R920-50-15. Modification of a Ropeway  


Latest version.
  •   (1) The Committee, or its appointed representative shall determine the certifications that will be required.

      (2) Depending on the nature and extent of the modification the Committee, or its appointed representative may require an Acceptance Inspection and Test.

      (3) The following certifications may be required: design; construction, and As-Built profile.

      (4) The certifications must be submitted by a qualified engineer and attached to the cover of the modification documents. The modification documents shall include the drawings, descriptions, or specifications pertaining to the affected systems and their connections with existing systems.

      (5) A revised lift data form shall be submitted.

      (6) The ropeway shall not resume operating until authorized by the Committee, or its appointed representative.