R746-210-3. Exemptions Requiring a Cost-Effectiveness Test  


Latest version.
  • Cases not covered under "automatic exemptions" will be granted an exemption if the benefit-to-cost ratio is less than one (1) with respect to separate metering using the cost effectiveness test guidelines described below. The burden of proof rests with the person requesting exemption and the evidence required to sustain that burden must demonstrate that the long-run benefits of individual metering to the electric consumer are less than the costs of purchasing and installing separate meters. Written requests to the utility for an exemption will be given consideration based upon the following criteria and conditions:

    A. "New buildings" shall be defined as those structures or mobile home parks for which a building permit is obtained on or after August 1, 1984, or, if no permit is required, for which construction is commenced on or after August 1, 1984. Construction is defined to begin when footings are poured.

    B. The benefits shall be quantified in dollars of savings and shall reflect the difference in electricity use which results when separate metering is utilized rather than master-metering. The lump sum savings shall reflect a present worth analysis using as a discount rate the percentage interest rate of long-term debt such as the utility's latest long-term bond issue, or a mortgage rate, and a period equal to the estimated life of the building. Such analysis, including its preparation and expense, shall be the sole responsibility of the customer.

    C. The customer's determination of benefit shall be based on electric service supplied by the utility at electric service rates and regulations approved by the Commission, including but not limited to, regulations that prohibit resale of electric service to any other person or entity unless taking service under rate schedules that specifically provide for reselling.

    D. The cost shall be quantified in dollars and shall reflect the current difference in installed cost between master and individual metering. The lump sum differential cost reflecting the purchase and installation of separate meters versus a single meter shall be prepared by the utility. The preparation of the differential costs of meter bases and building wiring shall be the sole responsibility of the customer; and

    E. The benefit-to-cost ratio shall equal the present worth of benefits described in paragraph (b) divided by the current (present worth) costs described in paragraph (d).