R23-5-7. Use of Statewide Contingency Reserve  


Latest version.
  • (1) The Statewide Contingency Reserve may provide additional funding to a project when:

    (a) necessary construction costs arise on projects after the construction has been bid;

    (b) costs for other elements of a project exceed the amount budgeted; or

    (c) necessary costs arise which were not budgeted for.

    (2) As previously directed by the Legislature, unbudgeted costs included in Subsection R23-5-6(1)(c) may include legal services, insurance, surveys, testing and inspection, and bidding costs.

    (3) The Statewide Contingency Reserve may be used to fund changes in scope only if the scope change is necessary for the proper functioning of the program that was provided for in the approved project scope. The Division shall take steps as necessary to minimize the utilization of the Statewide Contingency Reserve for scope changes.

    (4) With the prior approval of the Board, the Statewide Contingency Reserve may be used to fund unanticipated costs on projects funded through Non-appropriated Funds.