R315-319-101. Closure and Post-Closure Care - Closure or Retrofit of CCR Units  


Latest version.
  •   (a) The owner or operator of an existing unlined CCR surface impoundment, as determined under Subsection R315-319-71(a), is subject to the requirements of Subsection R315-319-101(a)(1).

      (1) Except as provided by Subsection R315-319-101(a)(3), if at any time after October 19, 2015 an owner or operator of an existing unlined CCR surface impoundment determines in any sampling event that the concentrations of one or more constituents listed in appendix IV to Rule R315-319 are detected at statistically significant levels above the groundwater protection standard established under Subsection R315-319-95(h) for such CCR unit, within six months of making such determination, the owner or operator of the existing unlined CCR surface impoundment shall cease placing CCR and non-CCR wastestreams into such CCR surface impoundment and either retrofit or close the CCR unit in accordance with the requirements of Subsection R315-319-102.

      (2) An owner or operator of an existing unlined CCR surface impoundment that closes in accordance with Subsection R315-319-101(a)(1) shall include a statement in the notification required under Subsection R315-319-102(g) or (k)(5) that the CCR surface impoundment is closing or retrofitting under the requirements of Subsection R315-319-101(a)(1).

      (3) The timeframe specified in Subsection R315-319-101(a)(1) does not apply if the owner or operator complies with the alternative closure procedures specified in Subsection R315-319-103.

      (4) At any time after the initiation of closure under Subsection R315-319-101(a)(1), the owner or operator may cease closure activities and initiate a retrofit of the CCR unit in accordance with the requirements of Subsection R315-319-102(k).

      (b) The owner or operator of an existing CCR surface impoundment is subject to the requirements of Subsection R315-319-101(b)(1).

      (1) Except as provided by Subsection R315-319-101(b)(4), within six months of determining that an existing CCR surface impoundment has not demonstrated compliance with any location standard specified in Subsections R315-319-60(a), 61(a), 62(a), 63(a), and 64(a), the owner or operator of the CCR surface impoundment shall cease placing CCR and non-CCR wastestreams into such CCR unit and close the CCR unit in accordance with the requirements of Subsection R315-319-102.

      (2) Within six months of either failing to complete the initial or any subsequent periodic safety factor assessment required by Subsection R315-319-73(e) by the deadlines specified in Subsections R315-319-73(f)(1) through (3) or failing to document that the calculated factors of safety for the existing CCR surface impoundment achieve the minimum safety factors specified in Subsections R315-319-73(e)(1)(i) through (iv), the owner or operator of the CCR surface impoundment shall cease placing CCR and non-CCR wastestreams into such CCR unit and close the CCR unit in accordance with the requirements of Subsection R315-319-102.

      (3) An owner or operator of an existing CCR surface impoundment that closes in accordance with Subsection R315-319-101(b)(1) or (2) shall include a statement in the notification required under Subsection R315-319-102(g) that the CCR surface impoundment is closing under the requirements of Subsection R315-319-101(b)(1) or (2).

      (4) The timeframe specified in Subsection R315-319-101(b)(1) does not apply if the owner or operator complies with the alternative closure procedures specified in Subsection R315-319-103.

      (c) The owner or operator of a new CCR surface impoundment is subject to the requirements of Subsection R315-319-101(c)(1).

      (1) Within six months of either failing to complete the initial or any subsequent periodic safety factor assessment required by Subsection R315-319-74(e) by the deadlines specified in Subsections R315-319-74(f)(1) through (3) or failing to document that the calculated factors of safety for the new CCR surface impoundment achieve the minimum safety factors specified in Subsections R315-319-74(e)(1)(i) through (v), the owner or operator of the CCR surface impoundment shall cease placing CCR and non-CCR wastestreams into such CCR unit and close the CCR unit in accordance with the requirements of Section R315-319-102.

      (2) An owner or operator of an new CCR surface impoundment that closes in accordance with Subsection R315-319-101(c)(1) shall include a statement in the notification required under Subsection R315-319-102(g) that the CCR surface impoundment is closing under the requirements of Subsection R315-319-101(c)(1).

      (d) The owner or operator of an existing CCR landfill is subject to the requirements of Subsection R315-319-101(d)(1).

      (1) Except as provided by Subsection R315-319-101(d)(3), within six months of determining that an existing CCR landfill has not demonstrated compliance with the location restriction for unstable areas specified in Subsection R315-319-64(a), the owner or operator of the CCR unit shall cease placing CCR and non-CCR waste streams into such CCR landfill and close the CCR unit in accordance with the requirements of Section R315-319-102.

      (2) An owner or operator of an existing CCR landfill that closes in accordance with Subsection R315-319-101(d)(1) shall include a statement in the notification required under Subsection R315-319-102(g) that the CCR landfill is closing under the requirements of Subsection R315-319-101(d)(1).

      (3) The timeframe specified in Subsection R315-319-101(d)(1) does not apply if the owner or operator complies with the alternative closure procedures specified in Section R315-319-103.