No. 37545 (Repeal and Reenact): Rule R649-9. Waste Management and Disposal  

  • (Repeal and Reenact)

    DAR File No.: 37545
    Filed: 04/25/2013 05:38:05 PM

    RULE ANALYSIS

    Purpose of the rule or reason for the change:

    The purpose of this rule is to establish standards for the management and disposal of exploration and production wastes from the oil and gas industry. Due to extensive reorganization, the rule is being repealed and reenacted for improved readability by permittees and Division staff. Enhanced rules in Colorado and New Mexico since Utah's prior 1998 amendment have resulted in produced water from out-of-state oil and gas wells being transported and disposed into disposal facilities within Utah. Fortunately, only 6% of the produced water within Utah is transferred to disposal facilities, since most produced water is injected, the preferred disposal alternative. Rules from nearby states have been reviewed and the reenacted Rule R649-9 rule has been reviewed through an informal rulemaking process.

    Summary of the rule or change:

    This rule establishes standards for the management and disposal of exploration and production wastes from the oil and gas industry. A substantive provision that is not included from the old rule is the elimination of the Subsection R649-9-3(3.4) requirements for unlined disposal pits, since unlined disposal pits are not adequate for environmental protection. Substantive provisions that are being added to the new rule include more specificity to geologic and hydrological requirements, more specificity to diagrams required for pond construction and leak detection systems, secondary containment to capture a potential release, limitation on the size of pond to encourage evaporation rather than storage and limit potential release size, a new section on landfarms rather than included in other facilities, and reclamation bonds with third party cost determination.

    State statutory or constitutional authorization for this rule:

    Anticipated cost or savings to:

    the state budget:

    The Oil and Gas Program of the Division will implement the reenacted Rule R649-9 for oil and gas waste management facilities within Utah, but no direct costs or savings to the Division are anticipated from this change.

    local governments:

    Local governments do not operate oil and gas waste management facilities in Utah, therefore there is no cost or savings to local government.

    small businesses:

    The companies who operate oil and gas waste management facilities in Utah are affected by this rule. The Division has determined Rule R649-9 applies to 22 commercial disposal facilities and 19 non-commercial facilities within Utah, all accepting waste streams from oil and gas wells and well sites. Small businesses represent 39% of the number of such facilities in Utah, but a much lower percentage of the total volume of exploration and production waste handled. In another way, the larger businesses normally operate a facility that is much larger in scale and volume. Design and construction requirements for disposal facilities approved prior to 07/01/2013 remain as previously permitted. The requirement for reclamation bonds utilizing third party cost estimates is delayed for current facilities until five years after 07/01/2013, and the Division is not able to calculate the total costs without the third party figures. Some disposal facilities in Utah are not expected to see increased bond costs.

    persons other than small businesses, businesses, or local governmental entities:

    Persons other than small businesses, businesses, or local government entities are not impacted by this rule, since the rule impacts companies who operate oil and gas waste management facilities within Utah.

    Compliance costs for affected persons:

    The companies who operate oil and gas waste management facilities in Utah are affected by this rule. Since the existing rule was written in a more general manner, many of the permitting standards in the reenacted rule were already implemented in past practice with permittees. The Division has determined Rule R649-9 applies to 22 commercial disposal facilities and 19 non-commercial facilities within Utah, all accepting waste streams from oil and gas wells and well sites. Significant current capacity and newer technology being implemented to reduce the volume of produced water to be transported to evaporation facilities indicates there would be limited growth of new evaporation ponds in the near future. Design and construction requirements for disposal facilities approved prior to 07/01/2013 remain as previously permitted. The requirement for reclamation bonds utilizing third party cost estimates is delayed for current facilities until five years after 07/01/2013, and the Division is not able to calculate the total costs without the third party figures, although some facilities are expected to see no bond increase.

    Comments by the department head on the fiscal impact the rule may have on businesses:

    The Division has carefully considered this reenacted rule for existing facilities to provide for a five-year delay in new bond costs. In addition, the design and construction requirements remain as previously permitted, as shown in Subsection R649-1-1(1.3), for facilities approved prior to 07/01/2013. The Division has undertaken an extensive informal rulemaking which included opportunities for input from stakeholders prior to the Board of Oil, Gas and Mining allowing this rulemaking to proceed to the formal process in the State Bulletin.

    Michael Styler, Executive Director

    The full text of this rule may be inspected, during regular business hours, at the Division of Administrative Rules, or at:

    Natural Resources
    Oil, Gas and Mining; Oil and GasRoom 1210
    1594 W NORTH TEMPLE
    SALT LAKE CITY, UT 84116-3154

    Direct questions regarding this rule to:

    Interested persons may present their views on this rule by submitting written comments to the address above no later than 5:00 p.m. on:

    06/15/2013

    Interested persons may attend a public hearing regarding this rule:

    • 05/30/2013 09:00 AM, Uintah Basin ATC, 1100 E Lagoon St., Roosevelt, UT

    This rule may become effective on:

    07/01/2013

    Authorized by:

    John Baza, Director

    RULE TEXT

    R649. Natural Resources; Oil, Gas and Mining; Oil and Gas.

    R649-9. Waste Management and Disposal.

    [R649-9-1. Introduction.

    1. Section 40-6-5 UCA authorizes the board to regulate the disposal of salt water and oil-field wastes. It is the intent of the Board and Division to regulate E and P wastes and facilities for the disposal of these wastes in a manner that protects the environment, limits liability to producers, and minimizes the volume of waste.

