R315-310-6. Contents of a Permit Application for a New or Expanding Landtreatment Disposal Facility  


Latest version.
  • (1) Each application for a landtreatment disposal facility permit shall contain the information required in Section R315-310-3.

    (2) Each application for a permit shall also contain:

    (a) a geohydrological assessment of the facility site that addresses all of the factors of Subsection R315-310-4(2)(b);

    (b) engineering report, plans, specifications, and calculations that address:

    (i) how the proposed facility will meet the location standards pursuant to Section R315-302-1;

    (ii) how the proposed facility will meet the standards of Rule R315-307;

    (iii) the basis for calculating the facility's life;

    (iv) waste analyses and methods to periodically sample and analyze solid waste;

    (v) design of interim waste storage facilities;

    (vi) design of run-on and run-off control systems;

    (vii) a contour map of the active area showing contours to the nearest foot;

    (viii) a ground water and surface water monitoring program; and

    (ix) access barriers such as fences, gate, and warning signs.

    (c) a plan of operation that in addition to the requirements of Section R315-302-2 addresses:

    (i) operation and maintenance of run-on and run-off control systems;

    (ii) methods of taking ground water samples and for maintaining ground water monitoring systems; and

    (iii) methods of applying wastes to meet the requirements of Section R315-307-3.

    (d) closure plan to address:

    (i) closure schedule;

    (ii) capacity of site in volume and tonnage; and

    (iii) final inspection by regulatory agencies.

    (e) post-closure plan to address:

    (i) estimated time period for post-closure activities;

    (ii) site monitoring of ground water;

    (iii) changes in record of title;

    (iv) maintenance activities to maintain cover and run-off system;

    (v) plans for food-chain crops, if any, being grown on the active areas, after closure; and

    (vi) identification of final closure costs including cost calculations and the funding mechanism.