R315-261-1055. Air Emission Standards: Sampling Connection Systems  


Latest version.
  •   (a) Each sampling connection system shall be equipped with a closed-purge, closed-loop, or closed-vent system. This system shall collect the sample purge for return to the process or for routing to the appropriate treatment system. Gases displaced during filling of the sample container are not required to be collected or captured.

      (b) Each closed-purge, closed-loop, or closed-vent system as required in Subsection R315-261-1055(a) shall meet one of the following requirements:

      (1) Return the purged process fluid directly to the process line;

      (2) Collect and recycle the purged process fluid; or

      (3) Be designed and operated to capture and transport all the purged process fluid to a material management unit that complies with the applicable requirements of Sections R315-261-1084 through1086 or a control device that complies with the requirements of Section R315-261-1060.

      (c) In-situ sampling systems and sampling systems without purges are exempt from the requirements of Subsections R315-261-1055(a) and (b).