R156-22-102. Definitions  


Latest version.
  •   In addition to the definitions in Title 58, Chapters 1, 3a and 22, as used in Title 58, Chapters 1, 3a and 22, or this rule:

      (1) "Complete and final", as used in Section 58-22-603, means "complete construction plans" as defined in Subsection 58-22-102(3).

      (2) "Direct supervision", as used in Subsection 58-22-102(10), means "supervision" as defined in Subsection 58-22-102(16).

      (3) "Employee, subordinate, associate, or drafter of a licensee", as used in Subsections 58-22-102(16), 58-22-603(1)(b) and this rule, means one or more individuals not licensed under this chapter, who are working for, with, or providing professional engineering, professional structural engineering, or professional land surveying services directly to and under the supervision of a person licensed under this chapter.

      (4) "Engineering surveys", as used in Subsection 58-22-102(9), include all survey activities required to support the sound conception, planning, design, construction, maintenance, and operation of engineered projects, but exclude the surveying of real property for the establishment of land boundaries, rights-of-way, easements, alignment of streets, and the dependent or independent surveys or resurveys of the public land survey system.

      (5) "Highly toxic materials", as used in Subsection 58-22-102(14)(a)(ii)(F), is as defined in the State Construction and Fire Codes adopted under Title 15A.

      (6) "Incidental practice" means "architecture work as is incidental to the practice of engineering", as used in Subsection 58-22-102(9), and "engineering work as is incidental to the practice of architecture", as used in Subsection 58-3a-102(6), which:

      (a) can be safely and competently performed by the licensee without jeopardizing the life, health, property and welfare of the public;

      (b) is secondary and substantially less in scope and magnitude when compared to the work performed or to be performed by the licensee in the licensed profession;

      (c) is work in which the licensee is fully responsible for the incidental practice performed as provided in Subsections 58-3a-603(1) or 58-22-603(1);

      (d) unless exempt from licensure as provided in Subsection 58-22-305(1)(e), is work on a building classified for not greater than 49 occupants as determined in the State Construction and Fire Codes adopted under Title 15A;

      (e) unless exempt from licensure as provided in Subsection 58-22-305(1)(e), is work included on a project with a construction value not greater than 15 percent of the overall construction value for the project including all changes or additions to the contracted or agreed upon work; and

      (f) shall not include work on a building or related structure in an occupancy category of III or IV as defined in 1604.5 of the 2009 International Building Code.

      (7) "Maximum allowable quantities", as used in Subsection 58-22-102(14)(a)(ii)(F), is quantities of hazardous materials as set forth in Section 307 of the 2009 International Building Code, Tables 307.1(1) and 307.1(2), which when exceeded, would classify the building, structure or portion thereof as Group H-1, H-2, H-3, H-4 or H-5 hazardous use.

      (8) "NCEES FE", as used throughout this rule, means the National Council of Examiners in Engineering and Surveying Fundamentals of Engineering Examination.

      (9) "NCEES FS", as used throughout this rule, means the National Council of Examiners in Engineering and Surveying Fundamentals of Surveying Examination.

      (10) "NCEES PE", as used throughout this rule, means the National Council of Examiners in Engineering and Surveying Principles and Practice of Engineering Examination.

      (11) "NCEES PS", as used throughout this rule, means the National Council of Examiners in Engineering and Surveying Principles and Practice in Surveying Examination.

      (12) "NCEES SE", as used throughout this rule, means the National Council of Examiners in Engineering and Surveying Structural Engineering Examination.

      (13) "Professional structural engineering or the practice of structural engineering", as defined in Subsection 58-22-102(14), is further defined to exclude the design and oversight of the construction and installation of highway, utility, or pedestrian bridges.

      (14) "Recognized jurisdiction", as used in Subsection 58-22-302(4)(d)(i), for licensure by endorsement, means any jurisdiction that is a member of the NCEES.

      (15) "Responsible charge" by a principal, as used in Subsection 58-22-102(7), means that the licensee is assigned to and is personally accountable for the production of specified professional engineering, professional structural engineering or professional land surveying projects within an organization.

      (16) "TAC/ABET" means Technology Accreditation Commission/Accreditation Board for Engineering and Technology(ABET, Inc.).

      (17) "Under the direction of the licensee", as used in Subsection 58-22-102(16), as part of the definition of "supervision of an employee, subordinate, associate, or drafter of a licensee", means that the unlicensed employee, subordinate, associate, or drafter of a person licensed under this chapter engages in the practice of professional engineering, professional structural engineering, or professional land surveying only on work initiated by a person licensed under this chapter, and only under the administration, charge, control, command, authority, oversight, guidance, jurisdiction, regulation, management, and authorization of a person licensed under this chapter.

      (18) "Unprofessional conduct" as defined in Title 58, Chapters 1 and 22, is further defined, in accordance with Subsection 58-1-203(1)(e), in Section R156-22-502.