R315-270-71. Hazardous Waste Permit Program -- Operation During Interim Status  


Latest version.
  •   (a) During the interim status period the facility shall not:

      (1) Treat, store, or dispose of hazardous waste not specified in part A of the permit application;

      (2) Employ processes not specified in part A of the permit application; or

      (3) Exceed the design capacities specified in part A of the permit application.

      (b) Interim status standards. During interim status, owners or operators shall comply with the interim status standards at Rule R315-265.