    2. These rules specify the informational and procedural requirements for waste management and disposal, the permitting of disposal facilities and the cleanup requirements for E and P waste related sites.

     

    R649-9-2. General Waste Management.

    1. Wastes addressed by these rules are E and P Wastes that are exempt from the RCRA hazardous waste management requirements.

    1.1. Before using a commercial disposal facility the operator may contact the Division to verify the status of the facility. The Division regularly updates this information on the Division of Oil, Gas and Mining web site.

    1.2. Each site and/or facility used for disposal must be permitted and in good standing with the division.

    2. Reduction of the amount of material generated that must be disposed of is the preferred practice.

    2.1. Recycling should be used whenever possible and practical.

    2.2. In general, good housekeeping practices shall be used.

    2.3. Operators shall catch leaks, drips, contain spills, and cleanup promptly.

    3. The method of disposal used shall be compatible with the waste that is the subject of disposal.

    3.1. RCRA exempt waste shall not be mixed with nonexempt waste.

    4. Every operator shall file an Annual Waste Management Plan by January 15 of each year to account for the proper disposition of produced water and other E and P Wastes.

    4.1. If changes are made to the plan during the year, then the operator shall notify the division in writing of this change.

    4.2. This plan will include the type and estimated annual volume of wastes that will be or have been generated.

    4.3. The disposal facilities private or to be used for disposal,

    4.4. The description of any waste reduction or minimization procedures.

    4.5. Any onsite disposal/treatment methods or programs to be implemented by the operator.

     

    R649-9-3. Permitting of Disposal Pits.

    1. All commercial disposal pits and disposal pits located off of an existing mineral lease shall be bonded in accordance with R649-9-9, Bonding of Disposal Facilities to assure proper operation, maintenance, and closure of the pits.

    2. Application shall be made to the Division for approval of any disposal pit.

    2.1. The pit shall be designed appropriately for the intended purpose.

    2.2. Commercial disposal pits shall be designed and constructed under the supervision of a registered professional engineer.

    2.3. The application and site shall meet the following requirements:

    2.3.1 The pit shall be located on level, stable ground, and an acceptable distance away from any established or intermittent drainage.

    2.3.2. The pit shall not be located in a geologically and hydrologically unsuitable area, such as aquifer recharge areas, flood plains, drainage bottoms, and areas near faults.

    2.3.3. The pit shall have adequate storage capacity to safely contain all produced water even during those periods when evaporation rates are at a minimum.

    2.3.4. The pit shall be designed and constructed so as to prevent the entrance of surface water.

    2.3.5. The pit shall be designed, maintained and operated to prevent unauthorized surface or subsurface discharge of water.

    2.3.6. The pit shall be fenced and maintained to prevent access by livestock, wildlife and unauthorized personnel and if required, equipped with flagging or netting to deter entry by birds and waterfowl.

    2.3.7. The pit levees for produced water pits receiving volumes in excess of five barrels per day, shall be constructed so that the inside grade of the levee is no steeper than 3:1 and the outside grade no steeper than 2:1. The top of the levee shall be level and of sufficient width to allow for adequate compaction.

    2.3.8 All approved produced water pits not located at a well site shall be identified with a suitable sign.

    2.3.9. The artificial materials used in lining pits shall be impervious and resistant to weather, sunlight, hydrocarbons, aqueous acids, alkalies, salt, fungi, or other substances that might be contained in the produced water.

    3. If rigid materials are used, leak proof expansion joints shall be provided, or the material shall be of sufficient thickness and strength to withstand, expansion, contraction and settling movements in the underlying earth, without cracking.

    3.1. If flexible materials are used, they shall be of sufficient thickness and strength to be resistant to tears and punctures.

    3.2. Commercial disposal pits shall be lined with a minimum liner thickness of 40 mils or as approved by the Division.

    3.3. Lined pits constructed in relatively impermeable soils shall have an underlaying gravel filled sump and lateral system or suitable leak detection system.

    3.4. Lined pits constructed in relatively permeable soils shall have a secondary liner underlaying the leak detection system, that is graded so as to direct leaks to the observation sump.

    3.5. Test borings shall be taken in sufficient quantity and to an adequate depth to satisfactorily define subsurface conditions and assure that the liner will be placed on a firm stable base and to determine the appropriate leak detection system.

    4. Requirements for Unlined Disposal Pits.

    4.1 An application for disposal of produced water into an unlined pit will be considered if such disposal does not demonstrate significant pollution potential to surface or ground water and meets at least one of the following criteria:

    4.2. The water to be disposed of does not have a higher total dissolved solids "TDS" content than ground water that could be affected and provided that the water does not contain objectionable levels of constituents and characteristics including chlorides, sulfates, pH, oil, grease, heavy metals and aromatic hydrocarbons.

    4.3. That all, or a substantial part of the produced water is being used for beneficial purposes such as irrigation and livestock or wildlife watering and a water analysis indicates that the water is acceptable for the intended use.

    4.4. The volume of water to be disposed of does not exceed five barrels per day on a monthly basis.

    5. Application Requirements for Produced Water Pits.

    5.1. Applications for disposal of produced water into lined pits shall include the following information:

    5.2. A topographic map and drawing of the site, on a suitable scale, that indicate the pit dimensions, cross section, side slopes, leak detection system and location relative to other site facilities. The drawings shall be of professional quality.

