Standard Report Format for New Wells and Springs." This document may be obtained from DDW. PWSs shall include the following four sections in each PER:
(a) Delineation Report for Estimated DWSP Zones - The same requirements apply as in R309-600-9(6), except that the hydrogeologic data for the PER must be developed using the best available data which may be obtained from: surrounding wells, published information, or surface geologic mapping. PWSs must use the Preferred Delineation Procedure to delineate protection zones for new wells. The Delineation Report for Estimated DWSP Zones shall be stamped and signed by a professional geologist or professional engineer unless the Optional Two-Mile Radius Delineation Procedure is used for a new spring.
(b) Inventory of Potential Contamination Sources and Identification and Assessment of Controls - The same requirements apply as in R309-600-10(1) and (2). Additionally, the PER must demonstrate that the source meets the following requirements:
(i) Protection Areas Delineated using the Preferred Delineation Procedure in Protected Aquifers - A PWS shall not locate a new ground-water source of drinking water where an uncontrolled potential contamination source or a pollution source exists within zone one.
(ii) Protection Areas Delineated using the Preferred Delineation Procedure in Unprotected Aquifers - A PWS shall not locate a new ground-water source of drinking water where an uncontrolled potential contamination source or an uncontrolled pollution source exists within zone one. Additionally, a new ground-water source of drinking water may not be located where a pollution source exists within zone two unless the pollution source implements design standards which prevent contaminated discharges to ground water.
(iii) Management Areas Delineated using the Optional Two-Mile Radius Delineation Procedure - A PWS shall not locate a new spring where an uncontrolled potential contamination source or a pollution source exists within zone one. Additionally, a new spring may not be located where a pollution source exist within the management area unless: a hydrogeologic report in accordance with R309-600-9(6)(b)(ii) which verifies that it does not impact the spring; or the pollution source implements design standards which prevent contaminated discharges to ground water.
(c) Land Ownership Map - A land ownership map which includes all land within zones one and two or the entire management area. Additionally, include a list which exclusively identifies the land owners in zones one and two or the management area, the parcel(s) of land which they own, and the zone in which they own land. A land ownership map and list are not required if ordinances are used to protect these areas.
(d) Land Use Agreements, Letters of Intent, or Zoning Ordinances - Land use agreements which meet the requirements of the definition in R309-600-6(1)(p). Zoning ordinances which are already in effect or letters of intent may be substituted for land use agreements; however, they must accomplish the same level of protection that is required in a land use agreement. Letters of intent must be notarized, include the same language that is required in land use agreements, and contain the statement that "the owner agrees to record the land use agreement in the county recorder's office, if the source proves to be an acceptable drinking water source." The PWS shall not introduce a new source into its system until copies of all applicable recorded land use agreements are submitted to DDW.
(3) Sewers Within DWSP Zones and Management Areas - Sewer lines may not be located within zones one and two or a management area unless the criteria identified below are met. If sewer lines are located or planned to be located within zones one and two or a management area, the PER must demonstrate that they comply with these criteria. Sewer lines that comply with these criteria may be assessed as adequately controlled potential contamination sources.
(a) Unprotected Aquifers -
(i) Zone one- all sewer lines and laterals shall be at least 50 feet from the wellhead or margin of the collection area, and be constructed in accordance to R309-515-6.
(ii) Zone two- all sewer lines and laterals within zone two or a management area shall be constructed in accordance with R309-515-6.
(b) Protected Aquifers - in zone one all sewer lines and laterals shall be constructed in accordance with R309-515-6, and shall be at least 10 feet from the wellhead or margin of the collection area.
(4) Use waivers for the VOC and pesticide parameter groups may be issued if the inventory of potential contamination sources indicates that the chemicals within these parameter groups are not used, disposed, stored, transported, or manufactured within zones one, two, and three or the management area.
(5) Replacement Wells - A PER is not required for proposed wells, if the PWS receives written notification from the Director that the well is classified as a replacement well. The PWS must submit a letter requesting that the well be classified as a replacement well and include documentation to show that the conditions required in R309-600-6(1)(y) are met. If a proposed well is classified as a replacement well, the PWS is still required to submit and obtain written approval for all other information as required in:
(a) DWSP Plan for New Sources of Drinking Water (refer to R309-600-13(6), and
(b) the Outline of Well Approval Process (refer to R309-515-6(5)).
(6) DWSP Plan for New Sources of Drinking Water - The PWS shall submit a DWSP Plan in accordance with R309-600-7(1) for any new ground-water source of drinking water within one year after the date of the Director's concurrence letter for the PER. In developing this DWSP Plan, PWSs shall refine the information in the PER by applying any new, as-constructed characteristics of the source (i.e., pumping rate, aquifer test, etc.).