(Amendment)
DAR File No.: 33674
Filed: 05/26/2010 12:59:46 PMRULE ANALYSIS
Purpose of the rule or reason for the change:
This rule establishes the coal mining permit application requirements related to land use and air quality. The amendment only adds an informational rule cross-reference so the applicant can quickly identify the rule applicable to valid existing rights determinations. The rule is being changed at the request of the Office of Surface Mining to be as effective as federal regulation, in order to retain state primacy.
Summary of the rule or change:
This rule amendment adds an informational rule cross-reference so the coal mining applicant can easily identify the rule applicable to valid existing rights determinations. These amendments are in accordance with Office of Surface Mining regulations.
State statutory or constitutional authorization for this rule:
- Section 40-10-6
- Subsection 40-10-10(2)
Anticipated cost or savings to:
the state budget:
There are no anticipated costs or savings to the state budget, since the added rule cross-reference benefits the coal mining applicant with no impact to the state.
local governments:
No local government costs or savings are anticipated. Local government is not impacted by this rule.
small businesses:
There are no anticipated costs or savings to small businesses since this change is only an informational rule cross-reference.
persons other than small businesses, businesses, or local governmental entities:
Persons other than small businesses, businesses, or local government entities are not anticipated to incur costs or savings. These regulations impact the Division and coal mining companies in Utah.
Compliance costs for affected persons:
Coal mine operators within Utah are regulated via the Title R645 rules. The amendment adds a rule cross-reference to benefit the coal mining applicant so no compliance costs are expected for coal mine operators from this change.
Comments by the department head on the fiscal impact the rule may have on businesses:
No measurable fiscal impact upon businesses is expected from this rule change.
Michael Styler, Executive Director
The full text of this rule may be inspected, during regular business hours, at the Division of Administrative Rules, or at:
Natural Resources
Oil, Gas and Mining; Coal
1594 W NORTH TEMPLE
SALT LAKE CITY, UT 84116-3154Direct questions regarding this rule to:
- Steve Schneider at the above address, by phone at 801-538-5328, by FAX at 801-359-3940, or by Internet E-mail at steveschneider@utah.gov
Interested persons may present their views on this rule by submitting written comments to the address above no later than 5:00 p.m. on:
07/15/2010
Interested persons may attend a public hearing regarding this rule:
- 06/23/2010 09:00 AM, DNR, 1594 W North Temple, #1040, Salt Lake City, UT
This rule may become effective on:
07/28/2010
Authorized by:
John Baza, Director
RULE TEXT
R645. Natural Resources; Oil, Gas and Mining; Coal.
R645-301. Coal Mine Permitting: Permit Application Requirements.
R645-301-400. Land Use and Air Quality.
The rules in R645-301-400 present the requirements for information related to Land Use and Air Quality which are to be included in each permit application.
410. Land Use. Each permit application will include a descriptions of the premining and proposed postmining land use(s).
411. Environmental Description.
411.100. Premining Land-Use Information. The application will contain a statement of the condition and capability of the land which will be affected by coal mining and reclamation operations within the proposed permit area, including:
411.110. A map and supporting narrative of the uses of the land existing at the time of the filing of the application. If the premining use of the land was changed within five years before the anticipated date of beginning the proposed operations, the historic use of the land will also be described;
411.120 A narrative of land capability which analyzes the land-use description in conjunction with other environmental resources information required under R645-301-411.100, and R645-301 and R645-302. The narrative will provide analyses of the capability of the land before any coal mining and reclamation operations to support a variety of uses, giving consideration to soil and foundation characteristics, topography, vegetative cover and the hydrology of the area proposed to be affected by coal mining and reclamation operations; and
411.130. A description of the existing land uses and land-use classifications under local law, if any, of the proposed permit and adjacent areas.
411.140. Cultural and Historic Resources Information. The application will contain maps as described under R645-301-411.141 and a supporting narrative which describe the nature of cultural and historic resources listed or eligible for listing in the National Register of Historic Places and known archeological sites within the permit and adjacent areas. The description will be based on all available information, including, but not limited to, information from the State Historic Preservation Officer and from local archeological, historic, and cultural preservation agencies.