    5.3. The maximum daily quantity of water to be disposed of and a representative water analysis of such water that includes the concentrations of chlorides and sulfates, pH, total dissolved solids "TDS", and information regarding any other significant constituents if requested.

    5.4. Climatological data indicating the average annual evaporation and precipitation for the area.

    5.5. The method and schedule for disposal of precipitated solids.

    5.6. Drawings of unloading facilities and explanation of the method for controlling and disposing of any liquid hydrocarbon accumulation so that the evaporation process is not hampered.

    5.7. The engineering data and design criteria used to determine the pit size that includes a 2-foot free-board.

    5.8. The type, thickness, strength, and life span of material to be used for lining the pit and the method of installation.

    5.9. A description of the leak detection method to be utilized,

    5.9.1. The proposed inspection frequency of the detection system.

    5.9.2. The proposed procedures for repair of the liner should leakage occur.

    6. Applications for disposal of produced water into unlined pits shall include the following information:

    6.1. A topographic map and drawing of the site on a suitable scale that indicate the pit dimensions, cross section, side slopes, size and location relative to other site facilities.

    6.2. The daily quantity of water to be disposed of and a representative water analysis of such water that includes the total dissolved solids "TDS", pH, oil and grease content, the concentrations of chlorides and sulfates, and information regarding any other significant constituents if required.

    6.3. Climatological data indicating the average annual evaporation and precipitation for the area.

    6.4. The estimated percolation rate based on soil characteristics under and adjacent to the pit.

    6.5. Estimated depth and areal extent of any USDW in the area and an indication of any effect or interaction of the produced water with any such water resources present at or near the surface.

    6.6. If beneficial use is the basis for the application, written confirmation from the user should be submitted.

    6.7. If the application is made on the basis that surface and subsurface waters will not be adversely affected by disposal in an unlined pit, the following additional information is required:

    6.7.1. A map showing the location of surface waters, water wells, and existing water disposal facilities within a one mile radius of the proposed disposal facility.

    6.7.2. The weighted average concentration of total dissolved solids "TDS" of all surface and subsurface waters within a one mile radius that might be affected by the proposed disposal.

    6.7.3. Any reasonable geological and hydrological evidence showing that the proposed disposal method will not adversely affect existing water quality or major uses of such waters.

    7. Within 30 days of the submission of an application for disposal of produced water into a commercial disposal pit, the division shall review the application as to its completeness and adequacy for the intended purpose and shall require such changes that are found necessary to assure compliance with the applicable rules. If the application is in order, the Division shall provide for a public notice to be published in a newspaper of general circulation in the county where the pit is to be located.

     

    R649-9-4. Permitting of Other Disposal Facilities.

    1. Facilities used for the treatment and disposal of E and P wastes other than evaporation pits shall be permitted by the Division. This would include such activities as landfarming, composting, solidifying, bioremediation, and others.

    2. All commercial treatment and disposal facilities must be bonded in accordance with R649-9-9, Bonding of Disposal Facilities, to assure proper operation, maintenance, and closure of the facility.

    3. Application Requirements for Treatment and Disposal Facilities. The application shall contain the following:

    3.1. A complete description of the proposed facility,

    3.2. Processes involved including a complete list of all wastes to be accepted at the facility and products generated.

    3.3. Maps and drawings of suitable scale showing all facilities and equipment.

    3.4. Materials or products to be applied to the land surface or subsurface shall meet the Division's cleanup levels for contaminated soil and other wastes.

    3.5. If leachability and/or toxicity is of concern due to the type or source(s) of wastes, tests will be required and may utilize the Toxicity Characteristic Leaching Procedure (TCLP).

    3.6. The submission of an application to the Division of Water Quality, Department of Environmental Quality, for a discharge permit may be required if it is determined that the facility and associated activity will not have a de minimus actual or potential effect on ground water quality.

    3.7. If the Division determines there is potential for discharge, or if the proposal involves a commercial disposal operation it will be forwarded to the Division of Water Quality for their review.

     

    R649-9-5. Construction and Inspection Requirements for Disposal Facilities.

    1. Division personnel shall be afforded a reasonable opportunity for inspection of any proposed disposal facility during the construction and operation of the facility.

    2. The division shall be notified at least two working days prior to the installation of a pit liner so that an inspection of the leak detection system can be conducted.

    3. In any case, the division shall be notified after completion of facility construction, at least two working days prior to its use, so that an inspection can be conducted to verify that the facility has been constructed in accordance with the approved application.

    4. Disposal facilities shall be operated in accordance with an approved application and in a manner that does not cause pollution or safety and health hazards.

    5. Failure to meet the requirements and standards for construction and operation of a disposal facility shall be considered as noncompliance and will result in the imposition of corrective actions and compliance schedules or a cessation of operations order.

     

    R649-9-6. Reporting and Recordkeeping Requirements for Disposal Facilities.

    1. All unauthorized discharges or spills from disposal facilities including water observed in a leak detection system shall be promptly reported to the division.

    2. Each producer who utilizes any approved produced water disposal facility shall comply with the reporting requirements of R649-8-10.

    3. Each operator of a disposal facility, excluding disposal wells, shall report to the Division on a quarterly basis. This report shall include the volume and type of wastes received at the facility during the quarter and results of the leak detection system inspections.

