Utah Administrative Code (Current through November 1, 2019) |
R307. Environmental Quality, Air Quality |
R307-401. Permit: New and Modified Sources |
R307-401-5. Notice of Intent
-
(1) Except as provided in R307-401-9 through R307-401-17, any person subject to R307-401 shall submit a notice of intent to the director and receive an approval order prior to initiation of construction, modification or relocation. The notice of intent shall be in a format specified by the director.
(2) The notice of intent shall include the following information:
(a) A description of the nature of the processes involved; the nature, procedures for handling and quantities of raw materials; the type and quantity of fuels employed; and the nature and quantity of finished product.
(b) Expected composition and physical characteristics of effluent stream both before and after treatment by any control apparatus, including emission rates, volume, temperature, air pollutant types, and concentration of air pollutants.
(c) Size, type, and performance characteristics of any control apparatus.
(d) An analysis of best available control technology for the proposed source or modification. When determining best available control technology for a new or modified source in an ozone nonattainment or maintenance area that will emit volatile organic compounds or nitrogen oxides, the owner or operator of the source shall consider EPA Control Technique Guidance (CTG) documents and Alternative Control Technique documents that are applicable to the source. Best available control technology shall be at least as stringent as any published CTG that is applicable to the source.
(e) Location and elevation of the emission point and other factors relating to dispersion and diffusion of the air pollutant in relation to nearby structures and window openings, and other information necessary to appraise the possible effects of the effluent.
(f) The location of planned sampling points and the tests of the completed installation to be made by the owner or operator when necessary to ascertain compliance.
(g) The typical operating schedule.
(h) A schedule for construction.
(i) Any plans, specifications and related information that are in final form at the time of submission of notice of intent.
(j) Any additional information required by:
(i) R307-403, Permits: New and Modified Sources in Nonattainment Areas and Maintenance Areas;
(ii) R307-405, Permits: Major Sources in Attainment or Unclassified Areas (PSD);
(iii) R307-406, Visibility;
(iv) R307-410, Permits: Emissions Impact Analysis;
(v) R307-420, Permits: Ozone Offset Requirements in Davis and Salt Lake Counties; or
(vi) R307-421, Permits: PM10 Offset Requirements in Salt Lake County and Utah County.
(k) Any other information necessary to determine if the proposed source or modification will be in compliance with Title R307.
(3) Notwithstanding the exemptions in R307-401-9 through R307-401-16, any person that is subject to R307-403, R307-405, or R307-406 shall submit a notice of intent to the director and receive an approval order prior to initiation of construction, modification, or relocation.