411.141. Cultural and Historic Resources Maps. These maps will clearly show:
411.141.1. The boundaries of any public park and locations of any cultural or historical resources listed or eligible for listing in the National Register of Historic Places and known archeological sites within the permit and adjacent areas;
411.141.2. Each cemetery that is located in or within 100 feet of the proposed permit area; and
411.141.3. Any land within the proposed permit area which is within the boundaries of any units of the National System of Trails or the Wild and Scenic Rivers System, including study rivers designated under section 5(a) of the Wild and Scenic Rivers Act.
411.142. Coordination with the State Historic Preservation Officer (SHPO). The narrative presented under R645-301-411.140 will also describe coordination efforts with and present evidence of clearances by the SHPO. For any publicly owned parks or places listed on the National Register of Historic Places that may be adversely affected by the proposed coal mining and reclamation operations, each plan will describe the measures to be used:
411.142.1. To prevent adverse impacts; or
411.142.2. If valid existing rights exist , as determined under R645-103-231, or joint agency approval is to be obtained under R645-103-236, to minimize adverse impacts.
411.143. The Division may require the applicant to identify and evaluate important historic and archeological resources that may be eligible for listing on the national Register of Historic Places through:
411.143.1. Collection of additional information;
411.143.2. Conducting field investigations; or
411.143.3. Other appropriate analyses.
411.144. The Division may require the applicant to protect historic or archeological properties listed on or eligible for listing on the National Register of Historic Places through appropriate mitigation and treatment measures. Appropriate mitigation and treatment measures may be required to be taken after permit issuance provided that the required measures are completed before the properties are affected by any mining operation.
411.200. Previous Mining Activity. The application will state whether the proposed permit area has been previously mined, and, if so, the following information, if available:
411.210. The type of mining method used;
411.220. The coal seams or other mineral strata mined;
411.230. The extent of coal or other minerals removed;
411.240. The approximate dates of past mining; and
411.250. The uses of the land preceding mining.
412. Reclamation Plan.
412.100. Postmining Land-Use Plan. Each application will contain a detailed description of the proposed use, following reclamation, of the land within the proposed permit area, including a discussion of the utility and capacity of the reclaimed land to support a variety of alternative uses, and the relationship of the proposed use to existing land-use policies and plans. The plan will explain:
412.110. How the proposed postmining land use is to be achieved and the necessary support activities which may be needed to achieve the proposed land use;
412.120. For the purposes of SURFACE COAL MINING AND RECLAMATION ACTIVITIES, where range or grazing is the proposed postmining use, the detailed management plans to be implemented;
412.130. Where a land use different from the premining land use is proposed, all materials needed for approval of the alternative use under R645-301-413.100 through R645-301-413.334, R645-302-270, R645-302-271.100 through R645-302-271.400, R645-302-271.600, R645-302-271.800, and R645-302-271.900; and
412.140. The consideration which has been given to making all of the proposed coal mining and reclamation operations consistent with surface owner plans and applicable Utah and local land-use plans and programs.
412.200. Land Owner or Surface Manager Comments. The description will be accompanied by a copy of the comments concerning the proposed use by the legal or equitable owner of record of the surface of the proposed permit area and Utah and local government agencies which would have to initiate, implement, approve, or authorize the proposed use of the land following reclamation.
412.300. Suitability and Compatibility. Assure that final fills containing excess spoil are suitable for reclamation and revegetation and are compatible with the natural surroundings and the approved postmining land use.
413. Performance Standards.
413.100. Postmining Land Use. All disturbed areas will be restored in a timely manner to conditions that are capable of supporting:
413.110. The uses they were capable of supporting before any mining; or
413.120. Higher or better uses.
413.200. Determining Premining Uses of Land.
413.210. The premining uses of land to which the postmining land use is compared will be those uses which the land previously supported, if the land has not been previously mined and has been properly managed.
