R655-11-4C. Spillways
-
In designing the spillway for a dam to pass the IDF, the State Engineer will consider the use of a principal spillway in conjunction with emergency spillways. The principal spillway must be designed so that no structural damage will occur during passage of the IDF. Emergency spillways, including Fuse Plug Spillways, may be designed so that some damage may be expected during use provided the anticipated damage does not represent a threat to the dam. Sunny day failure modeling of Fuse Plug Spillways may be required to determine if they are creating an additional unacceptable risk. Overtopping of the dam will not be considered as an emergency spillway on earthfill dams, unless it can be demonstrated that the dam is protected from erosion, and the duration of overtopping will not saturate the dam and reduce its stability.