R647-4-110. Reclamation Plan  


Latest version.
  • Each notice of intention shall include a reclamation plan, including maps or drawings as necessary, consisting of a narrative description of the proposed reclamation including, but not limited to:

    1. A statement of the current land use and the proposed postmining land use for the disturbed area;

    2. A description of the manner and the extent to which roads, highwalls, slopes, impoundments, drainages, pits and ponds, piles, shafts and adits, drill holes, and similar structures will be reclaimed;

    3. A detailed description of any surface facilities to be left as part of the postmining land use, including but not limited to buildings, utilities, roads, pads, ponds, pits and surface equipment;

    4. A description of the treatment, location and disposition of any deleterious or acid-forming materials generated and left on-site, including a map showing the location of such materials upon the completion of reclamation;

    5. A planting program as best calculated to revegetate the disturbed area.

    5.11. Plans shall include, at a minimum, grading and/or stabilization procedures, topsoil replacement, seed bed preparation, seed mixture(s) and rate(s), and timing of seeding (fall seeding is preferred timing);

    5.12. Where there is no original protective cover, an alternate practical procedure must be proposed to minimize or control erosion or siltation.

    6. A statement that the operator will conduct reclamation as required by these rules.