No. 32406 (Amendment): R309-510. Facility Design and Operation: Minimum Sizing Requirements  

  • DAR File No.: 32406
    Filed: 02/26/2009, 10:26
    Received by: NL

    RULE ANALYSIS

    Purpose of the rule or reason for the change:

    The purpose of this amendment is to address the conditions for which a reduction of requirements may be granted and the method of determining a value.

    Summary of the rule or change:

    This amendment clears up misgivings concerning what type of data is acceptable for a reduction of required source capacity, water right, and peak instantaneous demands; and establishes a number (90th percentile of readings) as a final value.

    State statutory or constitutional authorization for this rule:

    Section 19-4-104

    Anticipated cost or savings to:

    the state budget:

    None--Since this amendment only clarifies this portion of the rule, and the reduced quantity for either source capacity, water right, or peak instantaneous demands will not increase workload or require additional personnel or other funds from the state budget.

    local governments:

    Little to None--Most, if not all, well functioning Public Water Systems operated by local government currently meet or exceed the minimum sizing requirements. This change will only impact those non-community type systems where water usage is less than required by rule. In these cases, after submission of acceptable data, these systems should be able to expand the number of service connections without adding new source capacity, water right, or increased piping.

    small businesses and persons other than businesses:

    Little to None--This change will only impact those non-community type systems where water usage is less than required by rule. In these cases, after submission of acceptable data, these systems should be able to expand the number of service connections without adding new source capacity, water right, or increased piping.

    Compliance costs for affected persons:

    Little to None--This change will only impact those non-community type systems where water usage is less than required by rule. In these cases, after submission of acceptable data, these systems should be able to expand the number of service connections without adding new source capacity, water right, or increased piping. By expanding the number of service connections, cost of water service to individuals served by these systems should actually be reduced.

    Comments by the department head on the fiscal impact the rule may have on businesses:

    The department agrees that the proposed changes to this rule will have little to no detrimental impact on existing water systems or to new public water systems. William Sinclair, Acting Executive Director

    The full text of this rule may be inspected, during regular business hours, at the Division of Administrative Rules, or at:

    Environmental Quality
    Drinking Water
    150 N 1950 W
    SALT LAKE CITY UT 84116-3085

    Direct questions regarding this rule to:

    Bill Birkes at the above address, by phone at 801-536-4201, by FAX at 801-536-4211, or by Internet E-mail at bbirkes@utah.gov

    Interested persons may present their views on this rule by submitting written comments to the address above no later than 5:00 p.m. on:

    04/14/2009

    This rule may become effective on:

    04/21/2009

    Authorized by:

    Ken Bousfield, Director

    RULE TEXT

    R309. Environmental Quality, Drinking Water.

    R309-510. Facility Design and Operation: Minimum Sizing Requirements.

    R309-510-5. Reduction of Requirements.

    If acceptable data are presented, certain number of days of peak day demand to establish minimum source capacity; certain number of years of annual demand to establish minimum water right requirements; and certain number of readings of peak hourly demand to establish minimum peak instantaneous demand;[at or above the 90% confidence level,] showing that the requirements made herein are excessive for a given project, the requirements may be appropriately reduced to the 90th percentile of readings, on a case by case basis by the Executive Secretary. In the case of Recreational Home Developments, in order to qualify for a quantity reduction, not only must the actual water consumption be less than quantities required by rule [(with the confidence level indicated above) ]but enforceable policy restrictions must have been approved which prevent the use of such dwellings as a permanent domicile and these restrictions shall have been consistently enforced. The Executive Secretary may re-consider any reduced minimums if the nature and use of the system changes.

     

    R309-510-7. Source Sizing.

    (1) Peak Day Demand and Average Yearly Demand.

    Sources shall legally and physically meet water demands under two separate conditions. First, they shall meet the anticipated water demand on the day of highest water consumption. This is referred to as the peak day demand. Second, they shall also be able to provide one year's supply of water, the average yearly demand.

    (2) Estimated Indoor Use.

    In the absence of firm water use data, Tables 510-1 and 510-2 shall be used to estimate the peak day demand and average yearly demand for indoor water use.

