R309-210-1. Purpose  


Latest version.
  • The purpose of this rule is to outline the monitoring requirements for public water systems with regard to their distribution systems.

    R309-210-2. Authority.

    R309-210-3. Definitions.

    R309-210-4. General distribution system monitoring requirements.

    R309-210-5. Microbiological Monitoring.

    R309-210-6. Lead and Copper Monitoring.

    R309-210-7. Asbestos Distribution System Monitoring.

    R309-210-8. Disinfection Byproducts - Stage 1 Requirements.

    R309-210-9. Disinfection Byproducts - Initial Distribution System Evaluations (IDSE).

    R309-210-10. Disinfection Byproducts - Stage 2 Requirements.