413.220. The postmining land use for land that has been previously mined and not reclaimed will be judged on the basis of the land use that existed prior to any mining: provided that, if the land cannot be reclaimed to the land use that existed prior to any mining because of the previously mined condition, the postmining land use will be judged on the basis of the highest and best use that can be achieved which is compatible with surrounding areas and does not require the disturbance of areas previously unaffected by mining.
413.300. Criteria for Alternative Postmining Land Uses. Higher or better uses may be approved by the Division as alternative postmining land uses after consultation with the landowner or the land management agency having jurisdiction over the lands, if the proposed uses meet the following criteria:
413.310. There is a reasonable likelihood for achievement of the use;
413.320. The use does not present any actual or probable hazard to public health or safety, or threat of water diminution or pollution; and
413.330. The use will not:
413.331. Be impractical or unreasonable;
413.332. Be inconsistent with applicable land-use policies or plans;
413.333. Involve unreasonable delay in implementation; or
413.334. Cause or contribute to violation of federal, Utah, or local law.
414. Interpretation of R645-301-412 and R645-301-413.100 through R645-301-413.334, R645-302-270, R645-302-271.100 through R645-302-271.400, R645-302-271.600, R645-302-271.800, and R645-302-271.900 for the purposes of UNDERGROUND COAL MINING AND RECLAMATION ACTIVITIES, Reclamation Plan: Postmining Land Use. The requirements of R645-301-412-130, for approval of an alternative postmining land use, may be met by requesting approval through the permit revision procedures of R645-303-220 rather than requesting such approval in the original permit application. The original permit application, however, must demonstrate that the land will be returned to its premining land-use capability as required by R645-301-413.100. An application for a permit revision of this type:
414.100. Must be submitted in accordance with the filing deadlines of R645-303-220;
414.200. Will constitute a significant alteration from the mining operations contemplated by the original permit; and
414.300. Will be subject to the requirements of R645-300-120 through R645-300-155 and R645-300-200.
420. Air Quality.
421. Coal mining and reclamation operations will be conducted in compliance with the requirements of the Clean Air Act (42 U.S.C. Sec. 7401 et seq.) and any other applicable Utah or federal statutes and regulations containing air quality standards.
422. The application will contain a description of coordination and compliance efforts which have been undertaken by the applicant with the Utah Bureau of Air Quality.
423. For all SURFACE COAL MINING AND RECLAMATION ACTIVITIES with projected production rates exceeding 1,000,000 tons of coal per year, the application will contain an air pollution control plan which includes the following:
423.100 An air quality monitoring program to provide sufficient data to evaluate the effectiveness of the fugitive dust control practices proposed under R645-301-423.200 to comply with federal and Utah air quality standards; and
423.200 A plan for fugitive dust control practices as required under R645-301-244.100 and R645-301-244.300.
424. All plans for SURFACE COAL MINING AND RECLAMATION ACTIVITIES with projected production rates of 1,000,000 tons of coal per year or less, will include a plan for fugitive dust control practices as required under R645-301-244 and R645-301-244.300.
425. All plans for SURFACE COAL MINING AND RECLAMATION ACTIVITIES with projected production rates of 1,000,000 tons or less will include an air quality monitoring program, if required by the division, to provide sufficient data to judge the effectiveness of the fugitive dust control plan required under R645-301-424.
KEY: reclamation, coal mines
Date of Enactment or Last Substantive Amendment: [
March 26, 2008] 2010Notice of Continuation: March 7, 2007
Authorizing, and Implemented or Interpreted Law: 40-10-1 et seq.
Document Information
- Hearing Meeting:
- 06/23/2010 09:00 AM, DNR, 1594 W North Temple, #1040, Salt Lake City, UT
- Effective Date:
- 7/28/2010
- Publication Date:
- 06/15/2010
- Type:
- Editor's Note
- Filed Date:
- 05/26/2010
- Agencies:
- Natural Resources,Oil, Gas and Mining; Coal
- Rulemaking Authority:
Section 40-10-6
Subsection 40-10-10(2)
- Authorized By:
- John Baza, Director
- DAR File No.:
- 33674
- Related Chapter/Rule NO.: (1)
- R645-301-400. Land Use and Air Quality.