R315-319-1. Permit Required  


Latest version.
  •   (a) All landfills disposing of coal combustion residuals and surface impoundments containing coal combustion residuals shall have a permit for a Class I, II, or V landfill in accordance with Rules R315-302 through 307 or a coal combustion residuals permit issued under Rule R315-319.

      (b) An application for a permit for a coal combustion residual landfill or surface impoundment or multiple landfills and impoundments at a facility covered by one permit shall be made to the Director.

      (c)(1) An application for a permit a Coal Combustion Residue (CCR) unit shall contain the information required in Sections R315-319-60 through 107. No information need be submitted for which the effective date in Sections R315-319-60 through 107 has not been reached at the time of application submittal.

      (2) All information required in Sections R315-319-60 through 107 with an effective date that falls later that the application submittal required in Subsection R315-319-1(c)(1) shall be submitted within six months of the effective date of the requirement found in Sections R315-319-60 through 107.

      (d) Permit application procedures shall follow the requirements of Sections R315-310-1 and 2.

      (e) Permit transfers shall follow the procedures of Section R315-310-11.

      (f) Permit applicants shall follow the notification requirements of Subsection R315-310-3(2).

      (g) Permit approvals shall follow the requirements of Rule R315-311.

      (h) The Director approvals required in Sections R315-319-60 through 107 are satisfied by the issuance of a permit by the Director.