Utah Administrative Code (Current through November 1, 2019) |
R315. Environmental Quality, Waste Management and Radiation Control, Waste Management |
R315-310. Permit Requirements for Solid Waste Facilities |
R315-310-6. Contents of a Permit Application for a New or Expanding Landtreatment Disposal Facility
-
(1) Each application for a landtreatment disposal facility permit shall contain the information required in Section R315-310-3.
(2) Each application for a permit shall also contain:
(a) a geohydrological assessment of the facility site that addresses all of the factors of Subsection R315-310-4(2)(b);
(b) engineering report, plans, specifications, and calculations that address:
(i) how the proposed facility will meet the location standards pursuant to Section R315-302-1;
(ii) how the proposed facility will meet the standards of Rule R315-307;
(iii) the basis for calculating the facility's life;
(iv) waste analyses and methods to periodically sample and analyze solid waste;
(v) design of interim waste storage facilities;
(vi) design of run-on and run-off control systems;
(vii) a contour map of the active area showing contours to the nearest foot;
(viii) a ground water and surface water monitoring program; and
(ix) access barriers such as fences, gate, and warning signs.
(c) a plan of operation that in addition to the requirements of Section R315-302-2 addresses:
(i) operation and maintenance of run-on and run-off control systems;
(ii) methods of taking ground water samples and for maintaining ground water monitoring systems; and
(iii) methods of applying wastes to meet the requirements of Section R315-307-3.
(d) closure plan to address:
(i) closure schedule;
(ii) capacity of site in volume and tonnage; and
(iii) final inspection by regulatory agencies.
(e) post-closure plan to address:
(i) estimated time period for post-closure activities;
(ii) site monitoring of ground water;
(iii) changes in record of title;
(iv) maintenance activities to maintain cover and run-off system;
(v) plans for food-chain crops, if any, being grown on the active areas, after closure; and
(vi) identification of final closure costs including cost calculations and the funding mechanism.