R317-1-2. General Requirements  


Latest version.
  • 2.1 Water Pollution Prohibited. No person shall discharge wastewater or deposit wastes or other substances in violation of the requirements of these rules.

    2.2 Construction Permit. No person shall make or construct any device for treatment or discharge of wastewater (including storm sewers) without first receiving a permit to do so from the Director or its authorized representative, except as provided herein.

    A. Body Politic Required. A permit for construction of a new treatment works or a sewerage system, or modifications to an existing treatment works or sewerage system for multiple units under separate ownership will be issued only if the treatment works or sewerage system are under the sponsorship of a body politic as defined in R317-1-1.

    B. Submission of Plans. Any person desiring a permit shall submit complete plans, specifications, and other pertinent documents covering the proposed construction to the Director for review. Liquid waste storage facilities at animal feeding operations must be designed and constructed in accordance with Table 2a - Criteria for Siting, Investigation, and Design of Liquid Waste Storage Facilities with a water depth greater than 2 feet; Table 2b - Criteria for Siting, Investigation, and Design of Liquid Waste Storage Facilities with a water depth of 2 feet or less; and Table 2c - Criteria for runoff ponds with a water depth of 2 feet of less and a storage period less than 90 days annually, contained in the U.S.D.A. Natural Resource Conservation Service (NRCS) Conservation Practice Standard, Waste Storage Facility, Code 313, dated August 2006. This rule incorporates by reference Tables 2a, 2b, and 2c in the August 2006 U.S.D.A. NRCS Conservation Practice Standard, Waste Storage Facility, Code 313.

    C. Review of Plans. The Division shall review said plans and specifications as to their adequacy of design for the intended purpose and shall require such changes as are found necessary to assure compliance with pertinent parts of these rules.

    D. Approval of Plans. Issuance of a construction permit shall be construed as approval of plans for the purposes of authorizing release of federal or state funds allocated for planning or construction purposes.

    E. Permit Expiration. Construction permits shall expire one year after date of issuance unless substantial and continuous construction is under way. Upon application, construction permits may be extended on an individual basis provided application for such extension is made prior to the permit expiration date.

    F. Exceptions.

    1. Wastewater facilities that discharge to an existing sewer system and serve only units that are under single ownership, or serve multiple units under separate ownership where the wastewater facilities are under the sponsorship of the public sewer system to which they discharge. This exception does not apply to pumping stations having the installed capacity in excess of 1 million gallons per day (3,785 cubic meters per day).

    2. Onsite Wastewater Disposal Systems. Construction plans and specifications for onsite wastewater disposal systems shall be submitted to the local health authority having jurisdiction and need not be submitted to the Division. Such devices, in any case, shall be constructed in accordance with rules for onsite wastewater disposal systems adopted by the Water Quality Board. Compliance with the rules shall be determined by an on-site inspection by the appropriate health authority.

    3. Small Animal Waste (Manure) Lagoons and Runoff Ponds. Construction plans and specifications for small animal waste lagoons as defined in R317-6 (permitted by rule for ground water permits) need not be submitted to the Division if the design is prepared or certified by the U.S.D.A. Natural Resources Conservation Service (NRCS) in accordance with criteria provided for in the Memorandum of Agreement between the Division and the NRCS, and the construction is inspected by the NRCS. Compliance with these rules shall be determined by on-site inspection by the NRCS.

    2.3 Compliance with Water Quality Standards. No person shall discharge wastes into waters of the state except in compliance with these rules and under circumstances which assure compliance with water quality standards in R317-2.

    2.4 Operation of Wastewater Treatment Works. Wastewater treatment works shall be so operated at all times as to produce effluents meeting all requirements of these rules and otherwise in a manner consistent with adequate protection of public health and welfare. Complete daily records shall be kept of the operation of wastewater treatment works covered under R317-3 on forms approved by the Division and a copy of such records shall be forwarded to the Division at monthly intervals.