R315-264-54. Amendment of Contingency Plan  


Latest version.
  •   The contingency plan shall be reviewed, and immediately amended, if necessary, whenever:

      (a) The facility permit is revised;

      (b) The plan fails in an emergency;

      (c) The facility changes-in its design, construction, operation, maintenance, or other circumstances-in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;

      (d) The list of emergency coordinators changes; or

      (e) The list of emergency equipment changes.