    4. The occurrence of water in a leak detection system during operation of a pit constitutes liner failure and requires immediate action.

    4.1. The Division has the option of allowing the operator a short period of time to take corrective action.

    4.2. Further utilization of the pit will be allowed only after liner repairs and an inspection by the Division.

    5. Each owner/operator of a commercial disposal facility shall keep records showing at a minimum the following: date and time waste was received, origin, volume, type, transporter, and generator of the waste. These records shall be available for inspection by the Division for at least six years.

     

    R649-9-7. Final Closure and Cleanup of Disposal Facilities.

    1. A plan for final closure of a disposal facility shall be submitted to the Division for approval. The closure plan shall include the following:

    1.1. Provisions for removal of all equipment at the site.

    1.2. Proposed plans and procedures for sampling and testing soils and ground water at the site.

    1.3. Soils will need to meet the Division's Cleanup Levels for Contaminated Soils or background levels whichever is less stringent.

    1.4. Provisions for a monitoring plan if required by the Division, and

    1.5. A consideration of post disposal land use and landowner requests when the closure plan is developed.

    2. A bond for a disposal facility will be released when the requirements of a closure plan approved by the Division has been met as determined by the Division.

     

    R649-9-8. Variances from Requirements and Standards.

    Requests for approval of a variance from any of the requirements or standards of these rules shall be submitted to the director in writing and provide information as to the circumstances that warrant approval of the requested variance and the proposed alternative means by which the requirements or standards will be satisfied. Variances may be approved only after proper notice and public hearing before the board.

     

    R649-9-9. Bonding of Disposal Facilities.

    1. Disposal facilities, other than injection wells, shall be bonded according to this rule in order to protect the State and oil and gas producers from unnecessary liabilities and cleanup costs in the future. The objectives are to provide the State with adequate security to allow rehabilitation of a site to the point of preventing further or future pollution, and health and safety hazards should a facility owner default.

    1.1. The parameters used to calculate the proper bond amount are: pit area, storage capacity, and volume of waste stored.

    1.2. Bonds accepted shall be of the same type as those accepted for wells i.e. surety, collateral, or a combination of the two as described in the R649-3-1.

    1.2.1. In order to assist owners of facilities operating prior to 1997 to establish bonding, the total bond amount provided may consist of an initial amount as determined by the division and an additional amount collected at a price per barrel and/or price per cubic yard of waste collected until the total bond amount is reached.

    1.2.2. The total bond will be held by the division or financial institution until the facility has been closed and inspected by the division in accordance with a division approved closure plan.

    1.3. Total bond amount is calculated using values for pit area, pit storage capacity, and volume of stock piled waste material.

    1.3.1. No salvage value of equipment or removal cost is used.

    1.3.2. This bond will only be used by the State to treat or remove waste from the site and secure the facility to prevent any future contamination should the facility owner default on cleanup responsibilities.

    1.3.3. Bond amounts will be calculated as follows, and the per volume or per acre figures may be adjusted periodically to compensate for change in cost to perform the necessary cleanup work:

    $14,000 per acre of pit, partial acres will be calculated at the rate of $14,000 per acre; plus

    $1.00 per barrel of produced water for one-quarter of the total storage capacity of the facility; plus

    $30 per cubic yard of solid or semi-solid waste material stockpiled at the facility.

    $10,000 Minimum bond amount.

    1.4. All commercial disposal facilities (except injection wells covered by R649-3-1) will be covered by an adequate and acceptable bond before being permitted to accept any exploration and production waste. The initial and minimum bond payment will be at least $10,000. The total bond amount will be calculated as described in Subsection R649-9-9(1.3). If requested by the disposal facility owner, the bond beyond the initial amount may be posted at a rate of two cents per barrel of liquid or sixty cents per cubic yard of solid/semi-solid waste material accepted for disposal at the facility.]

    R649-9-1. Introduction.

    1. Section 40-6-5 UCA authorizes the board to regulate the disposal of produced water and oil-field wastes. It is the intent of the board and division to regulate E and P wastes and facilities for the disposal of these wastes in a manner that protects the environment, limits liability to producers, and minimizes the volume of waste.

    2. These rules specify the informational and procedural requirements for waste management and disposal, the permitting of disposal facilities and the cleanup requirements for E and P waste related sites.

    3. Design and construction requirements for disposal facilities approved prior to July 1, 2013 shall remain as previously permitted. Design and construction changes to these facilities after July 1, 2013 shall meet the following requirements as determined by the division.

    4. These rules are intended for E and P waste disposal facilities excluding Class II injection wells and pits associated with wells.

     

    R649-9-2. General Waste Management.

    1. Wastes addressed by these rules are E and P Wastes that are exempt from the RCRA hazardous waste management requirements.

    1.1. Before using a commercial disposal facility the operator may contact the division to verify the status of the facility. The division regularly updates this information on the Division of Oil, Gas and Mining web site.

    1.2. Each site and/or facility used for disposal must be permitted and in good standing with the division.

    1.3. All approved disposal facilities not located at a well site shall be identified with a suitable sign showing facility name, operator, location and emergency number.

    1.4. The disposal facility shall be fenced and maintained to deter access by livestock and wildlife and, if determined necessary by the division, equipped with flagging or netting to deter entry by birds and waterfowl.

