R651-700-9. Right-Of-Way (ROW), Easements, Special Use Leases, and/or Special Use Permit  


Latest version.
  • (1) The Division may enter into real property transactions in order to fulfill its mission and legislative mandate.

    (2) Only the Division Director or Deputy Director, if designated, is authorized to sign closing papers, real property contracts, and/or deeds.

    (3) Potential applicants for ROW, Easements, Special Use Lease, Special Use Permit may contact the park manager or regional manager prior to making a formal application to the Lands and Environmental Coordinator.

    (4) To apply for a ROW, Easement, Special Use Lease a person shall:

    (a) Complete and submit an application provided by the Division to the Lands and Environmental Coordinator, unless it is an application for a Special Use Permit, in which case it shall be submitted to the appropriate park manager;

    (b) Pay a non-refundable application fee;

    (c) If for the purpose of construction or occupancy, submit the application and application fee at least 120 days prior to the proposed construction or occupancy date, unless otherwise specified by rule;

    (d) Provide a map, aerial photograph, or other guide to the project area. Map scale may be larger but must identify township and range sections, UTM coordinates, and give appropriate scale.

    (i) Anyone desiring to perform a survey on Division Land with the intent of filing an application for an ROW, Easement or Special Use Lease shall prior to entry for surveying activities, file with the agency an application for a Special Use Permit. The permit shall include a description of the proposed survey project, including the purpose, general location, and potential resource disturbances of the proposed survey. The appropriate park manager or his delegate shall review the application.

    (e) Provide evidence of an ownership or leasehold interest in the estate where development of that estate is the purpose for applicants seeking a ROW or Easement.

    (f) Include a project plan with the following information:

    (i) Project alternatives, including alternatives not affecting the Division;

    (ii) Project alternatives not affecting Division Land which were considered but rejected, and the specific reasons those alternatives were rejected;

    (iii) A description of the proposed activity, structures, and/or infrastructure, including site location, construction footprint, above and below ground construction, infrastructure's functional relationship to existing or future infrastructure, etc. the description shall be sufficiently detailed as to provide an accurate and complete representation of the proposed actions;

    (iv) Identification of adverse impacts to public recreation and scenic values associated with the proposed use and how they shall be avoided, minimized, or mitigated;

    (v) Other essential information required by the Lands and Environmental Coordinator and/or the Division.

    (5) Upon receiving the application, application fee, and the information required in Subsection (4) above, the Lands and Environmental Coordinator may either deny the application or grant a conditional approval within 60 days.

    (6) If the application is denied, the Lands and Environmental Coordinator shall provide a written notice to the applicant.

    (7) Before final approval is granted the Division may require the applicant to provide the following additional information:

    (a) A certified copy of a survey of the area affected by the proposed project prepared by a licensed surveyor. A centerline survey describing the proposed ROW and its width is adequate for a pipeline, road, power line, or similar use.

    (b) An electronic file depicting the Easement, ROW or Special Use Lease Area that is compatible with, and requires no editing fork accurate downloading into geographic systems information software used by the Division.

    (c) Evidence that the applicant had given the State Historic Preservation Officer a reasonable opportunity to review and comment on the proposed project as required by Utah Code Section 9-8-404.

    (d) An impact assessment analyzing the potential direct, indirect, and cumulative effects the proposed project may have on public recreation opportunities, scenic values, wildlife, and wildlife habitat.

    (e) A survey of threatened, endangered and candidate plant and animal species. Utah wildlife sensitive species, and Utah species of special concern conducted on and adjacent to the proposed project.

    (f) Proof that the applicant has secured all the permits and authorizations required for the project under State, Federal and local laws.

    (g) Proof that the applicant has complied with the provisions of the National Environmental Policy Act, where applicable, including preparation of all environmental assessments, environmental impact statements, or other reports required by the administering federal agency.

    (h) A survey of the project to determine if wetlands shall be impacted. The project applicant is responsible for obtaining all federal Clean Water Act Section 404 permits. If wetlands are found, the applicant must provide sufficient mitigation to offset any damage to the wetland area.