R309-700-12. Project Authorization (Reference R309-700-4(4))  


Latest version.
  • A project may be "Authorized" for a loan, credit enhancement agreement, interest buy-down agreement, or hardship grant in writing by the Board following submission and favorable review of an application form, engineering report (if required), financial capability assessment, staff feasibility report, and capacity assessment (when determined to be beneficial for evaluating project feasibility). The engineering report shall include a cost effectiveness analysis of feasible project alternatives capable of meeting State and Federal drinking water requirements. It shall include consideration of monetary costs including the present worth or equivalent annual value of all capital costs, operation, maintenance, and replacement costs. The alternative selected must be the most economical means of meeting applicable State and Federal drinking water requirements over the useful life of the facility while recognizing environmental and other nonmonetary considerations. If it is anticipated that a project will be a candidate for financial assistance from the Board, the Staff should be contacted, and the plan of study for the engineering report (if required) should be approved before the planning is initiated.

    Once the application form and other related documents have been reviewed and assessments made, the staff will prepare a project feasibility report for the Board's consideration in Authorizing a project. The project feasibility report will include a detailed evaluation of the project with regard to the Board's funding priority criteria, and will contain recommendations for the type of financial assistance which may be extended (i.e., for a loan, credit enhancement agreement, interest buy-down agreement, or hardship grant).

    Project Authorization is not a contractual commitment and is conditioned upon the availability of funds at the time of loan closing or signing of the credit enhancement, interest buy-down, or grant agreement and upon adherence to the project schedule approved at that time. If the project is not proceeding according to the project schedule the Board may withdraw the project Authorization so that projects which are ready to proceed can obtain necessary funding. Extensions to the project schedule may be considered by the Board, but any extension requested must be fully justified.