No. 29783: R309-550. Facility Design and Operation: Transmission and Distribution Pipelines  

  • DAR File No.: 29783
    Filed: 04/02/2007, 04:19
    Received by: NL

    NOTICE OF REVIEW AND STATEMENT OF CONTINUATION

    Concise explanation of the particular statutory provisions under which the rule is enacted and how these provisions authorize or require the rule:

    Section 19-4-104 authorizes the Drinking Water Board to make rules in accordance with Title 63, Chapter 46a, as necessary to administer the Safe Drinking Water Act.

    Summary of written comments received during and since the last five-year review of the rule from interested persons supporting or opposing the rule:

    No comments have been received during the last five years opposing this rule.

    Reasoned justification for continuation of the rule, including reasons why the agency disagrees with comments in opposition to the rule, if any:

    This rule provides specific requirements for the design and installation of transmission and distribution pipelines utilized by public drinking water systems throughout the state, and since the Board has not received comments opposing this rule, the Board feels it is prudent to continue this rule.

    The full text of this rule may be inspected, during regular business hours, at the Division of Administrative Rules, or at:

    Environmental Quality
    Drinking Water
    150 N 1950 W
    SALT LAKE CITY UT 84116-3085

    Direct questions regarding this rule to:

    Bill Birkes at the above address, by phone at 801-536-4201, by FAX at 801-536-4211, or by Internet E-mail at bbirkes@utah.gov

    Authorized by:

    Ken Bousfield, Acting Director

Document Information

Publication Date:
04/15/2007
Filed Date:
04/02/2007
Agencies:
Environmental Quality,Drinking Water
Authorized By:
Ken Bousfield, Acting Director
DAR File No.:
29783
Related Chapter/Rule NO.: (1)
R309-550. Facility Design and Operation: Transmission and Distribution Pipelines.