R657-62-15. Waiting Periods for Permits Obtained After the Drawing  


Latest version.
  • (1) Waiting periods do not apply to the purchase of remaining permits sold over the counter except as provided in Section 2.

    (2) Waiting periods are incurred as a result of purchasing remaining permits after the drawing. If a remaining permit is purchased in the current year, waiting periods will be in effect when applying in the drawing in following years.