R307-405-18. Public Participation  


Latest version.
  • (1) Except as provided in (2), the provisions of 40 CFR 51.166(q)(1) and (2) are hereby incorporated by reference.

    (2) The phrase "within a specified time period" in 40 CFR 51.166(q)(1) shall be replaced with the phrase "within 30 days of receipt of the PSD permit application".