R647-4-117. Notification of Suspension or Termination of Operations  


Latest version.
  • 1. The operator need not notify the Division of the temporary suspension of mining operations.

    2. In the case of a termination or a suspension of mining operations that has exceeded, or is expected to exceed two (2) years, the operator shall, upon request, furnish the Division with such data as it may require to evaluate the status of the mining operation, the status of compliance with these rules, and the probable future status of the land affected. Upon review of such data, the Division will take such action as may be appropriate. The Division may grant an extended suspension period if warranted by a showing of good cause by the operator.

    3. The operator shall give the Division prompt written notice of a termination or suspension of large mining operations expected to exceed five (5) years. Upon receipt of notification, the Division shall, within 30 days, make an inspection of the property.

    4. Large mining operations that have been approved for an extended suspension period will be reevaluated on a regular basis. Additional interim reclamation or stabilization measures may be required in order for a large mining operation to remain in a continued state of suspension. Reclamation of a large mining operation may be required after five (5) years of continued suspension. The Division will require complete reclamation of the mine site when the suspension period exceeds 10 years, unless the operator appeals to the Board prior to the expiration of the 10-year period and shows good cause for a longer suspension period.