    2. Reduction of the amount of material generated that must be disposed of is the preferred practice.

    2.1. Recycling should be used whenever possible and practical.

    2.2. In general, good housekeeping practices shall be used.

    2.3. Operators shall catch leaks, drips, contain spills, and cleanup promptly.

    2.4. Disposal facilities shall be operated in accordance with an approved application and in a manner that does not cause safety or health hazards.

    3. The method of disposal used shall be compatible with the waste that is the subject of disposal.

    3.1. Whenever possible, injection of E and P waste into approved Class II wells is the division's preference.

    3.2. RCRA exempt waste shall not be mixed with nonexempt waste.

    4. Every operator shall submit, to the division, an Annual Waste Management Plan by January 15 of each year to account for the proper disposition of produced water and other E and P Wastes. This plan will include:

    4.1. The type and estimated annual volume of wastes that will be or have been generated.

    4.2. The facilities to be used for disposal.

    4.3. The description of any waste reduction or minimization procedures.

    4.4. Any onsite disposal/treatment methods or programs to be implemented by the operator.

    4.5. If changes are made to the plan during the year, then the operator shall notify the division in writing, within 30 days, of this change.

     

    R649-9-3. Permit and Application Requirements for Disposal Facilities.

    1. No waste disposal facility shall operate without a division-issued permit.

    2. Applications for new disposal facilities or modifications shall be submitted to the division and shall include the following:

    2.1. Previously submitted material may be included by reference provided they are current and readily available to the division.

    2.2. Evidence justifying the need for the proposed facility or expansion of an existing facility.

    2.3. Names and addresses of all applicants, principal officers and owners with 25 percent or more interest in the facility.

    2.4. Materials or products to be applied to the land surface or subsurface shall meet the division's current cleanup levels for contaminated soil and other wastes.

    2.5. If leachability and/or toxicity are of concern due to the type or source(s) of wastes, tests will be required and may utilize the Toxicity Characteristic Leaching Procedure (TCLP), Synthetic Precipitation Leaching Procedure (SPLP) or any other test approved by the division.

    2.6. A contingency plan designed to minimize any hazards to fresh water, public health and safety, or the environment in the event of an unplanned fire, explosion, or a release of contaminants or oil field waste to the air, soil, surface water or ground water.

    2.7. A solid waste stream management plan describing all chemical processes, estimated volumes and chemical profiles used in the treatment of waste and odor, any products generated by these processes, method and schedule for disposal of precipitated solids and complete list of all wastes to be accepted at the facility.

    2.8. A topographic map and drawing of the site, on a suitable scale, that identifies all geologic cross sections, side slopes, equipment, secondary containment, test borings, roads, fences, gates, wells and springs, drainage patterns, pipelines, surface area to be disturbed, buildings and chemical storage areas within one mile of the site perimeter and location relative to other site facilities. The drawings shall be of professional quality.

    3. Siting requirements for new disposal facilities and modifications.

    3.1. The disposal facility shall be located on level, stable ground, and an acceptable distance away from any established or intermittent drainage.

    3.2. The disposal facility shall be located a minimum of one mile from residences or occupied buildings not associated with the facility unless a wavier has been signed by the owners of the residences and buildings within one mile.

    4. Geologic and hydrological requirements for new disposal facilities or modifications.

    4.1. The disposal facility shall not be located in a geologically or hydrologically unsuitable area, such as aquifer recharge areas, protection zones for public drinking water sources, flood plains, drainage bottoms, and areas on or near faults, within 500 feet of a wetland, water-course or lakebed, permeable soil where ground water is less than 50 feet below the lowest elevation at which the operator will place oilfield waste, or within the area overlying a subsurface mine.

    4.2. Regional and local geologic information shall include bedrock strike and dip, fracture patterns, slope stability, faulting, folding, rockfall, landslides, subsidence or erosion potential, and surface water features that may affect the design and operation of the facility.

    4.3. Geological and hydrological evidence showing that the proposed disposal method will not adversely affect existing water quality or major uses of such waters.

    4.3.1. Any intentional discharge of water will require an additional permit from the Division of Water Quality.

    4.4. Test borings shall be taken in sufficient quantity and to an adequate depth, not to exceed 50 feet, to define subsurface conditions to assure that the facility will be constructed on a firm stable base.

    4.5. Representative analysis of facility surface and subsurface soils submitted to the division shall include TDS, major cations and anions or other analysis determined necessary by the division for establishing background soil concentrations.

    4.6. Geologic cross-sections submitted to the division shall include depth to shallow ground water, formation names, and type and name of the shallowest fresh water aquifer beneath the proposed site.

    4.7. If determined necessary by the division, applicant shall submit ground water analysis of the aquifer(s) beneath the proposed site.

    4.8. If determined necessary by the division, applicant shall submit potentiometric maps of the shallowest aquifer(s).

    5. Engineering and design requirements for new disposal facilities and modifications.

    5.1. Disposal facilities shall be designed and sealed by a registered engineer and inspected by a registered engineer during construction.

    5.1.1. A construction certification shall be submitted, by the engineer, prior to the Division issuing an operation permit for the facility.

    5.2. The disposal facility shall be designed appropriately for the intended purpose.

    5.3. Facilities shall be designed, constructed and operated so as to contain liquids and solids in a manner that will protect fresh water, public health and safety, and the environment for the life of the operation.

    5.3.1. The disposal facility shall be designed with secondary containment to capture the largest potential release in the event of a catastrophic failure.

