R649-3-8. Casing Program  


Latest version.
  • 1. The method of cementing casing in the hole shall be by pump and plug method, displacement method, or other method approved by the division.

    2. When drilling in wildcat territory or in any field where high pressures are probable, the conductor and surface strings of casing must be cemented throughout their lengths, unless another procedure is authorized or prescribed by the division, and all subsequent strings of casing must be securely anchored.

    3. In areas where the pressures and formations to be encountered during drilling are known, sufficient surface casing shall be run to:

    3.1. Reach a depth below all known or reasonably estimated, utilizable, domestic, fresh water levels.

    3.2. Prevent blowouts or uncontrolled flows.

    4. The casing program adopted must be planned to protect any potential oil or gas horizons penetrated during drilling from infiltration of waters from other sources and to prevent the migration of oil, gas, or water from one horizon to another.