Utah Administrative Code (Current through November 1, 2019) |
R655. Natural Resources, Water Rights |
R655-11. Requirements for the Design, Construction and Abandonment of Dams |
R655-11-10D. Seepage Measurements
Latest version.
-
Seepage measurements for all drains and collection pipes should be provided, as outlined in R655-11-6E, for all high and moderate hazard dams. Any significant seepage areas which develop must be provided with measuring devices and at the discretion of the State Engineer, must be collected in a filtered drainage system.