R311-203-3. New Installations, Permits
-
(a) Certified UST installers shall notify the Director at least 10 days, or another time period approved by the Director, before commencing any of the following activities:
(1) the installation of a full UST system or tank only;
(2) the installation of underground product piping for one or more tanks at a facility, separate from the installation of one or more tanks at a facility;
(3) the internal lining of a previously-existing tank;
(4) the installation of a cathodic protection system on one or more previously-existing tanks at a facility;
(5) the installation of a bladder in a tank;
(6) any retro-fit, replacement, or installation that requires the cutting of a manway into the tank;
(7) the installation of a spill prevention or overfill prevention device;
(8) the installation of a leak detection monitoring system; and
(9) the installation of a containment sump or under-dispenser containment.
(b) The UST installation company shall submit to the Director an UST installation permit fee of $200 when any of the activities listed in R311-203-3(a)(1) through (6) is performed on an UST system that has not qualified for a certificate of compliance before the commencement of the work.
(c) The fees assessed under 19-6-411(2)(a)(i) shall be determined based on the number of full UST installations performed by the installation company in the 12 months previous to the fee due date. Installations for which the fee assessed under 19-6-411(2)(a)(ii) and R311-203-3(c) is charged shall count toward the total installations for the 12-month period.
(d) For the purposes of Subsections 19-6-411(2)(a)(ii), 19-6-407(1)(c), and R311-203-2(d), an installation shall be considered complete when:
(1) in the case of installation of a new UST system, tank only, or product piping only, the new installation first holds a regulated substance; or
(2) in the case of installation of the components listed in Subsections R311-203-3(a)(3) through (a)(6), the new installation is functional and the UST holds a regulated substance and is operational.
(e) If, before completion of an installation for which an UST installation permit fee is required, the owner or operator decides to install additional UST system components, the installer shall notify the Director of the change. When additions are made, the UST installation permit fee shall not be increased unless the original UST installation permit fee would have been higher had the addition been considered at the time the original fee was determined.
(f) The number of UST installation companies performing work on a particular installation shall not be a factor in determining the UST installation permit fee for that installation. However, each installation company shall identify itself at the time the UST installation permit fee is paid.
(g) When a new UST system, tank only, product piping only, or new cathodic protection system is installed, the owner or operator shall submit to the Director an as-built drawing, to scale, that meets the requirements of R311-200-1(b)(2).