     

    TABLE 510-1
    Source Demand for Indoor Use


    Type of Connection Peak Day Demand Average Yearly Demand

    Year-round use
    Residential 800 gpd/conn 146,000 gal./conn
    ERC 800 gpd/ERC 146,000 gal./ERC
    Seasonal/Non-residential use
    Modern Recreation Camp 60 gpd/person (see note 1)
    Semi-Developed Camp
    a. with pit privies 5 gpd/person (see note 1)
    b. with flush toilets 20 gpd/person (see note 1)
    Hotel, Motel, and Resort 150 gpd/unit (see note 1)
    Labor Camp 50 gpd/person (see note 1)
    Recreational Vehicle Park 100 gpd/pad (see note 1)
    Roadway Rest Stop 7 gpd/vehicle (see note 1)
    Recreational Home Development 400 gpd/conn (see note 1)

    Note 1. Annual demand shall be based on the number of days the
    system will be open during the year times the peak day demand
    unless data acceptable to the Division, with a confidence level of
    90% or greater showing a lesser annual consumption, can be presented.

     

    TABLE 510-2
    Source Demand for Individual Establishments(a)
    (Indoor Use)


    Type of Establishment Peak Day Demand
    (gpd)
    Airports
    a. per passenger 3
    b. per employee 15
    Boarding Houses
    a. for each resident boarder and employee 50
    b. for each nonresident boarders 10
    Bowling Alleys, per alley
    a. with snack bar 100
    b. with no snack bar 85
    Churches, per person 5
    Country Clubs
    a. per resident member 100
    b. per nonresident member present 25
    c. per employee 15
    Dentist's Office
    a. per chair 200
    b. per staff member 35
    Doctor's Office
    a. per patient 10
    b. per staff member 35
    Fairgrounds, per person 1
    Fire Stations, per person
    a. with full-time employees and food prep. 70
    b. with no full-time employees and no food prep. 5
    Gyms
    a. per participant 25
    b. per spectator 4
    Hairdresser
    a. per chair 50
    b. per operator 35
    Hospitals, per bed space 250
    Industrial Buildings, per 8 hour shift,
    per employee (exclusive of industrial waste)
    a. with showers 35
    b. with no showers 15
    Launderette, per washer 580
    Movie Theaters
    a. auditorium, per seat 5
    b. drive-in, per car space 10
    Nursing Homes, per bed space 280
    Office Buildings and Business Establishments,
    per shift, per employee (sanitary wastes only)
    a. with cafeteria 25
    b. with no cafeteria 15
    Picnic Parks, per person (toilet wastes only) 5
    Restaurants
    a. ordinary restaurants (not 24 hour service) 35 per seat
    b. 24 hour service 50 per seat
    c. single service customer utensils only 2 per customer
    d. or, per customer served
    (includes toilet and kitchen wastes) 10
    Rooming House, per person 40
    Schools, per person
    a. boarding 75
    b. day, without cafeteria, gym or showers 15
    c. day, with cafeteria, but no gym or showers 20
    d. day, with cafeteria, gym and showers 25
    Service Stations(b) ,per vehicle served 10
    Skating Rink, Dance Halls, etc., per person
    a. no kitchen wastes 10
    b. Additional for kitchen wastes 3
    Ski Areas, per person (no kitchen wastes) 10
    Stores
    a. per public toilet room 500
    b. per employee 11
    Swimming Pools and Bathhouses(c) ,per person 10
    Taverns, Bars, Cocktail Lounges, per seat 20
    Visitor Centers, per visitor 5

    NOTES FOR TABLE 510-2:
    1. Source capacity must at least equal the peak day
    demand of the system. Estimate this by assuming the facility
    is used to its maximum.
    2. Generally, storage volume must at least equal one
    average day's demand.
    3. Peak instantaneous demands may be estimated by
    fixture unit analysis as per Appendix E of the 2006[200]
    International Plumbing Code.
    (a) When more than one use will occur, the multiple
    use shall be considered in determining total demand.
    Small industrial plants maintaining a cafeteria and/or showers
    and club houses or motels maintaining swimming pools and/or
    laundries are typical examples of multiple uses. Uses other
    than those listed above shall be considered in relation to
    established demands from known or similar installations.
    (b) or 250 gpd per pump,
    (c) 20 x {Water Area (Ft2) / 30} + Deck Area (Ft2)

     

    (3) Estimated Outdoor Use.

