R647-2-111. Surety  


Latest version.
  • 1. After receiving notification that the notice of intention is approved or complete, but prior to commencement of operations, the operator must post a reclamation surety with the Division.

    1.11. Failure to furnish and maintain reclamation surety may, after notice and opportunity for a Board hearing, result in a withdrawal of the notice of intention as provided for in Section 40-8-16.

    2. The Division will not require a separate surety where a reclamation surety in a form and amount acceptable to the Division is held by other governmental entities, provided that the cost estimate is accurate and the Division is named as co-beneficiary. Cooperative Agreements may be developed and entered into according to Section 40-8-22.

    3. As part of the review of the notice of intention, the Division shall determine the required surety amount based on:

    3.11. Site-specific calculations or estimates by the Division reflecting the cost the Division or a third party would incur to reclaim the site;

    3.12. Site-specific calculations or estimates by the operator reflecting the cost the Division or a third party would incur to reclaim the site, if accurate and verifiable by the Division; or

    3.13. The average dollars per acre costs for reclamation for similar operations, as determined by the Division, based upon approved surety amounts for current large mining operations.

    3.14. In determining or verifying the amount of surety under Subsections 3.11 or 3.12, the Division shall use cost data from current sureties for large mining operations, adjusted as necessary to reflect the nature and scope of operations and reclamation under the notice of intention.

    3.15. For the average dollars per acre in Subsection 3.13, the Board will annually approve the figure after a formal presentation from the Division and an opportunity for public comment.

    4. The operator shall submit a completed Reclamation Contract (FORM MR-RC) with the required surety. The form and amount of the reclamation surety must be approved by the Division. Acceptable forms may include:

    4.11. A corporate surety bond from a surety company that is licensed to do business in Utah, that is listed in "A.M. Best's Key Rating Guide" at a rating of A- or better or a Financial Performance Rating (FPR) of 8 or better, according to the "A.M. Best's Guide". All surety companies also will be continuously listed in the current issue of the U.S. Department of the Treasury Circular 570. Operators who do not have a surety bond with a company that meets the standards of subsection 4.11 will have 120 days from the date of Division notification after enactment of the changes to subsection 4.11 to achieve compliance or face enforcement action. When the Division in the course of examining surety bonds, notifies an operator that a surety company guaranteeing its performance does not meet the standards of subsection 4.11., the operator has 120 days after notice from the Division by mail to correct the deficiency, or face enforcement action;

    4.12. Federally-insured certificate of deposit payable to the State of Utah, Division of Oil, Gas and Mining;

    4.13. Cash;

    4.14. An irrevocable letter of credit issued by a bank organized to do business in the United States;

    4.15. Escrow accounts; and

    4.16. The Board may accept a written self-bonding agreement in the case of operators showing sufficient financial strength.

    5. Surety shall be required until such time as reclamation is deemed complete by the Division. The Division shall promptly conduct an inspection when notified by the operator that reclamation is complete. The full release of surety shall be evidence that the operator has reclaimed as required by the Act.

    5.11. A partial release of surety can be made by the Division if it determines that a substantial phase or segment of reclamation such as demolition, backfilling or regrading has been successfully performed and the residual amount of retained surety is determined to be adequate to insure completion of reclamation.