Utah Administrative Code (Current through November 1, 2019) |
R647. Natural Resources, Oil, Gas and Mining; Non-Coal |
R647-3. Small Mining Operations |
R647-3-102. Duration of the Notice of Intention
Latest version.
-
The notice of intention, including any subsequent amendments or revisions, shall remain in effect for the life of the small mining operation. However, the notice of intention may be withdrawn, after notice and opportunity for Board hearing, in the event of failure by the operator to pay permit fees required by R647-3-101 or to maintain and update adequate reclamation surety as required in R647-3-111.