    5.4. Facilities shall be designed and constructed so as to prevent run-on and run-off of surface water, up to peak discharge from a 25 year, 24 hour storm.

    5.5. The facility shall be designed such that disposal can only occur when an attendant is on duty, unless loads can be monitored or otherwise isolated for inspection before disposal or other security measures approved by the division.

     

    R649-9-4. Specific Requirements Applicable to Evaporation Facilities.

    1. Evaporation facilities shall be designed, constructed and operated to meet the following specific requirements in addition to R649-9-3, Permit and Application Requirements for Disposal Facilities.

    2. Applicant shall submit detailed construction/installation diagrams of ponds, side slopes, liners, pond storage capacity, leak detection systems, dikes or levees, wind fences, piping, enhanced evaporation systems with justification, water treatment systems and tanks.

    2.1. Detailed information shall be submitted for all enhanced evaporation systems which demonstrates that unlawful discharge will not occur.

    2.2. The facility shall be designed, maintained and operated to separate oil from produced water prior to discharge into a pond.

    3. Applicant shall submit detailed construction/installation diagrams of unloading facilities and an explanation of the method for controlling and disposing of any liquid hydrocarbon accumulation on the ponds.

    3.1. The unloading facility shall be designed, maintained and operated to adequately process the anticipated maximum daily quantity of produced water.

    3.2. The unloading facility shall be designed with a leak detection system if determined necessary by the division.

    3.2.1. Applicant shall submit procedures for repair should leakage occur.

    4. Applicant shall submit the maximum daily quantity of water to be disposed of and a representative water analysis of such water that includes the concentrations of chlorides and sulfates, pH, total dissolved solids "TDS", and information regarding any other significant constituents if requested by the division.

    5. Applicant shall submit climatological data describing the average annual evaporation and precipitation.

    6. Ponds shall be designed, maintained and operated to meet the following requirements.

    6.1. Ponds shall be designed for 10 acre-feet of water or less, unless otherwise approved by the division.

    6.2. Ponds shall have adequate storage capacity to safely contain all produced water even during those periods when evaporation rates are at a minimum.

    6.3. Ponds shall be designed to prevent unauthorized surface or subsurface discharge of water.

    6.4. Ponds shall be designed to include a 2-foot free-board at all times.

    6.5. Pond levees shall be constructed so that the inside grade of the levee is no steeper than 3:1 and the outside grade no steeper than 2:1.

    6.5.1. The top of the levee shall be level and of sufficient width to allow for adequate compaction.

    6.5.2. Vertical height of the levees shall not exceed 25 percent of the total vertical depth of the pond.

    7. Ponds shall be designed with two synthetic liners, an upper primary and lower secondary liner, with a leak detection system between them. Synthetic liners shall be installed according to the manufacturer's instructions.

    7.1. The primary liner shall be impervious (a hydraulic conductivity no greater than 1 x 10-9 cm/sec) and constructed with a minimum 60-mil HDPE or equivalent liner approved by the division.

    7.2. The secondary liner shall be impervious and constructed with a minimum 40-mil HDPE or equivalent liner approved by the division.

    7.3. If rigid materials are used, leak proof expansion joints shall be provided, or the material shall be of sufficient thickness and strength to withstand expansion, contraction and settling movements in the underlying earth, without cracking.

    7.4. Materials used in lining ponds shall be impervious and resistant to weather, tears and punctures, sunlight, hydrocarbons, aqueous acids, alkalies, salt, fungi, or other substances that might be contained in the produced water.

    7.5. Applicant shall submit the type, thickness, strength, and life span of material(s) to be used for lining the pond and the method of installation.

    7.6. Applicant shall submit procedures for repair of the liner, should leakage occur.

    8. Applicant shall submit detailed construction/installation diagram for the leak detection system.

    8.1. The leak detection design shall include, a drainage and collection system placed between the upper and lower liners and sloped so as to facilitate the earliest possible detection of a leak.

    8.2. The leak detection design shall include a vertical riser outside the dike allowing direct visual inspection of the sump from the surface.

    8.2.1. The sump shall be designed to extend a minimum of two feet below the inlet line from the pond, allowing visual detection of any fluid and sampling of fluid.

    8.2.2. Designed with a removable top for the sump riser that will prevent entry of fluids.

    8.3. Designed with leak detection piping capable of withstanding chemical attack from oil field waste, structural loading from stresses and disturbances from overlying oil field waste and cover materials, equipment operation, expansion and/or contraction, and facilitate clean-out maintenance.

    9. Evaporation facilities shall be operated to separate oil from produced water prior to discharge into a pond and prevent unauthorized surface discharge of water.

    9.1. Hydrocarbon accumulation, other than de minimis quantities, on an evaporation pond is considered a violation and shall be removed within 24 hours.

    9.2. Overspray from sprinklers and/or overspray caused by wind, including foam, outside lined areas are considered a violation and shall be corrected immediately.

    9.3. Sampling and testing of soils suspected to be contaminated from overspray may be required by the division.

     

    R649-9-5. Specific Requirements Applicable to Landfarms.

    1. Landfarms for the bioremediation of oil contaminated soils and materials shall be designed and constructed to meet the following specific requirements in addition to R649-9-3, Permit and Application Requirements for Disposal Facilities.