    In the absence of firm water use data, Table 510-3 shall be used to estimate the peak day demand and average yearly demand for outdoor water use. The following procedure shall be used:

    (a) Determine the location of the water system on the map entitled Irrigated Crop Consumptive Use Zones and Normal Annual Effective Precipitation, Utah as prepared by the Soil Conservation Service (available from the Division). Find the numbered zone, one through six, in which the water system is located (if located in an area described "non-arable" find nearest numbered zone).

    (b) Determine the net number of acres which may be irrigated. This is generally done by starting with the gross acreage, then subtract out any area of roadway, driveway, sidewalk or patio pavements along with housing foundation footprints that can be reasonably expected for lots within a new subdivision or which is representative of existing lots. Before any other land area which may be considered "non-irrigated" (e.g. steep slopes, wooded areas, etc.) is subtracted from the gross area, the Division shall be consulted and agree that the land in question will not be irrigated.

    (c) Refer to Table 510-3 to determine peak day demand and average yearly demand for outdoor use.

    (d) The results of the indoor use and outdoor use tables shall be added together and source(s) shall be legally and physically capable of meeting this combined demand.

     

    TABLE 510-3
    Source Demand for Irrigation
    (Outdoor Use)


    Map Zone Peak Day Demand Average Yearly Demand
    (gpm/irrigated acre) (AF/irrigated acre)
    1 2.26 1.17
    2 2.80 1.23
    3 3.39 1.66
    4 3.96 1.87
    5 4.52 2.69
    6 4.90 3.26

     

    (4) Accounting for Variations in Source Yield.

    The design engineer shall consider whether flow from the source(s) may vary. Where flow varies, as is the case for most springs, the minimum flowrate shall be used in determining the number of connections which may be supported by the source(s). Where historical records are sufficient, and where peak flows from the source(s) correspond with peak demand periods, the Executive Secretary may grant an exception to this requirement.

     

    R309-510-8. Storage Sizing.

    (1) General.

    Each storage facility shall provide:

    (a) equalization storage volume, to satisfy average[peak] day demands for water for indoor use as well as outdoor use,

    (b) fire suppression storage volume, if the water system is equipped with fire hydrants and intended to provide fire suppression water, and

    (c) emergency storage, if deemed appropriate by the water supplier or the Executive Secretary, to meet demands in the event of an unexpected emergency situation such as a line break or a treatment plant failures.

    (2) Equalization Storage.

    (a) All public drinking water systems shall be provided with equalization storage. The amount of equalization storage which must be provided varies with the nature of the water system, the extent of outdoor use and the location of the system.

    (b) Required equalization storage for indoor use is provided in Table 510-4. Storage requirements for non-community systems not listed in this table shall be determined by calculating the average day demands from the information given in Table 510-2.

     

    TABLE 510-4
    Storage Volume for Indoor Use


    Type Volume Required
    (gallons)
    Community Systems
    Residential;
    per single resident service connection 400
    Non-Residential[Residentail];
    per Equivalent Residential Connection (ERC) 400

    Non-Community Systems
    Modern Recreation Camp; per person 30
    Semi-Developed Camp; per person
    a. with Pit Privies 2.5
    b. with Flush Toilets 10
    Hotel, Motel and Resort; per unit 75
    Labor Camp; per unit 25
    Recreational Vehicle Park; per pad 50
    Roadway Rest Stop; per vehicle 3.5
    Recreational Home Development; per connection 400

     

    (c) Where the drinking water system provides water for outdoor use, such as the irrigation of lawns and gardens, the equalization storage volumes estimated in Table 510-5 shall be added to the indoor volumes estimated in Table 510-4. The procedure for determining the map zone and irrigated acreage for using Table 510-5 is outlined in Section R309-510-7(3).

     

    TABLE 510-5
    Storage Volume for Outdoor Use


    Map Zone Volume Required
    (gallons/irrigated acre)
    1 1,782
    2 1,873
    3 2,528
    4 2,848
    5 4,081
    6 4,964

     

    (3) Fire Suppression Storage.

