R23-6-1. Purpose  


Latest version.
  • These rules implement Subsection 63A-5-103(1)(f) and 63A-5-206(8).

    It is the purpose of these rules to ensure that the state owned facilities shall be life cycle cost effective. To achieve this objective, Value Engineering and Life Cycle Cost Analysis is to be used in the facility design process by the Division of Facilities Construction and Management.