    1.1. Landfarms shall be constructed on native soil with a hydraulic conductivity of no greater than 1 x 10-6 cm/sec.

    1.2. With division approval, fresh water may be added as necessary to enhance bioremediation and control dust.

    1.3. Application of microbes and nutrients for enhancing bioremediation requires prior division approval.

    2. Landfarms shall be operated to meet the following requirements:

    2.1. E and P waste accepted by the landfarm shall be sufficiently free of liquid content to pass a 60-mesh liquid paint filter test.

    2.2. Pooling of liquids in the landfarm is prohibited. The operator shall remove freestanding liquid within 24 hours.

    2.3. Within 72 hours after receipt of E & P waste the operator shall spread and disk the waste in twelve-inch or less lifts.

    2.4. Soils shall be disked and turned regularly, a minimum of once a month.

    2.5. Conduct treatment and soil monitoring to ensure that prior to adding an additional lift the soil concentrations do not exceed the division's current salinity and hydrocarbon cleanup standards.

    2.6. Maintain records of the landfarm remediation activity. The records shall be readily accessible for division review.

     

    R649-9-6. Other Disposal Facility Requirements.

    1. Facilities used for the treatment and disposal of E and P wastes other than evaporation ponds and landfarms shall be permitted by the division. This may include activities such as composting, solidifying, other bioremediation, water treatment, and others.

    2. Application Requirements for Other Disposal Facilities require the following in addition to R 649-9-3, Permit and Application Requirements for Disposal Facilities:

    2.1. A complete description of the proposed facility.

    2.2. Processes involved including a complete list of all wastes to be accepted at the facility and products generated.

    2.3. Maps and drawings of suitable scale showing all facilities and equipment.

     

    R649-9-7. Noticing of Disposal Facilities.

    1. The applicant for a new facility or major modification shall give written notice of the application, by certified mail, return receipt requested, to surface and mineral owners of record within one-half mile of the facility, the county commission of the county where the facility is located, and affected tribal and government agencies.

    1.1. The notice shall include information describing the facility's location, basic plan of operations, and the applicant's name and address.

    1.2. The applicant shall furnish the division proof of required notices.

    1.3. The division may extend the distance requirements for notice if the division determines that the proposed disposal facility has the potential to adversely impact fresh water, public health, safety or the environment at a distance greater than one-half mile.

    2. Within 30 days of the submission of an application for a disposal facility, the division shall review the application as to its completeness and adequacy for the intended purpose and shall require such changes that are found necessary to assure compliance with the applicable rules. If the application is in order, the division shall provide for a public notice to be published in a newspaper of general circulation in the county where the facility is to be located.

     

    R649-9-8. Bonding of Disposal Facilities.

    1. Disposal facilities, other than injection wells and their associated facilities, shall be bonded according to this rule in order to protect the State and oil and gas producers from unnecessary liabilities and cleanup costs in the future. The objectives are to provide the State with adequate security for site reclamation and post closure cost should a facility owner default.

    2. Permits issued after July 1, 2013 for new disposal facilities or modifications and facilities being reviewed for 5-year permit renewals, shall submit site reclamation and post closure cost estimates from a responsible third party contractor for division approval.

    2.1. The applicant shall bond in the amount of the approved estimated site reclamation and post closure costs, or $25,000, whichever is greatest.

    3. Bonds accepted shall be of the same type as those accepted for wells i.e. surety, collateral, or a combination of the two as described in the R649-3-1.

    4. The total bond will be held by the division or financial institution until the facility has been closed and inspected by the division in accordance with a division approved closure plan.

    5. Bond amounts, for permits approved prior to July 1, 2013 will be calculated as follows, and the per volume or per acre figures may be adjusted periodically to compensate for change in cost to perform the necessary cleanup work:

    $14,000 per acre of pit, partial acres will be calculated at the rate of $14,000 per acre; plus

    $1.00 per barrel of produced water for one-quarter of the total storage capacity of the facility; plus

    $30 per cubic yard of solid or semi-solid waste material stockpiled at the facility.

    $10,000 Minimum bond amount.

    5.1. Operators of disposal facilities permitted prior to July 1, 2013 shall have until July 1, 2018 (five years) to submit, to the division, a disposal facility site reclamation and post closure bond as required above in R649-9-8.2.

    6. All disposal facilities, except injection wells covered by R649-3-1, will be covered by an adequate and acceptable bond before being permitted to accept any E and P waste.

    7. Forfeiture of the bond shall be the same as those for wells as described in the R649-3-1.16.

     

    R649-9-9. Permit and Renewal Approval, Denial, Revocation, Suspension, Modification or Transfer.

    1. Permit and renewal approval.

    1.1. Construction approvals issued by the division are valid for one year from approval date. An extension may be granted by the division.

    1.2. Operating approvals issued by the division for waste management facilities shall remain in effect for five years from the approval date.

    1.3. After division review, permits may be renewed for successive 5-year terms.

    1.3.1. Prior to renewal approval, the division shall review the operation, compliance history, bonding and technical requirements for the disposal facility.

    1.3.2. The division, after notice to the operator, may require modifications of the disposal facility permit, including modifications necessary to the facility permit terms and conditions consistent with statutes, rules or judicial decisions.

    2. An application may be denied if:

    2.1. A complete application is not submitted.

    2.2. The application does not meet R649-9-3.3 on siting and/or R649-9-3.4 on geologic and hydrologic requirements.

    2.3. The proposed disposal facility or modification may be detrimental to fresh water, public health, safety or the environment.

