R315-307-2. Standards for Design  


Latest version.
  • (1) The owner or operator of a landtreatment disposal facility shall design the facility to provide interim waste storage areas that meet the requirements for piles, as specified in Rule R315-314.

    (2) The facility shall have systems to collect and treat all run-off from a 25 year storm, and divert all run-on for the maximum flow of a 25 year storm around the active area.

    (3) The facility shall be designed to avoid standing water anywhere on the active area.

    (4) The facility shall be designed to avoid slopes and other features that will lead to soil and waste erosion, unless contour plowing or other measures are taken to avoid erosion.

    (5) The owner or operator shall monitor ground water according to Rule R315-308.

    (6) The owner or operator shall control access to the facility by fencing or other means and erect a sign as specified in Subsection R315-303-3(6)(d).