R317-101-2. Definitions  


Latest version.
  •   "Cost Effective Analysis" means an analysis of feasible project alternatives capable of meeting state and federal water quality and public health requirements. The cost effective analysis shall be certified by the political subdivision and it shall include:

      A. monetary costs including the present worth or equivalent annual value of all capital costs;

      B. operation, maintenance, and replacement costs;

      C. fiscal sustainability, e.g., the cost of replacement of the project; and

      D. maximizes the potential for efficient use, reuse, recapture, and conservation of water and for energy conservation to the maximum extent practicable.

      "Credit Enhancement Agreement" means any agreement entered into between the Board, on behalf of the State, and a political subdivision, for the purpose of providing methods and assistance to political subdivisions to improve the security for and marketability of wastewater project obligations.

      "Eligible Project Costs" means project costs that meet the financial assistance requirements established by the Board.

      "Executive Secretary" means the Executive Secretary of the Water Quality Board.

      "Financial Assistance" means a project loan, bond purchase, credit enhancement agreement, interest buy-down agreement or hardship grant.

      "Hardship Grant" means a grant of monies to a political subdivision, individual, corporation, association, state of federal agency or other private entity that meets the wastewater project loan considerations or nonpoint source eligibility criteria whose project is determined by the Board to not be economically feasible unless grant assistance is provided. A hardship grant may be authorized in the following forms:

      A. A Planning Advance is required to be repaid at a later date, unless deemed otherwise by the Board, to help meet project costs incident to planning to determine the economic, engineering and financial feasibility of a proposed project.

      B. A Design Advance is required to be repaid at a later date, to help meet project costs incident to design including, but not limited to, surveys, preparation of plans, working drawings, specifications, investigations and studies.

      C. A Project Grant is not required to be repaid.

      "Interest Buy-Down Agreement" means any agreement entered into between the Board, on behalf of the State, and a political subdivision, for the purpose of reducing the cost of financing incurred by a political subdivision on bonds issued by the political subdivision for project costs.

      "Nonpoint Source (NPS) Project" means a facility, system, practice, study, activity or mechanism that abates, prevents or reduces the pollution of water of this state by a nonpoint source.

      "Principal Forgiveness" means a loan wherein a portion of the loan amount is forgiven (not required to be repaid) upon closing the loan.

      "Project Costs" means the cost of acquiring and constructing any project and include: the cost of acquisition and construction of any facility or any modification, improvement, or extension of such facility; any cost incident to the acquisition of any necessary property, easement or right of way; engineering or architectural fees, legal fees, fiscal agent's and financial advisors' fees; any cost incurred for any preliminary planning to determine the economic and engineering feasibility of a proposed project; costs of economic investigations and studies, surveys, preparation of designs, plans, working drawings, specifications and the inspection and supervision of the construction of any facility; interest accruing on loans made under this program during acquisition and construction of the project; and any other cost incurred by the political subdivision, the Board or the Department of Environmental Quality, in connection with the issuance of obligation of the political subdivision to evidence any loan made to it under the law.

      "Political Subdivision" means any county, city, town, improvement district, metropolitan water district, water conservancy district, special service district, drainage district, irrigation district, separate legal or administrative entity created under the Interlocal Co-operation Act or any other entity constituting a political subdivision under the laws of Utah.

      "Wastewater Project" means a sewer, storm or sanitary sewage system, sewage treatment facility, lagoon, sewage collection facility and system and related pipelines and all similar systems, works and facilities necessary or desirable to collect, hold, cleanse or purify any sewage or other polluted waters of this State; and a study, pollution prevention activity, or pollution education activity that will protect waters of this state.

      "Wastewater Project Obligation" means, as appropriate, any bond, loan, note or other obligation of a political subdivision issued to finance all or part of the cost of acquiring, constructing, expanding, upgrading or improving a wastewater project.