R315-270-220. Hazardous Waste Permit Program -- How May I Transfer My Rap to a New Owner or Operator?  


Latest version.
  •   (a) If you wish to transfer your RAP to a new owner or operator, you shall follow the requirements specified in your RAP for RAP modification to identify the new owner or operator, and incorporate any other necessary requirements. These modifications do not constitute "significant" modifications for purposes of Section R315-270-170. The new owner/operator shall submit a revised RAP application no later than 90 days before the scheduled change along with a written agreement containing a specific date for transfer of RAP responsibility between you and the new permittees.

      (b) When a transfer of ownership or operational control occurs, you as the old owner or operator shall comply with the applicable requirements in Section R315-264-140 through 151 until the new owner or operator has demonstrated that he is complying with the requirements in Section R315-264-140 through 151. The new owner or operator shall demonstrate compliance with Section R315-264-140 through 151 within six months of the date of the change in ownership or operational control of the facility or remediation waste management site. When the new owner/operator demonstrates compliance with Section R315-264-140 through 151 to the Director, the Director shall notify you that you no longer need to comply with Section R315-264-140 through 151 as of the date of demonstration.