(1) Priority Determination.
The Board may, at its option, modify a project's priority rating based on the following considerations:
(a) The project plans, specifications, contract, financing, etc., of a lesser-rated project are ready for execution.
(b) Available funding.
(c) Acute health risk.
(d) Capacity Development (financial, technical, or managerial issues needing resolution to avoid EPA intervention).
(e) An Emergency.
The Board will utilize Table 1 to prioritize loan applicants as may be modified by (a), (b), (c), or (d) above.
TABLE 1
Priority System
Deficiency Description Points
Received
Source Quality/Quantity
Health Risk (select one)
A. There is evidence that waterborne illnesses have
occurred. 25
B. There are reports of illnesses which may be waterborne. 20
C. High potential for waterborne illness exists. 15
D. Moderate potential for waterborne illness 8
E. No evidence of potential health risks 0
Compliance with SDWA (select all that apply)
A. Source has been determined to be under the influence of
surface water. 25
B. System is often out of water due to inadequate source
capacity. 20
-or-
System capacity does not meet the requirements of UPDWR. 10
C. Source has a history of three or more confirmed
microbiological violations within the last year. 10
D. Sources are not developed or protected according 10
to UPDWR.
E. Source has confirmed MCL chemistry violations within
the last year. 10
Total 100
Treatment
Points
Deficiency Description Available
Health Risk/Compliance with SDWA (select all that apply)
A. Treatment system cannot consistently meet log removal
requirements, turbidity standards, or other
enforceable drinking water quality standards. 25
B. The required disinfection facilities are not
installed, are inadequate, or fail to provide adequate
water quality. 25
C. Treatment system is subject to impending failure, 25
or has failed.
-or-
Treatment system equipment does not meet demands 20
of UPDWR including the lead and/or copper action levels.
-or-
System equipment is projected to become inadequate 5
without upgrades.
Total 75
Storage
Points
Deficiency Description Available
Health Risk / Compliance with SDWA (select all that apply)
A. Storage system is subject to impending failure, or has 25
failed.
-or-
System is old, cannot be easily cleaned, or subject 15
to contamination.
B. Storage system is inadequate for existing demands. 20
-or-
Storage system demand exceeds 90% of storage capacity. 10
C. Applicable contact time requirements cannot be met
without an upgrade. 15
D. System suffers from low static pressures. 15
Total 75
Distribution
Points
Deficiency Description Available
Health Risk/Compliance with SDWA (select all that apply)
A. Distribution system equipment is deteriorated or 20
inadequate for existing demands.
-or-
Distribution system is inadequate to meet 5 year 10
projected demands.
B. Applicable disinfectant residual maintenance 20
requirements are not met or high backflow contamination
potential exists.
C. Project will replace pipe containing unsafe materials 15
(lead, asbestos, etc).
D. Minimum dynamic pressure requirements are not met. 10
E. System experiences a heavy leak rate in the 10
distribution lines.
Total 75
Emergencies
Upon the Board finding of an emergency as required by
R309-705-9. Total 100
Priority Rating = (Average Points Received) x (Rate Factor) x (AGI Factor)
Where:
* Rate Factor = (Average System Water Bill/Average State
Water Bill)
** AGI Factor = (State Median AGI/System Median AGI)
(2) Financial Assistance Determination. The amount and type of financial assistance offered will be based upon the criteria shown in Table 2. As determined by Board resolution, disadvantaged communities may also receive zero-percent loans, or other financial assistance as described herein.
Effective rate calculation methods will be determined by Board resolution from time to time, using the Revenue Bond Buyer Index (RBBI)as a basis point, the points assigned in Table 2, and a method to reduce the interest rate from a recent RBBI rate down to a potential minimum of zero percent. To encourage rapid repayment of a loan the Board will increase the interest rate 0.02 per cent (0.02%) for each year the repayment period exceeds five (5.0) years.
TABLE 2
INTEREST, HARDSHIP GRANT FEE AND OTHER FEES REDUCTION FACTORS
POINTS
1. COST EFFECTIVENESS RATIO (SELECT ONE)
A. Project cost $0 to $500 per benefitting
connection 16
B. $501 to $1,500 14
C. $1,501 to $2,000 11
D. $2,001 to $3,000 8
E. $3,001 to $5,000 4
F. $5,001 to $10,000 1
G. Over $10,000 0
2. CURRENT LOCAL MEDIAN ADJUSTED GROSS INCOME (AGI) (SELECT ONE)
A. Less than 70% of State Median AGI 19
B. 71 to 80% of State Median AGI 16
C. 81 to 95% of State Median AGI 13
D. 96 to 110% of State Median AGI 9
E. 111 to 130% of State Median AGI 6
F. 131 to 150% of State Median AGI 3
G. Greater than 150% of State Median AGI 0
3. APPLICANT'S COMMITMENT TO PROJECT
PROJECT FUNDING CONTRIBUTED BY APPLICANT (SELECT ONE)
A. Greater than 25% of project funds 17
B. 15 to 25% of project funds 14
C. 10 to 15% of project funds 11
D. 5 to 10% of project funds 8
E. 2 to 5% of project funds 4
F. Less than 2% of project funds 0
4. ABILITY TO REPAY LOAN:
4. WATER BILL (INCLUDING TAXES) AFTER PROJECT IS
BUILT RELATIVE TO LOCAL MEDIAN ADJUSTED GROSS
INCOME (SELECT ONE)
A. Greater than 2.50% of local median AGI 16
B. 2.01 to 2.50% of local median AGI 12
C. 1.51 to 2.00% of local median AGI 8
D. 1.01 to 1.50% of local median AGI 3
E. 0 to 1.00% of local median AGI 0
5. SPECIAL INCENTIVES: Applicant (SELECT ALL THAT APPLY.)
A. Has a replacement fund receiving annual deposits
of about 5% of the system's annual drinking water
(DW) budget and fund has already accumulated a
minimum of 10% of said annual DW budget in
this reserve fund. 5
B. Has, in addition to item 5.A., accumulated an
amount equal to at least 20% of its annual DW
budget in its replacement fund. 5
C. Is creating or enhancing a regionalization plan 16
D. Has a rate structure encouraging conservation 6
TOTAL POSSIBLE POINTS FOR FINANCIAL NEED 100