Utah Administrative Code (Current through November 1, 2019) |
R309. Environmental Quality, Drinking Water |
R309-705. Financial Assistance: Federal Drinking Water State Revolving Fund (SRF) Loan Program |
R309-705-7. Project Authorization
-
A project may receive written authorization for financial or technical assistance from the Board following submission and favorable review of an application form, engineering report (if required), capacity development (including financial capability) assessment and staff feasibility report. The engineering report shall include a cost effective analysis of feasible project alternatives capable of meeting State and Federal drinking water requirements. It shall include consideration of monetary costs including the present worth or equivalent annual value of all capital costs, operation, maintenance, and replacement costs. The alternative selected must be the most economical means of meeting applicable State and Federal drinking water requirements over the useful life of the facility while recognizing environmental and other nonmonetary considerations.
Once the application submittals are reviewed, the staff will prepare a project feasibility report for the Board's consideration in Authorizing a project. The project feasibility report will include an evaluation of the project with regard to the Board's funding priority criteria, and will contain recommendations for the type of financial assistance which may be extended (i.e., for a loan, credit enhancement agreement, or interest buy-down agreement).
The Board may authorize financial assistance for any work or facility to provide water for human consumption and other domestic uses. Generally, work means planning, engineering design, or other eligible activities defined elsewhere in these rules.
Project Authorization is conditioned upon the availability of funds at the time of loan closing or signing of the credit enhancement, or interest buy-down and upon adherence to the project schedule approved at that time. The Board, at its own discretion, may require the Applicant to enter into a "Commitment Agreement" with the Board prior to execution of final loan documents or closing of the loan. This Commitment Agreement or Binding Commitment may specify date(s) by which the Applicant must complete the requirements set forth in the Project Authorization Letter. The Commitment Agreement shall state that if the Department of Environmental Quality acting through the Drinking Water Board is unable to make the Loan by the Loan Date, this Agreement shall terminate without any liability accruing to the Department or the Applicant hereunder. Also, if the project does not proceed according to the project schedule, the Board may withdraw project Authorization, so that projects which are ready to proceed can obtain necessary funding. Extensions to the project schedule may be considered by the Board, but any extension requested must be fully justified.