R315-264-575. Closure  


Latest version.
  •   (a) At closure, the owner or operator shall remove or decontaminate all waste residues, contaminated containment system components, pad, liners, etc., contaminated subsoils, and structures and equipment contaminated with waste and leakage, and manage them as hazardous waste.

      (b) If, after removing or decontaminating all residues and making all reasonable efforts to effect removal or decontamination of contaminated components, subsoils, structures, and equipment as required in Subsection R315-264-575(a), the owner or operator finds that not all contaminated subsoils can be practicably removed or decontaminated, he shall close the facility and perform post-closure care in accordance with closure and post-closure care requirements that apply to landfills, Section R315-264-310. For permitted units, the requirement to have a permit continues throughout the post-closure period. In addition, for the purpose of closure, post-closure, and financial responsibility, such a drip pad is then considered to be landfill, and the owner or operator shall meet all of the requirements for landfills specified in Sections R315-264-110 through 120 and 140 through 151.

      (c)(1) The owner or operator of an existing drip pad, as defined in Section R315-264-570, that does not comply with the liner requirements of Subsection R315-264-573(b)(1) shall:

      (i) Include in the closure plan for the drip pad under Section R315-264-112 both a plan for complying with Subsection R315-264-575(a) and a contingent plan for complying with Subsection R315-264-575(b) in case not all contaminated subsoils can be practicably removed at closure; and

      (ii) Prepare a contingent post-closure plan under Section R315-264-118 for complying with Subsection R315-264-575(b) in case not all contaminated subsoils can be practicably removed at closure.

      (2) The cost estimates calculated under Sections R315-264-112 and 144 for closure and post-closure care of a drip pad subject to Subsection R315-264-575(c) shall include the cost of complying with the contingent closure plan and the contingent post-closure plan, but are not required to include the cost of expected closure under Subsection R315-264-575(a).