    Fire suppression storage shall be required if the water system is intended to provide fire fighting water as evidenced by fire hydrants connected to the piping. The design engineer shall consult with the local fire suppression authority regarding needed fire flows in the area under consideration. This information shall be provided to the Division. Where no local fire suppression authority exists, needed fire suppression storage shall be assumed to be 120,000 gallons (1000 gpm for 2 hours).

    (4) Emergency Storage.

    Emergency storage shall be considered during the design process. The amount of emergency storage shall be based upon an assessment of risk and the desired degree of system dependability. The Executive Secretary may require emergency storage when it is warranted to protect public health and welfare.

     

    R309-510-9. Distribution System Sizing.

    (1) General Requirements.

    The distribution system shall be designed to insure that minimum water pressures as required in R309-105-9 exist at all points within the system. If the distribution system is equipped with fire hydrants, the Division will require a letter from the local fire authority stating the fire flow and duration required of the area to insure the system shall be designed to provide minimum pressures as required in R309-105-9 to exist at all points within the system when needed fire flows are imposed upon the peak day demand flows of the system.

    (2) Indoor Use, Estimated Peak Instantaneous Demand.

    (a) For community water systems and large non-community systems, the peak instantaneous demand for each pipeline shall be assumed for indoor use as:

    Q = 10.8 x N0.64

    where N equals the total number of ERC's, and Q equals the total flow (gpm) delivered to the total connections served by that pipeline.

    For Recreational Vehicle Parks, the peak instantaneous flow for indoor use shall be based on the following:

     

    TABLE 510-6


    Peak Instantaneous Demand for Recreational Vehicle Parks

    Number of Connections Formula
    0 to 59 Q = 4N
    60 to 239 Q = 80 + 20N0.5
    240 or greater Q = 1.6N

    NOTES FOR TABLE 510-6:
    Q is total peak instantaneous demand (gpm) and N is the
    maximum number of connections. However, if the only water use
    is via service buildings the peak instantaneous demand shall
    be calculated for the number of fixture units as presented in
    Appendix E of the 2006[2000] International Plumbing Code.

     

    (b) For small non-community water systems the peak instantaneous demand to be estimated for indoor use shall be calculated on a per-building basis for the number of fixture units as presented in Appendix E of the 2006[2000] International Plumbing Code.

    (3) Outdoor Use, Estimated Peak Instantaneous Demand.

    Peak instantaneous demand to be estimated for outdoor use is given in Table 510-7. The procedure for determining the map zone and irrigated acreage for using Table 510-7 is outlined in Section R309-510-7(3).

     

    TABLE 510-7


    Peak Instantaneous Demand for Outdoor Use

    Map Zone Peak Instantaneous Demand
    (gpm/irrigated acre)
    1 4.52
    2 5.60
    3 6.78
    4 7.92
    5 9.04
    6 9.80

     

    (4) Fire Flows.

    (a) Distribution systems shall be designed to deliver needed fire flows if fire hydrants are provided. The design engineer shall consult with the local fire suppression authority regarding needed fire flows in the area under consideration. This information shall be provided to the Division. Where no local fire suppression authority exists, needed fire flows shall be assumed to be 1000 gpm unless the local planning commission provides a letter indicating that the system will not be required to provide any fire flows, in which case fire hydrants will not be allowed to be installed on any mains.

    (b) If a distribution system is equipped with fire hydrants, the system shall be designed to insure that minimum pressures required by R309-105-9 exist at all points within the system when fire flows are added to the peak day demand of the system. Refer to Section R309-510-7 for information on determining the peak day demand of the system.

     

    KEY: drinking water, minimum sizing, water conservation

    Date of Enactment or Last Substantive Amendment: April, 2009[March 8, 2006]

    Notice of Continuation: April 2, 2007

    Authorizing, and Implemented or Interpreted Law: 19-4-104

     

     

Document Information

Effective Date:
4/21/2009
Publication Date:
03/15/2009
Filed Date:
02/26/2009
Agencies:
Environmental Quality,Drinking Water
Rulemaking Authority:

Section 19-4-104

Authorized By:
Ken Bousfield, Director
DAR File No.:
32406
Related Chapter/Rule NO.: (1)
R309-510. Facility Design and Operation: Minimum Sizing Requirements.