    2.4. The applicant is unable to justify good cause for the proposed facility.

    2.5. An applicant or owner in the facility has a history of failure to comply with division rules and orders, state or federal environmental laws, or is in current violation of a division or board order requiring corrective action.

    3. Revocation, suspension, or modification of a permit.

    3.1. The division may revoke, suspend, or impose additional operating conditions or limitations on a disposal facility permit at any time, for good cause, after notice to the operator.

    3.2. The division may suspend a waste disposal permit or impose additional conditions or limitations in an emergency to forestall an imminent threat to fresh water, public health, safety or the environment.

    3.3. Suspension of a disposal facility permit may be for a fixed period of time or until the operator remedies the violation or potential violation.

    3.4. If the division suspends a disposal facility permit, the disposal facility shall not accept oil field waste during the suspension period.

    4. Transfer of a permit.

    4.1. The operator shall not transfer a permit without the division's prior written approval.

    4.2. A request for transfer of a permit shall identify officers, directors and owners of 25 percent or greater in the transferee.

    4.3. Unless the director otherwise orders, public notice or hearing are not required for the transfer request's approval.

    4.4. If the division denies the transfer request, it shall notify the operator and the proposed transferee of the denial by certified mail, return receipt requested, and either the operator or the transferee may request, within 10 days of receipt of the notice, a public hearing before the board.

    4.5. Until the division approves the transfer and the required assurance is in place, the division shall not release the transferor's financial assurance.

     

    R649-9-10. Construction and Inspection Requirements for Disposal Facilities.

    1. Division personnel shall be afforded a reasonable opportunity for inspection of any proposed disposal facility during the construct8ion and operation of the facility.

    2. The division shall be notified at least 72 hours prior to the installation of leak detection systems or liners.

    3. The division shall be notified after completion of facility construction so that a final inspection can be conducted to verify that the facility has been constructed in accordance with the approved application.

    4. Failure to meet the requirements and standards for construction and operation of a disposal facility shall be considered as noncompliance and will result in the imposition of corrective actions and compliance schedules or a cessation of operations order.

     

    R649-9-11. Reporting and Recordkeeping for Disposal Facilities.

    1. All unauthorized discharges or spills from disposal facilities including water observed in a leak detection system shall be reported, within 24 hours, to the division.

    2. Each producer who utilizes any approved produced water disposal facility shall comply with the reporting requirements of R649-8-11.

    3. Each operator of a disposal facility, excluding disposal wells, shall report to the division on a quarterly basis.

    3.1. This report shall include the volume and type of wastes received at the facility during the quarter and results of the weekly leak detection system inspections.

    3.2. Berms and outside walls shall be inspected quarterly and after a major rainfall or windstorm. Berm erosion or loss of integrity shall be reported to the division and may require immediate action.

    4. The occurrence of water in a leak detection system during operation constitutes liner failure and requires immediate action.

    4.1. The division has the option of allowing the operator a short period of time to take corrective action.

    4.2. Further utilization will be allowed only after liner repairs and an inspection by the division.

    5. Each owner/operator of a disposal facility shall keep records showing at a minimum the following: date and time waste was received, origin, volume, type, transporter, and generator of the waste. These records shall be available for inspection by the division for at least six years.

     

    R649-9-12. Closure and Post Closure of Disposal Facilities.

    1. A plan for final closure of a disposal facility shall be submitted to the division, for approval, at least 60 days prior to cessation of operations. The closure plan shall include the following:

    1.1. Provisions for removal of all equipment, buildings, fences and roads at the site.

    1.2. Removal of berms.

    1.3. Removal of liquids and solid waste to a division approved facility.

    1.4. Disposal method for liners.

    1.5. Plans and procedures for sampling and testing soils and ground water at the site.

    1.5.1. Soils shall meet division cleanup standards or background levels whichever is less stringent.

    1.6. A monitoring plan if required by the division.

    1.7. Consideration of post disposal land use and landowner requests when the closure plan is developed.

    2. During closure operations, the operator shall maintain the disposal facility to protect fresh water, public health, safety and the environment.

    3. Location of the closed disposal facility shall be documented with the county recorder's office.

    4. The bond for the disposal facility will be released when the division approved closure plan requirements have been met, as determined by the division.

     

    R649-9-13. Variances from Requirements and Standards.

    Requests for approval of a variance from any of the requirements or standards of these rules shall be submitted to the director in writing and provide information as to the circumstances that warrant approval of the requested variance and the proposed alternative means by which the requirements or standards will be satisfied.

     

    KEY: oil and gas law

    Date of Enactment or Last Substantive Amendment: [June 2, 1998]2013

    Notice of Continuation: February 3, 2012

    Authorizing, and Implemented or Interpreted Law: [40-6-1 et seq.]40-6-5(3)

     


Document Information

Hearing Meeting:
05/30/2013 09:00 AM, Uintah Basin ATC, 1100 E Lagoon St., Roosevelt, UT
Effective Date:
7/1/2013
Publication Date:
05/15/2013
Filed Date:
04/25/2013
Agencies:
Natural Resources,Oil, Gas and Mining; Oil and Gas
Rulemaking Authority:

Subsection 40-6-5(3)

Authorized By:
John Baza, Director
DAR File No.:
37545
Related Chapter/Rule NO.: (1)
R649-9. Waste Management and Disposal.